| Sl. No. | Item Description |
| 1 | Item Code 01:Emptying Diesel & Oil tanks in the barge. Providing closed containers in the yard for storing the drained diesel & oil from the tanks in the barge. Refilling diesel & oil to the barge after completion of the repair works.Note : Entire materials, tools, consumables & manpower required for the emptying & refilling of Diesel & Oil tanks in the barge are under the scope of contractor. |
| 2 | Item Code 02:Hull Steel Plate Renewal-Scope of work includes replacement of damaged, corroded & dented steel plates of the hull. Areas that are marked by Classification society/KIV/FACT for steel renewal shall be repaired by Contractor. All material used for the steel renewal works shall be confirming to IRS Grade A. Only welders approved by the class shall be assigned for the repair works. WPS, PQR & WQT for the same shall be submitted to class/KIV/FEW for the reviewNDT tests like RT,UT,DP,MPI etc.. if required after the carrying out the repair works shall be under the scope of contractor.Note: Entire materials, tools, consumanles & manpower required for the steel plate renewal works of the barge are under the scope of cotractor. |
| 3 | Item Code 03:Hull Structural Renewal-Scope of work includes replacement of damaged, corroded & dented structural of the hull. Areas that are marked by Classification society/KIV/FACT for steel renewal shall be repaired by Contractor. All material used for the steel renewal works shall be confirming to IRS Grade A. Only welders approved by the class shall be assigned for the repair works. WPS, PQR & WQT for the same shall be submitted to class/KIV/FEW for the reviewNDT tests like RT,UT,DP,MPI etc.. if required after the carrying out the repair works shall be under the scope of contractor.Note: Entire materials, tools, consumables & manpower required for the steel plate renewal works of the barge are under the scope of cotractor. |
| 4 | Item Code 04:Renewal of Anodes:All Type A ( 8 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approved and shall contain zinc content of atleast 98%.Note: Entire materials, tools, consumables & manpower required for replacing Type A zinc anodes are under scope of contractor. |
| 5 | Item Code 05:Renewal of Anodes:All Type B ( 5 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approved and shall contain zinc content of atleast 98%.Note: Entire materials, tools, consumables & manpower required for replacing Type B zinc anodes are under scope of contractor. |
| 6 | Item Code 06 :Renewal of Anodes:All Type C ( 3 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approved and shall contain zinc content of atleast 98%.Note: Entire materials, tools , consumables & manpower required for replacing Type C zinc anodes are under scope of contractor. |
| 7 | Item Code 07: Replacement of damaged 'D' type hollow fenders(Base : 150 mm x 150 mm) of the Barge. Fasteners required for fixing the Fenders shall be under the scope of contractor.Note: Entire materials, tools, consumbales & manpower required for the replacement of D-fender are under the scope of contractor. |
| 8 | Item Code 08:Fore peak space cleaning:Fore peak space shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge,muck,debris & mud in the fore peak space shall be cleared and disposed off to shoreNote: Entire materials, tools, consumables & manpower required for the cleaning of Fore peak space shall be under the scope of contractor. |
| 9 | Item Code 09:Cargo hold cleaning:Cargo hold shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge,muck,debris & mud in the cargo hold shall be cleared and disposed off to shore.Note: Entire materials , tools, consumables & manpower required for the cleaning of cargo hold space shall be under the scope of contractor. |
| 10 | Item Code 10:Ballast Tank Cleaning:Ballast Tanks shall be cleaned and made ready for the Classification agency/KIV Inspection.Sludge, muck, debris & mud in ballast tanks shall be cleared and disposed off to shore.Note: Entire materials, tools, consumables & manpower required for the cleaning of Ballast Tanks shall be under the scope of contractor. |
| 11 | Item Code 11:Chain Locker & Store space cleaning-Chain Locker & Store space shall be cleaned and made ready for Classification agency/KIV inspectionSludge,muck,debris, oil, grease & mud in the chain locker & Store space shall be cleaned & disposed off to shore.Note: Entire materials, tools, consumables & manpower required for the cleaning of Chain Locker & Store space shall be under the scope of contractor. |
| 12 | Item Code 12:Fresh water Tanks Cleaning-Fresh water tanks shall be cleaned and made ready for Classification agency/KIV Inspection.Sludge,muck,debris and mud in fresh water tanks shall be cleared & disposed off to shore.Note: Entire materials, tools, consumables & manpower required for the cleaning of fresh water tanks shall be under the scope of contractor. |
| 13 | Item Code 13:Fuel Oil Tanks Cleaning:Fuel oil tanks shall be cleaned and made ready for Classification agency/KIV Inspection.Sludge & muck in the fuel oil tanks shall be cleared & disposed off to shore.Note: Entire materials, tools, consumables & manpower required for the cleaning of fuel oil tanks shall be under the scope of contractor. |
| 14 | Item Code 14:Sea Chest:Sea Chest to be opened and cleaned. Mud, muck & Sludge to be removed from the sea chest and disposed ashore.Gratings to be inspected and cleaned. All fasteners of the gratings to be replaced.Note: Entire materials & manpower required for the cleaning & repair works in Sea Chest shall be under the scope of contractor. |
| 15 | Item Code 15:Procurement of propellers:Supply of starboard & port side propellers as per drg No. VM/FEW/001Material of Construction: Mn Bronze Gr.Cu 1. Propellers supplied shall be of class approved. |
| 16 | Item Code 16:Fitment of Propellers:Removal of existing propellers of the barge from the propeller shaft.Repalcing it with the new propellers.Fastners & Gaskets used in the hub and sealing flange to be replaced with new ones.Note: Entire materials, tools, consumables and manpower required for the replacement of the propellers are under scope of contractor. |
| 17 | Item Code 17:Repair of Propeller Shafts:Propeller shafts to be removed from the stern tube. Entire shaft surface shall be DP tested to check whether any surface cracks or abrasion marks or striations are present. If cracks or striations are found, these shall be suitably repaired by welding.Deflection of the shafts to be measured and confirmed within limits. If not, bend correction and balancing of the shafts to be done.Threaded portion and keyways on shaft to be inspected. Any damages on these portions to be repaired.Aft & Forward cutlass rubber lined journal bearing/bushes of the propeller shafts to be replaced with new one prior to fixing of the shaft. New bearings shall be of class approved. Rope guards on the shaft shall be checked for any damages. Damages,if any, shall be repaired.All fasteners to be replaced with new ones.Entire fasteners used for fixing the key, bearings, Gland Follower, Rope guard & Stub shaft shall be of new ones and confirming to specifications mentioned in Drg No: VM/FEW/001/301. After completion of the repair works, propeller shafts are to be refitted to the stern tube Note: Entire materials and manpower required for the repair works(as mentioned above) in propeller shaft are under the scope of contractor. |
| 18 | Item Code 18Rudder: Rudder Blade, Rudder Stock(Shaft) & Tiller shall be completely removed and inspected.Rudder Blade coupling bolts to be replaced. Any damages on the rudder blade shall be rectified. Entire surface of the rudder stock shall be DP tested to check whether any surface cracks or abrasion marks or striations are present. If cracks or abrasion marks or striations are found, these shall be suitably repaired by welding.Deflection of the rudder stock to be measured and confirmed within limits. If not, bend correction and of the shafts to be done.Threaded portion and keyways on rudder stock to be inspected. Any damages on these portions shall be repaired.Upper & Lower cutlass ruber line journal bearing of the rudder stock shall be replaced. Bearing housing located at both upper and lower side shall be checked for any damages. Damages, if any, shall be repaired.Tiller & Tiller Rod shall be inspected for any damages. Any damages found shall be suitable repaired.All fasteners to be replaced with new ones. Fasteners replaced shall be confirming to the specifications mentioned in Drg no.VM/FEW/001/208 & VM/FEW/001/208ANote: Entire materials, tools, consumables & manpower required for the repair works (as mentioned above) of the rudder, rudder stock & tiller are under the scope of contractor. |
| 19 | Item Code 19: Overhauling of Existing Steering System in FACT Pragatiyan barge:Hydraulic Lines of the steering system shall be checked for any leakages and damages. If any damages are found in the hydralic lines, same shall be replaced with new ones of same pressure rating. Leakage if any at coupling ends of line shall be arrested.Hydraulic cylinder for actuating the rudders shall be overhauled. All seals ( Piston seals, Piston rod seals, Cushion seals, Cylinder Head seals etc..) & wear strips/rings shall be replaced. Piston rod, Piston, tie-rods, Barrel, Heads & couplings shall be inspected for any damages. Directional control valves/Servo valves /relief valves in the steering system to be inspected & Overhauled. O-rings in directional control valves/Servo valves to be changed. Solenoids of the valves to be checked for the actuation. Solenoids to be replaced if actuation of the spool is not done properly. Valve seats in the relief valves to replaced and pressure tested to the required pressure.Hydraulic Pump to be removed from Port side engine drive and overhauled. Seals & bearings in the helm pump & engine driven hydraulic pump shall be replaced with new ones. Fresh Hydraulic oil to be filled in the Lines and steering fluid tank by the contractor after carrying out required maintenance works.Note: Entire materials and manpower required for the overhauling |
| 20 | Item Code 20:Providing new independent electric motor driven steering system for FACT Pragatiyan barge:Scope of work includes providing new independent electric motor driven steering system along with power pack in addition to engine powered steering system in FACT Pragatiyan barge. The new independent electric motor driven steering system shall be integrated to the barge with the existing engine driven steering system as back up.Power pack with electric motor, directional control valves, hydraulic oil, cables, pressure relief valves, hydraulic hoses etc.. required for the new independent steeing system shall be in scope of contractor. Note: All materials, manpower, consumables & tools required for the job mentioned above shall be in scope of contractor. |
| 21 | Item Code 21:Electrical System:Main switch board, all junction box circuit breakers, control panels of equipment on deck, wheel house and engine room to be thoroughly examined. Damaged cables, MCBs, RCCB, breakers to be repaired and replaced.Payment for the cables procured shall be paid extra against the document evidence. Safety measures in the electrical system like overload trip, reverse current trip, low voltage trip and interlock between the breaker are to be shown to the surveyor.Note: Entire materials, tools, consumables and manpower required for the inspection, repair works(as mentioned above) & testing of the electrical system are under the scope of contractor. |
| 22 | Item Code 22:Inspection & testing of fire sensors/alarm, Smoke sensor & bilge sensor/alarm:The sensors and alarms shall be inspected for proper working condition. If sensons/alarms are found to be not operating, same shall be repaired or replaced with with new ones. Contractor shall arrange the new sensors/alarms, if needed to be replaced based on the recommendation from classification agency. Payment for the procurement of the sensors/alarm shall be paid extra against the document evidence.Note: Entire materials, tools, consumables and manpower required for the inspection, repair works(as mentioned above) & testing of the alarms/sensors are under the scope of contractor. |
| 23 | Item Code 23:Anchor :Anchor and anchor chain shall be lifted and removed from the chain locker. Entire surface of the anchor & anchor chain shall be cleaned thoroughly by chipping/scrapping/grit blastng.Swivels, shackles,stud links & open links of the anchor chain shall be inspected for the damages and thickness guaging of the links shall be done. Reports for the same shall be submitted to Classifcation society/KIV for the review.All moving components of the anchor to be freed and anchor to be painted with 2 coats of coal tar epoxy paint after surface preparation. Note: Entire materials, tools, consumables and manpower required for the repair works of anchor and anchor chains(as mentioned above) are under the scope of contractor |
| 24 | Item Code 24:Windlass:General servicing of the windlass to be done. All bearings & pins shall be lubricated. All brake linings & clutches plates to be inspected for any damages. Any damaged bearings, brake lining & clutch plates shall be replaced as per the recommendation of the Classification agency/KIV/FACT.Motor side to be de-coupled. Bearings of the motor to be replaced and windings of the motor shall be varnished. Fresh oil to be replaced in the gear box of windlass. Note: Entire materials and manpower required for the overhauling works(as mentioned above) of windlass are under the scope of contractor. |
| 25 | Item Code: 25Renewal of 150 NB, ASTM SCH40, Seamless/MS Class C -ERW pipesScope of work includes replacement of damaged piping in FACT Pragatiyan barge. Only skilled fitters & welders shall be assigned for the replacement of the damaged piping. Pipes, consumables ,tools & manpower required for the replacement shall be in scope of contractor. |
| 26 | Item Code: 26Renewal of 100 NB, MS- Galvanized PipesScope of work includes replacement of damaged piping in FACT Pragatiyan barge. Only skilled fitters & welders shall be assigned for the replacement of the damaged piping. Pipes, consumables ,tools & manpower required for the replacement shall be in scope of contractor. |
| 27 | Item Code: 27Renewal of 65 NB, ASTM SCH40, Seamless/MS Class C -ERWScope of work includes replacement of damaged piping in FACT Pragatiyan barge. Only skilled fitters & welders shall be assigned for the replacement of the damaged piping. Pipes, consumables ,tools & manpower required for the replacement shall be in scope of contractor. |
| 28 | Item Code: 28Renewal of 50 NB, ASTM SCH40, Seamless/MS Class C -ERWScope of work includes replacement of damaged piping in FACT Pragatiyan barge. Only skilled fitters & welders shall be assigned for the replacement of the damaged piping. Pipes, consumables ,tools & manpower required for the replacement shall be in scope of contractor. |
| 29 | Item Code: 29Renewal of 40 NB, ASTM SCH40, Seamless/MS Class C -ERWScope of work includes replacement of damaged piping inFACT Pragatiyan barge. Only skilled fitters & welders shall be assignedfor the replacement of the damaged piping. Pipes, consumables ,tools & manpower required for the replacement shall be inscope of contractor. |
| 30 | Item Code: 30Renewal of 32NB, ASTM SCH40, Seamless/MS Class C -ERWScope of work includes replacement of damaged piping inFACT Pragatiyan barge. Only skilled fitters & welders shall be assignedfor the replacement of the damaged piping. Pipes, consumables ,tools & manpower required for the replacement shall be inscope of contractor. |
| 31 | Item Code: 31Renewal of 25 NB, ASTM SCH40, Seamless/MS Class C -ERWScope of work includes replacement of damaged piping in FACT Pragatiyan barge. Only skilled fitters & welders shall be assigned for the replacement of the damaged piping. Pipes, consumables ,tools & manpower required for the replacement shall be in scope of contractor. |
| 32 | Item Code: 32Renewal of 20 NB, ASTM SCH40, Seamless/MS Class C -ERWScope of work includes replacement of damaged piping in FACT Pragatiyan barge. Only skilled fitters & welders shall be assigned for the replacement of the damaged piping. Pipes, consumables ,tools & manpower required for the replacement shall be in scope of contractor. |
| 33 | Item Code: 33Renewal of 15 NB, ASTM SCH40, Seamless/MS Class C -ERWScope of work includes replacement of damaged piping in FACT Pragatiyan barge. Only skilled fitters & welders shall be assigned for the replacement of the damaged piping. Pipes, consumables ,tools & manpower required for the replacement shall be in scope of contractor. |
| 34 | Item Code:34Welding of 150NB, ASTM SCH40, Seamless/MS Class C -ERW pipe joints.Scope of work includes joint peparation, fitup & welding of new pipe joints.Only class approved welders shall be assigned for the welding works.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 35 | Item Code:35Welding of 100NB, MS-Galvanized Pipe JointsScope of work includes joint peparation, fitup & welding of new pipe joints.Only class approved welders shall be assigned for the welding works. Materials, tools, manpower & consumables required for the jobshall be in scope of contractor |
| 36 | Item Code:36Welding of 65 NB, ASTM SCH40, Seamless/MS Class C -ERW Pipe JointsScope of work includes joint peparation, fitup & welding of new pipe joints.Only class approved welders shall be assigned for the welding works.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 37 | Item Code:37Welding of 50 NB, ASTM SCH40, Seamless/MS Class C -ERW Pipe JointsScope of work includes joint peparation, fitup & welding of new pipe joints.Only class approved welders shall be assigned for the welding works.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 38 | Item Code:38Welding of 40 NB, ASTM SCH40, Seamless/MS Class C -ERW Pipe JointsScope of work includes joint peparation, fitup & welding of new pipe joints.Only class approved welders shall be assigned for the welding works.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 39 | Item Code:39Welding of 32 NB, ASTM SCH40, Seamless/MS Class C -ERW/GI Class C-ERWPipes JointsScope of work includes joint peparation, fitup & welding of new pipe joints.Only class approved welders shall be assigned for the welding works.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 40 | Item Code:40Welding of 25 NB, ASTM SCH40, Seamless/MS Class C -ERW/GI Class C-ERWPipes JointsScope of work includes joint peparation, fitup & welding of new pipe joints.Only class approved welders shall be assigned for the welding works.Materials, tools, manpower & consumables required for the jobshall be in scope of contractor |
| 41 | Item Code:41Welding of 20 NB, ASTM SCH40, Seamless/MS Class C-ERW/GI Class C-ERWPipe JointsScope of work includes joint peparation, fitup & welding of new pipe joints.Only class approved welders shall be assigned for the welding works.Materials, tools, manpower & consumables required for the jobshall be in scope of contractor |
| 42 | Item Code:42Welding of 15 NB, ASTM SCH40, Seamless/MS Class C-ERW/GI Class C-ERWPipe JointsScope of work includes joint peparation, fitup & welding of new pipe joints. Only class approved welders shall be assigned for the welding works.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 43 | Item Code: 43Size- 150 NBScope of work includes replacement of damaged Elbows.MOC of the elbows replaced shall be confirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 44 | Item Code: 44Size- 65 NBScope of work includes replacement of damaged Elbows.MOC of the elbows replaced shall be confirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 45 | Item Code: 45Size- 50 NBScope of work includes replacement of damaged Elbows.MOC of the elbows replaced shall be confirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 46 | Item Code: 46Size- 40 NBScope of work includes replacement of damaged Elbows.MOC of the elbows replaced shall be confirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 47 | Item Code: 47Size- 32 NBScope of work includes replacement of damaged Elbows.MOC of the elbows replaced shall be confirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 48 | Item Code: 48Size- 25 NBScope of work includes replacement of damaged Elbows.MOC of the elbows replaced shall be confirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 49 | Item Code: 49Size- 20 NBScope of work includes replacement of damaged Elbows.MOC of the elbows replaced shall be confirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 50 | Item Code: 50Size- 15 NBScope of work includes replacement of damaged Elbows.MOC of the elbows replaced shall be confirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 51 | Item Code: 51Replacement of damaged 150 NB FlangesScope of work includes replacement of damaged flanges in FACT Pragatiyan barge. MOC of the flanges replaced shall be confirming to the specification of associated piping. Only skilledfitters and welders shall be assigned for the replacement of elbows.Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 52 | Item Code: 52Replacement of damaged 65 NB FlangesScope of work includes replacement of damaged flanges in FACT Pragatiyan barge. MOC of the flanges replaced shall be confirming to the specification of associated piping. Only skilledfitters and welders shall be assigned for the replacement of elbows.Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 53 | Item Code: 53Replacement of damaged 50 NB FlangesScope of work includes replacement of damaged flanges in FACT Pragatiyan barge. MOC of the flanges replaced shall beconfirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 54 | Item Code: 54Replacement of damaged 40 NB FlangesScope of work includes replacement of damaged flanges in FACT Pragatiyan barge. MOC of the flanges replaced shall be confirming to the specification of associated piping. Only skilledfitters and welders shall be assigned for the replacement of elbows.Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 55 | Item Code: 55Replacement of damaged 32 NB FlangesScope of work includes replacement of damaged flanges in FACT Pragatiyan barge. MOC of the flanges replaced shall beconfirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows.Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 56 | Item Code: 56Replacement of damaged 25 NB FlangesScope of work includes replacement of damaged flanges in FACT Pragatiyan barge. MOC of the flanges replaced shall be confirming to the specification of associated piping. Only skilledfitters and welders shall be assigned for the replacement of elbows.Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 57 | Item Code: 57Replacement of damaged 20 NB FlangesScope of work includes replacement of damaged flanges in FACT Pragatiyan barge. MOC of the flanges replaced shall beconfirming to the specification of associated piping. Only skilled fitters and welders shall be assigned for the replacement of elbows. Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 58 | Item Code: 58Replacement of damaged 15 NB FlangesScope of work includes replacement of damaged flanges in FACT Pragatiyan barge. MOC of the flanges replaced shall be confirming to the specification of associated piping. Only skilledfitters and welders shall be assigned for the replacement of elbows.Materials, tools, consumables and manpower required for the job shall be in scope of contractor |
| 59 | Item Code: 59Servicing of 150NB basket type strainersScope of work includes Cleaning of Basket Type Strainers, replacing the Bonnet-Body Gasket of the strainer. Painting of body & bonnet( one coat of primer & two coats of finish paint) of thestrainers after completion of cleaning works.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 60 | Item Code :60Servicing of 65NB angle type mud boxes.Scope of work includes Cleaning & painting( one coat of primer &two coars of finish paint) of angle type mud boxes. Replacing ofBonnet-Body Gasket of angle type mud boxes after completion ofthe cleaning works. Entire materials, tools, manpower & consumablesrequired for the job shall be in scope of contractor |
| 61 | Item Code :61Servicing of 50NB angle type mud boxesScope of work includes Cleaning & painting( one coat of primer &two coars of finish paint) of angle type mud boxes. Replacing ofBonnet-Body Gasket of angle type mud boxes after completion ofthe cleaning works. Entire materials, tools, manpower & consumablesrequired for the job shall be in scope of contractor |
| 62 | Item Code :62Servicing of 65NB strum boxesScope of work includes Cleaning & painting( one coat of primer & two coars of finish paint) of strum boxes. Replacing of Bonnet-Body Gasket of strum boxes after completion of the cleaning works. Entire materials, tools, manpower & consumables required for the job shall be in scope of contractor. |
| 63 | Item Code :63Servicing of 50NB strum boxesScope of work includes Cleaning & painting( one coat of primer & two coars of finish paint) of strum boxes. Replacing of Bonnet-Body Gasket of strum boxes after completion of the cleaning works. Entire materials, tools, manpower & consumables required for the job shall be in scope of contractor. |
| 64 | Item Code: 64Overhauling of 150 NB Sea Chest Valve (Class approved),Right Angle, MOC: CS-GMScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 65 | Item Code: 65Overhauling of 150 NB Intermediate Valve (Gate Valve), MOC- CI-SSScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower& consumables required for the job shall be in scope of contractor. |
| 66 | Item Code: 66Overhauling of 65 NB Over board valves (Class approved), MOC: CI-GMScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower & consumables required for the job shall be in scope of contractor. |
| 67 | Item Code: 67Overhauling of 65 NB, Gate Valve, MOC : CI/GM-GMScope of work includes dismantling of valves from pipe lines, cleaning,replacement of body-bonnet gaskets, replacement of valve seats ,lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower& consumables required for the job shall be in scope of contractor. |
| 68 | Item Code: 68Overhauling of 50 NB, Gate Valve, MOC : CI/GM-GMScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelineswith new gaskets for the flanges).Materials, tools, manpower & consumables required for the job shall be in scope of contractor. |
| 69 | Item Code: 69Overhauling of 40 NB, Gate Valve, MOC : CI/GM-GMScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower & consumables required for the job shall be in scope of contractor. |
| 70 | Item Code: 70Overhauling of 65 NB, SDNR Globe Valve, Straight/Right Angle, MOC: CS/CI-GMScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower& consumables required for the job shall be in scope of contractor. |
| 71 | Item Code: 71Overhauling of 50 NB, SDNR Globe Valve, Straight/Right Angle, MOC: CS/CI-GMScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower& consumables required for the job shall be in scope of contractor. |
| 72 | Item Code: 72Overhauling of 40 NB, SDNR Globe Valve, Straight/Right Angle, MOC: CS/CI-GMScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower& consumables required for the job shall be in scope of contractor. |
| 73 | Item Code: 73Overhauling of 40 NB, Quick Closing valves of fuel tanksScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower& consumables required for the job shall be in scope of contractor. |
| 74 | Item Code: 74Overhauling of 65 NB, Fire Hydrant Valves, MMD approvedScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower& consumables required for the job shall be in scope of contractor. |
| 75 | Item Code: 75Overhauling of 40 NB, Ball Valve, MOC: GS-GMScope of work includes dismantling of valves from pipe lines, cleaning, replacement of body-bonnet gaskets, replacement of valve seats , lapping disc/wedge faces, replacement of gland packing,hydrotesting of the valves , painting (one coat of primer & two coats of finish paint) & refixing of the valves to the pipelines with new gaskets for the flanges).Materials, tools, manpower& consumables required for the job shall be in scope of contractor. |
| 76 | Item Code : 76Replacement of 40 NB, Gate Valve, MOC: BrassScope of work includes removal of damaged valves from the pipelines & fixing new valves in the pipelines.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 77 | Item Code : 77Replacement of 32 NB, Gate Valve, MOC: BrassScope of work includes removal of damaged valves from the pipelines & fixing new valves in the pipelines.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 78 | Item Code : 78Replacement of 25 NB, Gate Valve, MOC: BrassScope of work includes removal of damaged valves from the pipelines & fixing new valves in the pipelines.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 79 | Item Code : 79Replacement of 20 NB, Ball Valve, MOC: BrassScope of work includes removal of damaged valves from the pipelines& fixing new valves in the pipelines.Materials, tools, manpower &consumables required for the job shall be in scope of contractor |
| 80 | Item Code : 80Replacement of 15 NB, Ball Valve, MOC: BrassScope of work includes removal of damaged valves from the pipelines& fixing new valves in the pipelines.Materials, tools, manpower &consumables required for the job shall be in scope of contractor |
| 81 | Item Code : 81Replacement of 50 NB, NR Valve, Flap Type, MOC :SSScope of work includes removal of damaged valves from the pipelines& fixing new valves in the pipelines.Materials, tools, manpower &consumables required for the job shall be in scope of contractor |
| 82 | Item Code : 82Replacement of 20 NB, NR Valve, Flap Type, MOC :SSScope of work includes removal of damaged valves from the pipelines& fixing new valves in the pipelines.Materials, tools, manpower &consumables required for the job shall be in scope of contractor |
| 83 | Item Code : 83Replacement of 15 NB, NR Valve, Flap Type, MOC :SSScope of work includes removal of damaged valves from the pipelines & fixing new valves in the pipelines.Materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 84 | Item Code 84:General Service PumpGeneral Service pump of the barge is driven by an independent diesel engine.Scope of work includes :1) Disconnecting engine side drive to the pump2) Complete dismantling of pump3) Cleaning of the parts of the pump(casing, impeller etc..)4) Replacing bearings of the pump with adequate lubrication5) Replacing oil seals, mechanical seals/gland packing, Lantern rings& Gaskets of the pump.6) Hydrotesting of the pump after assembling.7) Half overhauling of the diesel engine of the general service pump.8) Connecting assembled pump to engine side drive and carryingout the functional test to the satisfactory of FEW/Class.Size :65 NBMOC: CI-GM-SSFlow rate : 25Cum/hr @ 30mNote: Entire materials, tools , consumables and manpower required for the job are in scope of contractor |
| 85 | Item Code 85:Bilge Pump:Scope of work includes :1) Disconnecting the electrical motor which drives pump2) Complete dismantling of pump & motor3) Cleaning of the parts of the pump(casing, impeller etc..)4) Replacing bearings of the pump & motor with adequate lubrication5) Replacing oil seals, mechanical seals/gland packing, Lantern rings & Gaskets.6) Replacement of motor bearings & seals.7) Checking any damages to the insulation & windings of the motor and applying varnish on the motor windings. 8) Hydrotesting of the pump after assembling.9) Connecting assembled pump to motor and carrying out the functional test to the statisfactory of FEW/Class Size :65 NBMOC: CI-GM-SSFlow rate : 25Cum/hr @ 30mNote: Entire materials, tools, consumables and manpower required for the job are in scope of contractor. |
| 86 | Item Code 86:Hand Pump(Semirotary):Scope of work includes complete dismantling of pump, cleaning, replacement of bearing & seals, assembling & hydrotesting of the pump for checking any leakages.Size : 40 NBMOC: BrassNote: Entire materials, tools, consumables and manpower required for the job are in scope of contractor |
| 87 | Item Code 87:Servicing and replacing damaged wire mesh, cover plates and gaskeks of the of ball type vent heads:100NB- 2 nos80 NB -4 nos65 NB - 2 nosNote: Entire materials, tools, consumables and manpowr required for the job are in scope of contractor |
| 88 | Item Code 88:Servicing of sounding pipes & carrying out functional tests:80 NB - 4 NosNote: Entire materials, tools, consumables and manpower required for the job are in scope of contractor. |
| 89 | Item Code 89:Servicing of Main Engines of FACT Pragatiyan Barge:Scope of work includes:# Top Overhauling of the main engines.# Replacement of Sea Water Pumps of main engines# Replacement of Old belts, hoses & bellows coupling in main engines# Replacement of Starting Motor & Alternators of main engines# Replacement of Air filters, Diesel filters, Oil filters & coolant filters of the main engines.# Replacing engine oil & coolant of the main engines.# Cleaning of coolant reservoir & radiators(heat exchanger).# Replacing coolant manifold of the port side engine.# Replacement of Gear box to Main Engine Spider Coupling of the main engines#Replacing lube oil pressure sensor, rpm sensor and temperature sensors of the main engines.# Replacing damaged insulation & aluminium cladding on the exhaust lines of main engines.Entire works mentioned above for the main engines shall be done by OEM. Only OEM approved spares shall be used for carrying out these repair works. Entire materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 90 | Item Code 90:Servicing of Auxillary Engine/Generator of FACT Pragatiyan Barge:Scope of work includes:# Top Overhauling of the Auxiliary Engine# Full Overhauling of Sea water pump# Replacement of Old belts, hoses & bellows coupling in auxiliary engine.# Cleaning of coolant reservoir & radiators.# Replacing Engine Oil & Coolant of auxiliary engine.# Replacement of Air filters, Fuel Filters, Oil filters & coolant filters of the auxiliary engine# Cleaning & varnishing the generator side windings.# Replacing the main bearings at generator side.# Replacing the faulty panel board and display of the auxiliary engine.# Replacing lube oil pressure, temperature & rpm sensors of the auxiliary engineEntire works mentioned above for the auxiliary engine/generator shall be done by using OEM spares and skilled marine engine technician/electrician. Entire materials, tools, manpower & consumables required for the job shall be in scope of contractor |
| 91 | Item Code:91Servicing of gear boxes of main engines in FACT Pragatiyan Barge:Scope of work includes:1) Replacing bearings of gear boxes2) Replacing gear oil.3) Replacing damaged pressure/temperature guages and gaskets4) Replacing pressue/temperature sensors5) Cleaning and overhauling of oil coolersNote: Entire materials, tools, consumables & manpower required for the job shall be in scope of contractor. |
| 92 | Item Code 92:Replacing damaged sprinkler pipes along with sprinklers.Note: Entire materials, tools, manpower and consumable required for the job shall be in scope of contractor |
| 93 | Item Code 93:Replacing damaged handrail pipesNote: Entire materials, tools, manpower and consumables required for the job shall be in scope of contractor |
| 94 | Item Code 94:Replacing damaged handrail stanchionNote: Entire materials, tools, manpower and consumables required for the job shall be in scope of contractor |
| 95 | Item Code 95:Replacing damaged Aluminium roofing sheets along with the structural over the cargo hold. Note : Entire materials, tools, manpower and consumables required for the job shall be in scope of ocntractor |
| 96 | Item Code 96:Replacing damaged cable traysNote: Entire materials, tools, manpower and consumables required for the job shall be in scope of contractor. |
| 97 | Item Code 97:Cleaning of Scupper & Discharge Lines of the bargeNote: Entire materials, tools, manpower and consumables required for the job shall be in scope of contractor |
| 98 | Item Code 98: Replacing the damaged sewage tank in FACT Pragatiyan BargeNote: Entire materials, tools, manpower and consumables required for the job shall be in scope of contractor |
| 99 | Item Code 99:Removishing, polishing and refixing the wind shield glasses provided in wheel houseNote: Entire materials, tools, manpower and consumables required for the job shall be in scope of contractor |
| 100 | Item Code 100:Replacement of damaged vinyl flooring in wheel house & accommadation deck of the bargeNote: Entire materials, tools, manpower and consumables required for the job shall be in scope of contractor |
| 101 | Item Code 101:Replacement of damaged false ceiling in wheel house, accommodatin deck & galley by using laminated marine plywoodNote: Entire materials, tools, manpower and consumables required for the job shall be in scope of contractor |
| 102 | Item Code 102:Replacement of damaged wall panelling in wheel house, galley & accommodation deck by using laminated marine plywoodNote Entire materials, tools, manpower and consumables required for the job shall be in scope of contractor |
| 103 | Item Code 103:Repair works in Galley:Scope of work includes:1) Dismantling the damaged kitchen slab in galley2) Providing necessary steel structural & plate renewal works for construction of new kitchen slab.3) Providing good quality granite of price range Rs.150/sqft over the slab.4) Providing new SS kitchen sink (18inch, SS304) and water tap for the galley.5) All the plumbing line to the galley to be inspected and damaged portions are to be renewedNote: All materials, manpower, tools & consumables required for the job shall be in scope of contractor. |
| 104 | Item Code 104:Servicing the AC fixed in Wheel HouseScope of work includes:General servicing and clening of AC fixed in wheel house by an authorized service agency. Old filters and refrigerant of the AC to be replaced. Note: All materials, manpower, tools & consumables required for the job shall be in scope of contractor. |
| 105 | Item Code 105:Electrical repair works in wheel house, engine room & accommodation decks:Scope of work includes:a) Replacing damged deck lights / tube lights in wheel house, engine room and acoommodation decksb) Replacing damged/faulty switches and providing new name plate for the new switches in the lighting DB located in wheel house.c) Providing new wipers with motors for the windshield Note : All materials, manpowers, tools & consumables required for the job shall be in scope of contractor. |
| 106 | Item Code 106:Executing miscellanenous works which are not mentioned in the schedule of work Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail