| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil : |
| 2 | Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including all carriages of material involved |
| 3 | (CEMENT CONCRETE CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carriages of material involved |
| 4 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry including all carriages of material involved |
| 5 | Polygonal/Random Rubble Masonry uncoursed, brought to courses with quarry stones laid in dry in foundation and plinth incl cost of bond stones including all carriages of material involved |
| 6 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including all carriages of material involved |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). PCC Wall including all carriages of material involved |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:4.6.1 Foundations, footings, bases for columns. PCC Drain |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. PCC wall |
| 11 | Cement concrete flooring 1:2:4 finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 40 mm thick with 20 mm nominal size stone aggregate including all carriages of material involved. |
| 12 | Pointing on stone work with cement mortar 1:3 Flush /Ruled Pointing including carriages of materials involved |
| 13 | Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Including loading, unloading,haulages, royality,octroi charges, form work etc complete. |
| 14 | Double Row 1200 mm Pipe Culvert |
| 15 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 16 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil |
| 17 | Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including all carriages |
| 18 | (CEMENT CONCRETE CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carriages of material involved |
| 19 | Bedding for Pipe.Type A (Concrete Cradle) Bedding. Laying concrete cradle bedding with M15 Grade Cement Concrete as per Clause 1105 (i)Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15 Nominal mix (1:2.5:5) |
| 20 | (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)including all carriages of material involved |
| 21 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double Row.Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106.1200 mm dia |
| 22 | Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Including loading, unloading,haulages, royality,octroi charges, form work etc complete. |
| 23 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 24 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars |
| 25 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 26 | SHOULDERS FROM AVALIABLE MATERIAL:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5. |
| 27 | Total Construction cost without GST Please Enable Macros to View BoQ information |