| 1 | Part -AChandanwari to Zojobal Erection and fixing in position of shelter sheds (from availble store materials) of size 20'x30' by way of following specifications / components, including all necessary needs at site including dismembering as per below. |
| 2 | a) Leveling of ground including removal of slash / slides / snow etc. and making ground even for erection at site incl. laying of cement concrete 1:2:4 mix |
| 3 | b) Fixing of polycarbonate sheets for top and sides with screw revettes/ J or L hooks as per directions of Engineer-in-charge complete at each site including cost of screw revettes to be providing by the agency ensuring proper overlap to make it leak proof. |
| 4 | c) Placing of 19mm thick ply board sheets on Hollow section frames at required height from ground level, including placement of thermocoal and turpal and making floors even and smooth at each site. |
| 5 | d) Keeping available by Engagement of (1) No skilled labour with uniform for watch and ward / cleaning of sheds / surroundings round the clock till complection of yatra period at each site. |
| 6 | e) P/F of screw revettes/ or L hooks for sides and anchoring including all carriages / head load upto site of work complete. 4\\" long (48 no's each sheet) (To be provided by the agency) |
| 7 | f) Carriage of all store material (structural steel) involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 8 | g) Carriage of all store material (plywoodl) involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 9 | h) Carriage of all store material ( themocoal and tarpal) involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 10 | i) Carriage of all store material Polycarbonate involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 11 | J) Engagement of skilled black smith along with welding machine Gen set and other allied equipments required for welding purpose all complete. |
| 12 | k) Engagement of ponies with ponie walla for superviory staff during yatra period for errection of sheds and after dismantling of same complete. |
| 13 | m) Providing And installation of 25mm dia nylon rope |
| 14 | n)Supply of 6mm thick polycarbonate sheets for top and roofs and sides with screws as per direction of incharge Engineer. |
| 15 | o)Supply and fixing of structural steel (hollow) work in built-up section of purlins rafters and other framed works incl. cutting, positioning and placing. |
| 16 | P)Supply of 19 mm thick plywood |
| 17 | q) Supply of 12mm Thermocol(foam) over ply wood |
| 18 | r)Providing and laying of Water proof Tarpaulin sheets 110 gsm LDPE or woven plastic tarps all job complete (600 sft) |
| 19 | Burzakoot to poshpathri (Part B) Erection and fixing in position of Hut type shelter sheds (from availble store materials) of size 20'x30' by way of following specifications / components, including all necessary needs at site including dismembering as per below. |
| 20 | a) Leveling of ground including removal of slash / slides / snow etc. and making ground even for erection at site incl. laying of cement concrete 1:2:4 mix |
| 21 | b) Fixing of polycarbonate sheets for top and sides with screw revettes/ J or L hooks as per directions of Engineer-in-charge complete at each site including cost of screw revettes to be providing by the agency ensuring proper overlap to make it leak proof. |
| 22 | c) Placing of 19mm thick ply board sheets on Hollow section frames at required height from ground level, including placement of thermocoal and turpal and making floors even and smooth at each site. |
| 23 | d) Keeping available by Engagement of (1 ) No skilled labour with uniform for watch and ward / cleaning of sheds / surroundings round the clock till complection of yatra period at each site. |
| 24 | e) P/F of screw revettes/ or L hooks for sides and anchoring including all carriages / head load upto site of work complete. 4\\" long (48 no's each sheet) (To be provided by the agency) |
| 25 | f) Carriage of all store material (structural steel) involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 26 | g) Carriage of all store material (plywoodl) involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 27 | h) Carriage of all store material ( themocoal and tarpal) involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 28 | i) Carriage of all store material Polycarbonate involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 29 | J) Engagement of skilled black smith along with welding machine Gen set and other allied equipments required for welding purpose all complete. |
| 30 | k) Engagement of ponies with ponie walla for superviory staff during yatra period for errection of sheds and after dismantling of same complete. |
| 31 | m) Providing And installation of 25mm dia nylon rope |
| 32 | n)Supply of 6mm thick polycarbonate sheets for top and roofs and sides with screws as per direction of incharge Engineer. |
| 33 | o)Supply and fixing of structural steel (hollow) work in built-up section of purlins rafters and other framed works incl. cutting, positioning and placing. |
| 34 | P)Supply and placing of 19 mm thick plywood |
| 35 | q) Supply of 12mm Thermocol(foam) over ply wood |
| 36 | r)Providing and laying of Water proof Tarpaulin sheets 110 gsm LDPE or woven plastic tarps all job complete (600 sft) |
| 37 | Pospathri to Holy Cave (Part C) Erection and fixing in position of Hut type shelter sheds (from availble store materials) of size 20'x30' by way of following specifications / components, including all necessary needs at site including dismembering as per below. |
| 38 | a) Leveling of ground including removal of slash / slides / snow etc. and making ground even for erection at site incl. laying of cement concrete 1:2:4 mix |
| 39 | b) Fixing of polycarbonate sheets for top and sides with screw revettes/ J or L hooks as per directions of Engineer-in-charge complete at each site including cost of screw revettes to be providing by the agency ensuring proper overlap to make it leak proof. |
| 40 | c) Placing of 19mm thick ply board sheets on Hollow section frames at required height from ground level, including placement of thermocoal and turpal and making floors even and smooth at each site. |
| 41 | d) Keeping available by Engagement of (1) No skilled labour with uniform for watch and ward / cleaning of sheds / surroundings round the clock till complection of yatra period at each site. |
| 42 | e) P/F of screw revettes/ or L hooks for sides and anchoring including all carriages / head load upto site of work complete. 4\\" long (48 no's each sheet) (To be provided by the agency) |
| 43 | f) Carriage of all store material (structural steel) involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 44 | g) Carriage of all store material (plywoodl) involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 45 | h) Carriage of all store material ( themocoal and tarpal) involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 46 | i) Carriage of all store material Polycarbonate involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 47 | J) Engagement of skilled black smith along with welding machine Gen set and other allied equipments required for welding purpose all complete. |
| 48 | k) Engagement of ponies with ponie walla for superviory staff during yatra period for errection of sheds and after dismantling of same complete. |
| 49 | m) Providing And installation of 25mm dia nylon rope |
| 50 | n)Supply of 6mm thick polycarbonate sheets for top and roofs and sides with screws as per direction of incharge Engineer. |
| 51 | o)Supply and fixing of structural steel (hollow) work in built-up section of purlins rafters and other framed works incl. cutting, positioning and placing. |
| 52 | P)Supply and placing of 19 mm thick plywood |
| 53 | q) Supply of 12mm Thermocol(foam) over ply wood |
| 54 | r)Providing and laying of Water proof Tarpaulin sheets 110 gsm LDPE or woven plastic tarps all job complete (600sft) Please Enable Macros to View BoQ information |