| 1 | Earth Work |
| 2 | a)Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1 |
| 3 | b).Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per clause 1603.2 |
| 4 | c)Excavation for roadway in hard rock by mechanical means, (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification clause 302.3.5 |
| 5 | PCC TOE WALLS |
| 6 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 7 | Providing and laying hand packed stone soling in foundation ,incl ramming watering ramming carriage from approved source to site with all leads, lifts, loading, unloading, stacking and octori incl all carriages.(Finished work ) |
| 8 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clause 614, 709,1204.3.7 |
| 9 | Providing and laying in position cement concrete of specified grade M15 including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including all carriages of material involved |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for walls, retaining walls etc |
| 11 | Backfilling behind abutment, wing wall and return wall complete as per drawing and technical specification granular material including all carriages. |
| 12 | DRAIN |
| 13 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 14 | Providing and laying hand packed stone soling in foundation ,incl ramming watering ramming carriage from approved source to site with all leads, lifts, loading, unloading, stacking and octori incl all carriages.(Finished work ) |
| 15 | providing and laying in position cement concrete of specified grade M10 including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)including all carriages of material involved |
| 16 | Providing and laying in position cement concrete of specified grade M15 including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Including carriage of all materials involved. |
| 17 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete.(50mm thick) Including carriage of all materials involved. |
| 18 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 19 | Backfilling behind abutment, wing wall and return wall complete as per drawing and technical specification granular material including all carriages. |
| 20 | RR MASONARY R/Wall / Breast Wall |
| 21 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 22 | Providing and laying hand packed stone soling in foundation ,incl ramming watering ramming carriage from approved source to site with all leads, lifts, loading, unloading, stacking and octori incl all carriages.(Finished work ) |
| 23 | providing and laying in position cement concrete of specified grade M7.5 including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size)including all carriages of material involved |
| 24 | Random Rubble Masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like. Cement mortar 1:6(1 Cement :6 Coarse sand) Quarry including all carriages of material involved |
| 25 | Polygonal/ Random Rubble masonry, uncoursed brought to course with quarry stones laid DRY in foundation and plinth incl cost of bond stones.including all carriages complete job |
| 26 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause 1204.3.8 Including carriage of all materials involved. |
| 27 | Providing PCC M-20 coping on the top of wing wall, return wall etc. complete as per drawing and technical specification including all carriages complete job |
| 28 | CRASH BARRIER |
| 29 | Providing and erecting W metal beam crash barrier comprising 3mm thick corrugated sheet metal beam rail, 70 cm above road/ground level fixed on ISMC series channel vertical posts,150X75X5 mm spaced 2M C/C 1.80 M high, 110 cm below ground level all steel parts and fitments to be galvanised by hot dip process , all fittings to confirm to IS 1367 and IS 1364 metal beam rail to be fixed on vertical posts with spacer channel section 150X75X50 mm, 330 mm long complete as per clause 810 including Earthwork in excavation by mechanical means and disposal of same by engineer incharge in all kinds of soil and embedding of vertical channel posts in PCC M15 (1:2:4) block of size 0.45x0.45x1.1m and cost of nut and bolts including loading unloading cost of carriage of all materials to site of work complete job(finished job to to be measured) including all carriages of material involved and including trench excavation for foundation of size 0.45x0.45x1.12 m and concreting of same in M15(1:2:4) complete jobfinished work to be measured |
| 30 | Crate Work (River Training) |
| 31 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 32 | Providing and laying of quarry/Boulder stone apron laid in wire crates with 4 mm dia Black Anealed wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders/quarry weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 , )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) |
| 33 | Back filling behind abutments,wing walls & return walls complete as per drawings and technical specifications clause 1204.3.8(material obtained from Excavation of Hard/soft rock))including all carriage within the project site ,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) filling material available at site |
| 34 | 750 mm Cross drainage Pipe |
| 35 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 36 | Providing and laying hand packed stone soling in foundation ,incl ramming watering ramming carriage from approved source to site with all leads, lifts, loading, unloading, stacking and octori incl all carriages.(Finished work ) |
| 37 | Back Filling over Pipe complete as per drawing and technical specification granular material including all carriages clause 1204.3.8 |
| 38 | Random Rubble Masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like. Cement mortar 1:6(1 Cement :6 Coarse sand) Quarry including all carriages of material involved |
| 39 | Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets.(750 mm dia) |
| 40 | Total Construction cost without GST Please Enable Macros to View BoQ information |