|
| 1 | Hiringchargesof JCBfor shiftingofpoles, strengthening of tiltedpoles,excavation of trenches etc |
| 2 | Making cement concrete foundationincludingexcavation(60x60x150)cmdeepin1:3:6cementconcrete20x25mmstonemetal,(45x45x45)cm/45cmdia.x45cmheightplinthdulyplastered,withnecessarycuringandfinishingcomplete.(above6mto9 m poles) |
| 3 | Supplyinganderectingsteel tubularswagedpole139.7x114.3x88.9mm dia with 4.5x3.65x3.25 mmthickness (4.5+1.75+1.75m) lengthrespectivelyandtotal8.0mlongwithpole cap, base plate in providedfoundation. (weight 101kg) as perspecification no. OH-PL/STP |
| 4 | Supplying & erecting three phase,415V,street lightcontrolpaneluptothemaxloadof12kW,TPNMCB63A,powdercoatedCRCA14SWGsheet,outdoor type, having IP54,IK10protection, suitable ratingcontactor,24hrs.astronomical timeswitchwithminimum5 years battery back up,auto/manual selectorswitch,ON/OFFpushbuttons,indicatorlamps,controlwiring, metering device, etc. forautomatic operation, withovercurrent, short circuit,earthfaultprotectiononp |
| 5 | Supplying and laying (includingexcavationof suitablewidth&depthup to90 cm) 75mmoutsidedia.doublewall corrugatedpipes(DWC)of HDPE for enclosing cable belowground/road surface, complete. |
| 6 | Supplying,erecting&terminatingFRXLPE insulated, galvanised steelformedwire armoured (strip) cable1100V,4core10sq.mm.aluminiumconductor complete erected withglands& lugs, onwall/ trusses/poleorlaidinprovidedtrench/pipeasperspecification no. CB-LT/AL. |
| 7 | Supplying and erecting integratedLED street light fitting 40 to 50WIP65&IK08classhavingsinglepiecepressuredie-castaluminiumhousing,havingsystemlumensoutputofMin.4400 Lumens,min. efficacy of 110lumen/W, CRI>70, CCT upto6500K,THD0.95, operating range of140-270V, inbuiltsurgeprotectionof10kV, Life class of 50,000Hrs. atL70B50, including driver completewith 3 Years warranty as perspecification No FG-ODF/FLS2. |
| 8 | Providing pipe type earthing with40mm. dia. G.I. pipe or 20 mm dia.G.I. Rodcomplete with all materials testingand recording the results as perspecification no.EA-EP Please Enable Macros to View BoQ information |