| 1 | PART A - CIVIL WORK |
| 2 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. By Mechanical Means. |
| 3 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader/ Paver on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- By Mix in Place Method and Grading - III Material |
| 5 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader / Paver on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- By Mix in Place Method and Grading - II Material |
| 6 | Construction of dry lean cement concrete Subbase over a prepared subgrade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ CUM, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineerincharge , compacting with vibratory roller, finishing, curing and including preparation of subgrade surface if required etc. complete. |
| 7 | Providing and laying in-situ M30 Grade unreinforced plain cement concrete pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS 383, using fine and coarse aggregates combined gradation as per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing plant/ non tilting mixer and Weigh batcher as per approved mix design, admixtures, transporting to site, spreading, laying with approved make paver,compacted and finished in a continuous operation, finishing to lines and grades as directed by Engineer-in-charge and curing by curing compound /by providing cement vata in cement Mortar 1:8 @0.6m X 0.6m centre to centre, admeasuring 80 mm at bottom and 40 mm at top with depth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-in-charge. |
| 8 | Providing and laying in trenches 15 mm dia. medium grade having embossed as ISI Mark galvanised iron pipes of 1.25 kg/meter necessary fitting remaking good the demolished portion with filling trenches and with primer of anti-corrosive oil paint, 2 coats Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. |
| 9 | Providing and laying in trenches 50 mm dia. medium grade having embossed as ISI Mark galvanised iron pipes ?of 5.17 Kilogram/meter necessary fitting remaking good the demolished portion with filling trenches and with primer of anti-corrosive oil paint, 2 coats Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. |
| 10 | Providing and laying in trenches 80 mm dia. medium grade having embossed as ISI Mark galvanised iron pipes of 8.57 kg/meter necessary fitting remaking good the demolished portion with filling trenches and with primer of anti-corrosive oil paint, 2 coats Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. |
| 11 | Providing and laying in trenches 100 mm dia. medium grade having embossed as ISI Mark galvanised iron pipes ?of 12.43 kg/meter necessary fitting remaking good the demolished portion with filling trenches and with primer of anti-corrosive oil paint , 2 coats Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. |
| 12 | Providing and applying Cold plastic paint two component rolled on surfacing material solvent free,high build two pack seamless,tough,skid resistant,material with has property of attaining 2.00mm thickness in single coat application white(or as required colour )based on glass and colour retaining acralic cross linking resin system for coloured road surfacing including surface cleaning and cost of all material etc. complete. (All inclusive on bitumen or concrete surface) work shall carried out as per IRC 35-2015 clause 2.2) |
| 13 | Providing and laying 125 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete. |
| 14 | Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm. .in concrete slab using concrete cutting machine with diamond studded saw within 48 hours of casting of bay / slab etc. complete including subsequent widening of the groove 8 to 10 mm. wide at top having depth of 15 mm. as directed by Engineer incharge. |
| 15 | Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed drawing including fixing Polyethylene foam backer rod of required diameter (appraox. 25% larger than the initial 3 mm.to 4 mm. joint) overlaid with bond breaking tape as per detailed drawing. Item includes cleaning the joints with water jet / air compressor & allowing joint to become thoroughly dry before sealent is applied and applying primer. (A) Contraction & longitudinal joints (15 mm. deep x 8 mm. wide) |
| 16 | Providing & fixing high density polythene pipe of approved quality to fit around the dowel bars of 32 mm dia at the end of expansion joints,fully greased inside, cotton waste the pipe around the dowel bars & the pipe duly capped at the end as rected. (H.D.P. pipe shall be 30cm in length) As shown in the drawing |
| 17 | Providing and fixing in position TMT FE 500, 32 mm dia dowel bars precoated with anticorrosive epoxy paint of required Dia. 60 cms. Long and at 30.00 cm. C/C and wherever directed including handling, straightening, necessary cutting supported by TMT FE 500, chairs with proper alignment by using properly designed assembly of Bulkheads lubricating half length with bituminous paint as directed etc. complete. |
| 18 | Providing and filling 20 mm thick compressible fibre board in expansion joint complete as per drawings and technical specifications etc. complete. |
| 19 | Part B |
| 20 | TESTING CHARGES+ROYALTY |
| 21 | ADD 12% G.S.T. |
| 22 | ADD (1 % Insurance) Please Enable Macros to View BoQ information |