| 1 | M&L for periodic inspection/ Servicing of 2 Ton capacity 02 Nos EOT Crane of any make installed at different building/location in Airforce Station Sarsawa, making the crane in fully serviceable condition complete all as specified & directed as under:-(A) LONG TRAVERSE MOTION-(i) Checking gear box oil level , checking and rectification of leakage if any and filling with new gear box oil upto required level.(ii) Checking function of all LT Brakes of any capacity and making adjustment for proper working including replacement of worn out parts if any.(iii) Checking of LT Wheels for any abnormal sound and checking mounting and fixing arrangement.(iv) Checking of grase in geared coupling and tightening of nut and bolts etc.(v) Checking of LT Motion cut-off at the extreme ends of bay length with L.T limit switches(vi) Checking drive shaft and coupling including tightening of nut and bolts.(vii) Checking of terminal connections of all LT motors and tightening properly including replacing burnt / overheated cable ends if any. |
| 2 | (B) CROSS TRAVERSE MOTION(i) Checking gear box oil level , checking and rectification of leakage if any and filling with new gear box oil upto required level.(ii) Checking function of CT Brakes of any capacity and making adjustment for proper working including replacement of worn out parts if any.(iii) Checking of CT Wheels for any abnormal sound and checking mounting and fixing arrangement.(iv) Checking of grase in geared coupling and tightening of nut and bolts etc.(v) Checking of CT Motion cut-off at the extreme ends of bay length with C.T limit switches(vi) Checking drive shaft and coupling including tightening of nut and bolts.(vii) Checking of terminal connections of CT motors and tightening properly including replacing burnt overheated cable ends if any. |
| 3 | (C) HOIST MOTION(i) Checking gear box oil level , checking and rectification of leakage if any and filling with new gear box oil upto required level.(ii) Checking function of all Hoist Brakes of any capacity and making adjustment for proper working including replacement of worn out parts if any.(iii) Checking of Equalizing pully / rope drum for any abnormal sound and checking mounting and fixing arrangement.(iv) Checking of grase in geared coupling and tightening of nut and bolts etc.(v) Checking of Hoist Motion cut-off at the extreme ends of up and down with rotary geared limit switches(vi) Checking drive shaft and coupling including tightening of nut and bolts.(vii) Checking of terminal connections of Hoist motors and tightening properly including replacing burnt / overheated cable ends if any. |
| 4 | (D) ELECTRICALS(i) Checking and tightening all electric connection(ii) Checking the contactors/ relays etc for overheating or flashing.(iii) Cleaning off all connection and control cables.(iv) Properly bunching the loose control cable.(v) Checking functioning of cable carriers. |
| 5 | (E) GROUND MOTION CONTROL PANEL(i) Opening the push button control unit, checking all connection, replacing flashed/ over heated connections, general cleaning and checking all the functions, of the LT/CT/ Hoist motion push buttons and lights switch including reassembling the unit completeNotes:- 1. Gear box oil shall be measured and paid separately.2.Contractor's rep will visit once in 03 months, check and inspect every crane and on occurance of any fault during contract period take servicibility certificate duly signed by the users and MES Rep. 3. The inspection and serviceing work shall be carried out by contractor through any vender having minimum 05 years experiance of similar work in any state/central govt department approved by GE. |
| 6 | Supply only Gear box oil EP -230 for EOT crane complete all as specified & directed. Note:- The record for replacement of Oil shall be maintain by Engineer -in- charge duly signed by all concern. |
| 7 | Supply only Brake oil for EOT crane complete all as specified & directed. Note :- The record for replacement of oil shall be maintain by Engineer -in- charge duly signed by all concern. |
| 8 | M&L in replacement of Flexible Cable of 01sqmm, 14 core for Pendent Push Button Station from Main Panel to Push Button Station on Newly fixed ‘C’-Track system suitable for 02 ton EOT Crane complete all as specified & directed. |
| 9 | M&L in replacement of Unserviceable L.T and C.T Disc Brake with New disc brake of suitable size complete all as specified & directed. Make : Megtech/ Cranex/ Pethe |
| 10 | M&L in replacement of L.T & C.T box type limit switch with lever complete for 2 TON EOT Crane complete all as specified & directed. Make : Megtech/ Cranex/ Pethe |
| 11 | S&F in replacement of multi standard copper conductor flexible (industrial cable) 1100 volts grade ,PVC insulted and sheathed cable of size 6sqmm 4 core complete all as specified & directed. |
| 12 | S&F in replacement multi standard copper conductor flexible (industrial cable) 1100 volts grade, PVC insulted and sheathed cable of size 2.5sqmm 4 core complete all as specified & directed. |
| 13 | S&F in replacement multi standard copper conductor flexible (industrial cable) 1100 volts grade, PVC insulted and sheathed cable of size 1.5sqmm 3 core complete all as specified & directed. |
| 14 | M&L for replacement of 9mm steel wire rope of 6x36 FMC Construction duly tested for 2 ton EOT Crane complete all as specified & directed. Make : Usha Martin/Mahadev or as approved by GE on recommandation of OEM.Note: Necessary Test Certificate for steel wire rope shall be submitted by the contractor. |
| 15 | S&F in replacement of MCCB TPN 63 Amp 16KA rated fixed in CRCA sheet steel enclosure duly powder coated to be mounted on the wall with the help of fastners complete all as specified & directed. |
| 16 | M&L for radiography testing of crane main hook block by approved firm from BARC Mumbai complete all as specified & directed.Note: The Original film and testing report of radiography shall be submitted by the contractor to GE. |
| 17 | M&L for Load Testing of 2 TON capacity EOT Crane by applying 25% extra dead weight load, complete all as specified & directed.Note:- Necessary T&P and Dead Weight load should be arranged by contractor at site at their own cost. |
| 18 | M&L for fixing of 32 Amp rated TPN current collector for box type DSL System complete all as specified & directed. |
| 19 | M&L for fabrication of MS bracket made out of angle iron / channel of suitable size for current collector / cables complete all as specified & directed. |
| 20 | S&F, testing & commissioning of AC drive, upto 5.5kW V/F control operated on 3 phase 415 Volt AC for hoist control CT/LT motor of EOT crane complete all as specified & directed. |
| 21 | Supply, fixing and making all connection Rotary limit switch capacity 40 Amps 415 volts all as per existing for LT/CT/Hoist motion of 2 ton capacity crane, including taking down old unserviceable rotary limit switch complete all as specified & directed. |
| 22 | S&F in repairs, push button with element in push button box as per required colour code complete all as specified and as directed . |
| 23 | S&F in repairs, power contactor 20 Amps with 2 NO + 2NC , complete all as specified & directed. |
| 24 | M&L for re-winding of electric motor upto 5 HP, 3 Phase 415 volt of any make after disconnecting motor electrically and mechanically system from the elevated height and transporting to workshop for repairs, taking out burnt winding wire, cleaning the rotor and stator properly, rewinding the motor with super enameled copper winding wire as per existing gauge, varnishing /drying etc complete, replacing the ball bearings as per existing size, reassembling the motor, shifting and installing at original position , making electrical and mechanical connections and testing for proper working complete all as specified & directed. |
| 25 | S&F in repairs motor of capacity 2 HP/1.5 KW three phase RPM 1450 suitable for electric operated motorised door complete all as specified & directed Make : ABB or any make from list of makes, as approved by GE. |
| 26 | S&F in repair of Gear box matching with motor given at ser item no 26 above and matching with existing make complete all as specified & directed. |
| 27 | S&F in repairs Hanger door Iron roller wheel of size upto 300mm x 75mm as per exisiting size having groove suitable for movement on iron rail including all T&P required for replacement at site complete all as specified & directed. |
| 28 | S&F in repairs of Hanger door Iron roller free wheel of size upto 300mm x 75mm as per exisiting size having groove suitable for movement on iron rail including all T&P required for replacement at site complete all as specified & directed. |
| 29 | S&F in repairs of Hanger door motor chain having width 1 inch and pitch 5/8 inch heavy duty complete all as specified & directed. |
| 30 | S&F in repairs, power contactor 18 Amps AC3 12A/5.5 KWCE15 C series complete all as specified & directed. |
| 31 | S&F in repairs, MCB Single pole of capacity 0-6 Amp rated at 240-410 V, 10 KA complete all as specified & directed. |
| 32 | S& F in Repair Start/Stop Push Button of Control panel complete all as specified & directed. |
| 33 | S&F in repair Indicating LED lamp of control panel complete all as specified & directed. |
| 34 | S&F in replacement of PVC insulated flexible copper conductor 3 core 1100 volts grade of size 4 sqmm complete all as specified & directed. |
| 35 | M&L for periodical inspection / servicing by removal of dirt/dust & carbon particles form electric drives, greasing / oiling of all moving parts including checking & adjustment of boom alignment and minor repair of boom barrier complete all as specified & directed. |
| 36 | S&F in replacement of MCB SP 5- 32 Amp 240 Volts 10KA rating, ISI marked, complete all as specified & directed. |
| 37 | Comprehensive maintence, testing/Servicing and repair including preventive and periodical maint with renewals and replacement of defective parts of all existing fire protection and fire fighting system complete consisting of main fire control panels of 1X 12.5HP Jockey pumpset, 2X 75HP electric driven pumpset, and 1X 90HP Engine driven pump, 1X 12.5HP Terrace pumps , 2X15 HP CFT pumps by necessary decarbonising ,cleaning, tightening & 100 % servicing of of all loose contact, sub panels, pressure switch, presure vessels, fire hydrents, hose reels, canvas hose pipes, gunmetal valves etc with control panel, starters and to keep Fire fighting system in auto run mode on variation in pressure to make 100% serviceability of the complete installed at ATC building of Saraswa AF station. Notes: (i) The work shall be executed through any vender having minimum 05 years experiance of similar work in any state/central govt department. (ii) The contractor rep will visit site once in every month and on occurence of any fault during contract period take serviceability certificate from Users and MES rep. |
| 38 | Comprehensive maintence, testing/Servicing and repair including preventive and periodical maint with renewals and replacement of defective parts of all existing fire alarm system complete & 100 % servicing of fire alarm panel, smoke/heat detector/response indicator, Hooters, Manual call points complete including checking, cleaning of fire detector by removing dust or dirt, cleaning of heavy greasy deposit if any, checking the connection of battaries, specific gravity of electrolyte, the alarm function control panel and indicating eqpts be checked by the operation of trigger device in each zone as described the system installed at following Bldgs of Sarsawa AF Station. Notes: (i) The work shall be executed through any vender having minimum 05 years experiance of similar work in any state/central govt department. (ii) The contractor rep will visit site once in every month and on occurence of any fault during contract period take serviceability certificate from Users and MES rep. |
| 39 | ATC Bldg (G+4), addressable type fire alarm system |
| 40 | SRE Bldg (G+6), conventional type fire alarm system |
| 41 | OPS Bldg (01 floor), conventional type fire alarm system Please Enable Macros to View BoQ information |
| 42 | OPS Bldg (01 floor), conventional type fire alarm system Please Enable Macros to View BoQ information |