| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | Providing and laying 1st class bedding on well compacted sand, moorum or approved material asper clause 1105(ii) including carriage |
| 3 | (CEMENT CONCRETE CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)including all carriages of material involved |
| 4 | (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)including all carriages of material involved |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)including all carriages of material involved |
| 6 | Providing and alying in position specified grade of rienforced cement concrete including curing but excluding the cost of centring, shuttering ,finishing, and reinforcement in 1:1.5:3 mix including all xcarriages of material involved |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth levelMild steel and medium tensile steel bars |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls etc |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 10 | Backfilling behind abutment, wing wall and return wall complete as per drawing and technical specification clause 1204.3.8 granular material including all carriages. |
| 11 | Total Construction cost without GST Please Enable Macros to View BoQ information |