| 1 | Jungle clearance on running canals and branches, and drains with discharge more than 9 Cum/s. (iii) Heavy type |
| 2 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (For X-Bundh) |
| 3 | Excavation in soil (any type) using hydraulic excavator CK 90 excavation with hydaulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes,in accordance with requirements of lines grades and X-sections including all lifts and combined leads upto 30 mtr.item no 6.19 |
| 4 | Dismantling cement concrete 1:3:6 coping on left and right side bank of Rajashthan Feeder including loading & unloading, carriage and disposal of dismantled material with all leads & lifts. |
| 5 | Dismantling existing tile lining on side slopes and bed of Rajashthan Feeder including loading, unloading, carriage and disposal of dismantled materials with all leads and lifts. |
| 6 | Silt clearance and debris of channels undressed and disposal of the same complete in all respect, as per instructions of the Engineer incharge including all leads & lifts, loading & unloading at proper place to be arranged by the agency/contractor himself. |
| 7 | Rehandling of earth work with average lead 15 mtr complete in all respect, as per instruction of the engineer incharge. The work maye be executed manually or by machinery. |
| 8 | Extra for dressing of earth work complete in all respect, as per drawings, design, specifications & the instructions of the Engineer in charge. |
| 9 | Extra for dressing of Dowel complete in all respect, as per drawings, design, specifications & the instructions of the Engineer in charge. |
| 10 | Extra for laying earth as per specifications for compaction in 200 mm layers & compacted to about 150 mm, watering, rolling and compaction to achieve maximum DBD of 98% at optimum moisture content including dressing complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. |
| 11 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing complete in all respect, as per instruction of Engineer in charge i) Depth 0 to 1.50 Meter |
| 12 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing complete in all respect, as per instruction of Engineer in charge ii) Depth exceeding 1.50 meters But up to 3.00 meters. |
| 13 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing complete in all respect, as per instruction of Engineer in charge iii) Depth exceeding 3.00 meters. But up to 4.50 meters. |
| 14 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing complete in all respect, as per instruction of Engineer in charge iv) Depth exceeding 4.50 meters But up to 6.00 meters. |
| 15 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing complete in all respect, as per instruction of Engineer in charge v) Depth exceeding 6.00 meters But up to 7.50 meters. |
| 16 | Dressing and preparation of sub grade (in earthwork) for lining complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. i) Bed |
| 17 | Dressing and preparation of sub grade (in earthwork) for lining complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. ii) Side Slopes |
| 18 | Supply and laying first layer of graded filter with coarse sand, F.M. 1.5 or above against sub grade or in damaged portion/patch including loading, unloading and carriage of coarse sand from approved quarry, grading of material and compaction in bed, side slopes etc. complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge (II) Side Slopes |
| 19 | Supply and laying second layer of filter material with graded gravel 5 to 20 mm including loading, unloading and carriage of material from approved quarry, grading of material and compaction in bed, side slopes etc. complete in all respect as per drawings, design, specifications & the instructions of the Engineer incharge. Side Slopes |
| 20 | Supply and laying of HDPE textured for Side slopes 750 Micron thickness as approved by Engineer incharge, pasting on both faces, including laying in position, anchorage, carriage to site, jointing/welding, spraying of cement slurry etc. complete in all respect, as per drawings, design, specifications and instructions of the Engineer incharge . |
| 21 | Supply and laying of HDPE Geo membrane for Bed 750 Micron thickness as approved by Engineer incharge, pasting on both faces, including laying in position, anchorage, carriage to site, jointing/welding, spraying of cement slurry etc. complete in all respect, as per drawings, design, specifications and instructions of the Engineer incharge . |
| 22 | Filling expansion joints with special impervious hot pour 12.5mm wide |
| 23 | Supply of PVC water stop 150 x 10 mm for use in construction joints, complete in all respects as per drawings, design, specifications and the instructions of the Engineer in charge. |
| 24 | Supply and fixing in bed PVC Pressure Relief valve in plate & socket type design having zero backwater leakages with housing pipe of nominal outer dia 160 mm (working presure 0.4 MPa), having length of 430 mm and strainer pipe of nomial dia 110mm (working presure 0.6 MPa), complete in all respect as per design, drawing & specifications & the instructions of the Engineer incharge. |
| 25 | Providing and laying in position design mix concrete M-15 grade using minimum cement content as specified in IS 456: 2000, manufactured in fully automatic batching plant and transported to site of work in transit mixer having continuous agitated mixer, manufactured as per mix design of specified grade and laying the same with mechanical concrete paver or by other means(wherever laying of concrete with paver is not possible) for cement concrete lining 150 mm thick including cost of admixtures in recommended proportions as per IS-9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability including cost of cutting grooves and inserting PVC water stop seals (excluding cost of PVC seals), supply and application of primer for joints, supply, carriage, all leads and lifts, loading and unloading of all materials, curing, complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. i) In bed & curved portion 0 to 2.00 mtr height |
| 26 | Providing and laying in position design mix concrete M-15 grade using minimum cement content as specified in IS 456: 2000, manufactured in fully automatic batching plant and transported to site of work in transit mixer having continuous agitated mixer, manufactured as per mix design of specified grade and laying the same with mechanical concrete paver or by other means(wherever laying of concrete with paver is not possible) for cement concrete lining 150 mm thick including cost of admixtures in recommended proportions as per IS-9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability including cost of cutting grooves and inserting PVC water stop seals (excluding cost of PVC seals), supply and application of primer for joints, supply, carriage, all leads and lifts, loading and unloading of all materials, curing, complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. ii) In side slopes up to 3.50 Mtr Height. |
| 27 | Providing and laying in position design mix concrete M-15 grade using minimum cement content as specified in IS 456: 2000, manufactured in fully automatic batching plant and transported to site of work in transit mixer having continuous agitated mixer, manufactured as per mix design of specified grade and laying the same with mechanical concrete paver or by other means(wherever laying of concrete with paver is not possible) for cement concrete lining 150 mm thick including cost of admixtures in recommended proportions as per IS-9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability including cost of cutting grooves and inserting PVC water stop seals (excluding cost of PVC seals), supply and application of primer for joints, supply, carriage, all leads and lifts, loading and unloading of all materials, curing, complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. iii) In side slopes from 3.50 Mtr. to 5.50 Mtr Height. |
| 28 | Providing and laying in position design mix concrete M-15 grade using minimum cement content as specified in IS 456: 2000, manufactured in fully automatic batching plant and transported to site of work in transit mixer having continuous agitated mixer, manufactured as per mix design of specified grade and laying the same with mechanical concrete paver or by other means(wherever laying of concrete with paver is not possible) for cement concrete lining 150 mm thick including cost of admixtures in recommended proportions as per IS-9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability including cost of cutting grooves and inserting PVC water stop seals (excluding cost of PVC seals), supply and application of primer for joints, supply, carriage, all leads and lifts, loading and unloading of all materials, curing, complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge.iv) In side slopes from 5.50 Mtr. to 7.50 Mtr Height. |
| 29 | Providing and laying in position design mix concrete M-15 grade using minimum cement content as specified in IS 456: 2000, manufactured in fully automatic batching plant and transported to site of work in transit mixer having continuous agitated mixer, manufactured as per mix design of specified grade and laying the same with mechanical concrete paver or by other means(wherever laying of concrete with paver is not possible) for cement concrete lining 150 mm thick including cost of admixtures in recommended proportions as per IS-9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability including cost of cutting grooves and inserting PVC water stop seals ( excluding cost of PVC seals) supply and application of primer for joints, supply, carriage, all leads and lifts, loading and unloading of all materials, curing, complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. Coping. |
| 30 | Manufacturing and laying on bed, sides & curved portion, precast cement concrete sleepers of M-15 concrete, 225 mm wide & 110 mm thick and upto 600 mm length including supply, carriage, all leads and lifts, loading and unloading of all materials, curing, complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge.for making sleepers ( taken progress of one day =100 m) |
| 31 | Providing safety ladders on side slopes of lining in cement concrete M-15 including fixing iron rungs 25 mm diameter of steel having anti-corrosive properties supported with 10 mm dia longitudinal bars, dismantling of existing lining, excavation of earth and disposal of earth and dismantled material with all leads & lifts at disposal site to be arranged by agency himself, including supply and carriage of cement at site of work, supply & carriage of steel, bending, binding and placing in position , supply & carriage of coarse sand and shingle from approved quarry & curing complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. |
| 32 | Making dewatering arrangements inclusive of running, operation and maintenance of equipment to provide dry condition at working place for lining, longitudinal /transverse drain etc & provision of digging & filling of drains for disposal of water as per the instructions of the Engineer incharge. The rate shall be inclusive of filter material, if required, to be provided to prevent fine particles in the adjacent ground to be carried away by flowing water and to prevent clogging of the system. |
| 33 | Providing Tractor 24 H.P. for running 4” x 4” pumping set for open dewatering |
| 34 | Providing and fixing distance marks complete in all respect, as per drawings, design, specifications & the instructions of the Engineer in charge. |
| 35 | Supply and fixing in side slopes PVC Pressure Relief valve in plate & socket type design having zero backwater leakages with housing pipe of nominal outer dia 160 mm (working presure 0.4 MPa), having length of 750 mm and strainer pipe of nominal outer dia 110mm (working presure 0.6 MPa), complete in all respect as per design, drawing & specifications & the instructions of the Engineer incharge.The rate shall be inclusive of dismantling existing lining(if required), excavation of PRV side pocket and disposal of dismantled material/earth with all leads and lifts, supply, carriage, loading & unloading, laying & compaction etc. of filter material consisting of sand and gravels complete in all respect as per drawings, design, specifications & the instructions of the Engineer incharge. (@ 10 m ( 33’ ) apart on both sides of the channel in Pockets ) |
| 36 | Making drainage arrangements behind lining by excavating longitudinal side drains of trapezoidal section in the bed of channel and disposal of earth with all leads & lifts loading & unloading, dressing the bottom and sides of the drain, and the items given below complete in all respects as per drawings, design, specifications & the instructions of the Engineer inchargei) Providing and laying of filter material for drains consisting of coarse sand of FM 1.50 or above, gravels of nominal size 5-20 mm and 20-40 mm including carriage, loading & unloading, grading, laying and compaction. ii) Providing and laying perforated PVC pipe of 150 mm internal dia (working pressure 6 Kg /cm2) into drains for all depths with correct aligment, gradient, levels, cutting & jointing etc including fixing in position PVC tees,cross, cap and other required fiitings for PVC pipes including all materials, carriage,loading, unloading and all leads & lifts etc. |
| 37 | Making Drainage arrangements behind lining by excavating transverse drains of trapezoidal section in the bed of channel and disposal of earth with all leads & lifts loading &unloading dressing the bottom and sides of the drain and the items given below complete in all respects as per drawings design specification & the instructions of the Engineer incharge.i) Providing and laying of filter material for drains consisting of 200 gsm. Geo textile and gravels of nominal size 20-40 M.M including placing, anchorage of Geo-textile, carriage, loading and unloading, grading and compaction.ii) Providing and laying perforated PVC pipe of nominal outer dia 160 mm (working pressure 0.6 MPa) in drains for all depths with correct alignment, gradient,levels, cutting and jointing etc. including fixing in position PVC tees.cross cap and other required fitting for PVC pipe including all materials, carriage loading , unloading and all lead & lifts. |
| 38 | Constructing rain water drain on both sides of common bank with mixed concrete M-15 using cement content not less than minimum cement as specified in IS 456:2000, manufactured in fully automatic batching plant & transported to site of work in transit mixer having continuous agitated mixer, manufactured as per mix design of specified grade i/c cost of admixtures in recommended proportions as per IS-9103 to accelerate/ retard setting of concrete, improve workability without impairing strength & durability i/c supply, carriage, all leads & lifts, loading & unloading, curing, dismantling of existing drains wherever required, excavation of earth & disposal of earth & dismantled material with all leads & lifts at disposal site to be arranged by agency himself complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge.. |
| 39 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (For filling) |
| 40 | Rubbing & Cleaning the surface of existing lining in sides slopes by means of wire brushes, water and air applied under pressure through nozzle to get rid of dirt, sand deposited on it. Complete in all respect as per specifications. |
| 41 | Cement pointing 1:2 deep variety |
| 42 | First class burnt brick work laid in cement sand mortar 1:3 in first storey upto 4metres above plinth level. Please Enable Macros to View BoQ information |