| 1 | Protection Wall |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil |
| 3 | Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including all carriages of material involved |
| 4 | (CEMENT CONCRETE CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carriages of material involved |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including carriage of all materials involved. |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 8 | Providing weepholes in brick masonry/ stone masonry, plain / reinforced concrete abutments, wing wall. Return wall with 100mm dia PVC pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face complete as per drawings and technical specifications clause 614, 709, 1204.3.7. |
| 9 | Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Including loading, unloading,haulages, royality,octroi charges, form work etc complete. |
| 10 | Repair of Damaged RRM |
| 11 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like Cement mortar 1:6 (1 Cement : 6 coarse sand) including all carriages of material involved |
| 12 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11 |
| 13 | PARAPETS |
| 14 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with4.5.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). RD 600 to RD 900 at spots including all carriages of material involved |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 16 | CEMENT PLASTER (IN FINE SAND)12mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand) including all carriages of material involved |
| 17 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915 |
| 18 | Total Construction cost without GST Please Enable Macros to View BoQ information |