| 1 | Dismentaling pucca brick or lime work including stacking serviceable materials in countable stacks eithin 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I |
| 2 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 3 | Dismentaling old plaster and pointingin cement or lime and racking out joints to 15mm depth watering and disposal ofunserviceable materials with all leads all complete as per direction of E/I |
| 4 | EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I. |
| 5 | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) |
| 6 | EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) |
| 7 | Providing designation 75-B BRICK FLAT SOLING joints filled with local sand including cost of watering,taxes and royalty all complete as per building specification and direction of Engineer Incharge. |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -all work up to plinth level: (1:2:4) (1 cement : 3 coarse sand (zone III ) : 4 graded stone aggregate 20 mm nominal size ) |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : |
| 11 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 12 | Providing designation 75A brick in work in CM(1;6) in founadation and plinth -do-(up to P.L) |
| 13 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. with water proof ply 12 mm thick |
| 17 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL)8 MM DIA 20 % of .732 mt |
| 18 | 10 MM DIA 30 % of .732 mt |
| 19 | 12 MM DIA 50 % of .732 mt |
| 20 | Providing 12mm thick cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per specification and direction of E/I. |
| 21 | Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper scaffolding , curing and taxes all complete as per building specification and direction of E/I. |
| 22 | Supplying, fitting and fixing M.S. grill gate with M.S. grill made of 20X6mm M.S. flats or 16mm M.S. square bars fitted on 25X25X6mm M.S. Angle frame of size 60X60X6mm. Including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in P.C.C. (1:2:4) blocks of required size applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I. |
| 23 | Providing one coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning removing dust dirt scales smokes and grease and cleaning the surface throughly including cost of scaffolding and taxes all complete as per building specification and direction of E/I |
| 24 | Providing two coat of synthetic enamel paint of approved shade and make over steel surface including cleaning the surface throughly , scaffolding and taxes all after removing dirt including scales smokes, grease and sand papering including cost of scaffolding and taxes all complete as per building specification and direction of E/I. |
| 25 | CARRAIGE OF MATERIALSBRICKS LEAD |
| 26 | SAND LEAD |
| 27 | STONE CHIPS LEAD |
| 28 | STEEL |
| 29 | CEMENT |
| 30 | Add 18% for G.S.T. |
| 31 | Labour Cess Please Enable Macros to View BoQ information |