| 1 | Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: |
| 2 | All kind of soil 100% |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 40mm nominal size) nallah ncluding all carriage complete.. |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m. |
| 5 | Providing and fixing of nitrile 24mm thick with full blcak tapping glass wool 50mm thick with thermofoam of 12mm thick with full black taping for exposed distribution line/ main line/FHTC line (wherever necessary as per site requirement) including all carriage complete Job. |
| 6 | Providing and fixing of nitrile 24mm thick with full blcak tapping glass wool 50mm thick with thermofoam of 12mm thick with full black taping and also cover with aluminium sheet 28 guage for exposed distribution line/ main line/FHTC line (wherever necessary as per site requirement) including all carriage complete Job. |
| 7 | Providing/ Laying and fitting of HDPE pipes complete including cost of pipes and required fittings as per the direciton of site Engineer incharge including all carriage complete. |
| 8 | HDPE Pipe 63mm dia |
| 9 | HDPE Pipe 50mm dia |
| 10 | HDPE Pipe 40mm dia |
| 11 | HDPE Pipe 32mm dia |
| 12 | HDPE Pipe 25mm dia |
| 13 | HDPE Pipe 20mm dia |
| 14 | Centering and shuttering including strutting, propping etc. and removal form for:- |
| 15 | Walls (any thickness) including attached pilasters buttresses, plinth and string course etc. |
| 16 | Providing and laying/fitting of HDPE pipes complete including cost of pipes and required fittings as per the direciton of site Engineer incharge including all carriage complete. |
| 17 | Ball valve/ Gate valve 32-50mm dia. |
| 18 | Gate valve 40-50mm dia. |
| 19 | Air release valve 40-50mm dia. |
| 20 | Sockets, Bends, Tee, Reducer, Reducer Tee, Union, Elbow, Reducing Union, (Heat/Butt fision fiting of different dias as per site requirement as per the direction of site Engineer, Incharge. |
| 21 | Providing and fixing of angle iron frame (40x40x5mm thick ) for man hole cover of tank with 5mm thick steel plateembedded in cement concrete including locking system etc size required as per the direction of site Engineer, inchagare complete job. Please Enable Macros to View BoQ information |