| 1 | Construction of embankment with approved material obtained fromborrow pit with all lifts and leads, transporting to site, spreading,grading to required slope and compacting by vibratory roller 8-10tonne to meet requirement of table 300-2 including cost ofcompensation for earth taken from private land complete as perMoRT&H specification clause 305. (Lead taken upto 5 km) |
| 2 | Providing, laying, spreading and compacting of granular sub-base byproviding close graded Material, mixing in a mechanical mix plant atOMC, carriage of mixed Material to work site, spreading in uniformlayers with motor grader on prepared surface and compacting withvibratory power roller to achieve the desired density, complete asper MoRT&H specification clause - 401 including all material, labour,machinery, lighting, guarding and maintenance of diversion.Grading - III Material |
| 3 | Providing and laying lean cement concrete 1:4:8 in Sub- base over aprepared sub-grade with coarse and fine aggregate conforming toIS: 383, the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio not to exceed 15:1, aggregate gradationafter blending to be as per table 600-1, cement content not to beless than 150 kg/ cum, optimum moisture content to be determinedduring trial length construction, concrete strength not to be less than10 Mpa at 7 days, mixed in a batching plant, transported to site, laidwith a paver with electronic sensor, compacting with 8-10 tonnesvibratory roller, finishing and curing complete as per clause 601, 112of MoRT&H specification including all material, labour, machinery,lighting, guarding and maintenance of diversion. |
| 4 | Providing and laying un-reinforced, plain cement concrete mix withConcrete Mixer & vibrator pavement over a prepared sub base with43 grade cement , coarse and fine aggregate conforming to IS: 383,maximum size of coarse aggregate not exceeding 25 mm, mixed asper approved mix design, laid, spread, compacted and finished in acontinuous operation including provision of contraction, expansion,construction and longitudinal joints etc including all material, labour,machinery, lighting, guarding and maintenance of diversion.PCC M-20 |
| 5 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. Please Enable Macros to View BoQ information |