Name of Work:- Restoration of Road T01 Wussan to Ari Via Chattergul, Package No.JK13-3010
Sl. No.
Item Description
1
Dewatering / Diversion of Nallah during execution of work if found necessary including diversion of traffic during execution and makings the things good after completion of job incl. hire charges of land if found necessary.
2
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil :
3
Providing and laying of boulder apron laid in wire crates with 4 mm dia Black Anealed wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including cost of carriage of all materials from approved source to site of work, all leads , lift, loading, unloading and octroi (Finished work to be measured).
4
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
5
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages of material involved
6
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars
7
Providing & fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing & staircase railing & similar work like culverts etc including applying a priming coat of approved steel primer. ( MS Tube (Medium) 40mm nominal bore, GI Pipes 40mm nominal bore & ERW Tubes 40mm nominal dia)
8
Total Construction cost without GST Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.