|
| 1 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. |
| 2 | 25 mm dia GI pipes new pipe |
| 3 | 20 mm dia GI pipes |
| 4 | Removing charges of pipes (Naked Pipes) 15-40 mm nominal bore |
| 5 | 25 mm nominal bore |
| 6 | 20 mm nominal bore |
| 7 | Providing & fixing of MS Flanges 10 mm thick to GI Pipe including cost of nuts, bolts, washers etc. complete |
| 8 | 80 mm dia |
| 9 | 65 mm dia |
| 10 | Providing 1 .proper flooring = 3000 2 (Korea Blankets = 3 No's. @ 2000per non= 6000 3. Bed Covers 3 no @400 =1200 4 Matting and thermal for tent size 12x12 feet 5000 , 5, Philips Blaze multi Functional LED 400 Lumins Search Lights 15 Watt (Large Size)3 nos @ 2000 per no =6000 6 .cooking gas 2 no @ 2500= 5000 7 .Warm Track Suits 3sets @ 3000 =9000 8.safty helmets 3 nos @ 500 =1500 including all carriages |
| 11 | Supply of essential commodities like ration tea milk suger (Whatever is required during yatra) etc complete job .( The cotractor has to provide hygenic as well as quality food @ breakfast, lunch, supper,and dinner or Rs 495 / head / day for the employees engaged for Yatra purpose, whatever is directed by engineer in charge).( 3 persons for 75 Days) |
| 12 | Carriage of pipes from divisional store upto Chandanwari including loading / unloading for an avarege lead of 65 km |
| 13 | Carriage of pipes / Pipe Specials from Chandanwari Site to Sheeshnag including loading / unloading upto actual site of work by manual labours. From Sheeshnag store to actual site of work = 2 labs for 8 days= 16 labs Total Labs= 16 Labs |
| 14 | Internal fitting of toilets / baths and dismantling of same after yatra is over ( by way of PVC pipes) (PVC pipes / pipe spls / Brass Taps to be provided by Contractor). |
| 15 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete |
| 16 | 25 to 40 mm nominal bore |
| 17 | 50 to 80 mm nominal bore |
| 18 | Re-threading of damaged pipe ends including carriage from site to workshop and back. |
| 19 | 25 mm dia |
| 20 | 20 mm dia |
| 21 | Providing / Fixing / Replacement of old damaged G.I. Gate valves by way of new Gate valves of reputed make including cost of nuts, bolts, rubber insulations of ISI marked standard make incl. all carriages upto site of works, complete.(The unserviceable material shall be returned to Div. Store under proper R.I) |
| 22 | 80 mm dia Gate valve |
| 23 | 25 mm dia Gate valve |
| 24 | 20 mm dia Gate valve |
| 25 | 15 mm dia Gate valve |
| 26 | Providing and fixing of pipe specials of approved make manufacture including cutting and threading the pipe and making long screws etc incl. all sorts of carriages involved complete. |
| 27 | 25 mm dia G.I. Union |
| 28 | 20 mm dia G.I. Union |
| 29 | 15 mm dia G.I. Union |
| 30 | 65 mm dia G.I. Elbow |
| 31 | 50 mm dia G.I. Elbow |
| 32 | 40 mm dia G.I. Elbow |
| 33 | 25 mm dia G.I. Elbow |
| 34 | 20 mm dia G.I. Elbow |
| 35 | 15 mm dia G.I. Elbow |
| 36 | 65 mm dia G.I. Nipple 6\\" |
| 37 | 50 mm dia G.I. Nipple 6\\" |
| 38 | 40 mm dia G.I. Nipple 6\\" |
| 39 | 25 mm dia G.I. Nipple 6\\" |
| 40 | 20 mm dia G.I. Nipple 6\\" |
| 41 | 15 mm dia G.I. Nipple 6\\" |
| 42 | 65 mm dia G.I. equal Tee |
| 43 | 50 mm dia G.I. equal tee |
| 44 | 40 mm dia G.I. equal tee |
| 45 | 15 mm dia G.I. equal tee |
| 46 | 20x20x15 mm dia G.I. Tee |
| 47 | 25x25x20 mm dia G.I. Tee |
| 48 | 40x40x25 mm dia G.I. Tee |
| 49 | 50x50x40 mm dia G.I. Tee |
| 50 | 80x80x65 mm dia G.I. Tee |
| 51 | 20x15 mm dia Socket/ Reducer |
| 52 | 25x20 mm dia Socket/ Reducer |
| 53 | 40x25 mm dia Socket/ Reducer |
| 54 | 50x40 mm dia Socket/ Reducer |
| 55 | 20x15 mm dia Elbow/ Reducer |
| 56 | 25x20 mm dia Elbow/ Reducer |
| 57 | Engagment of ponies / Laboures for the field functionary deployed for the supervision / inspection of the ongoing construction works / carrying pipe material functioning water supply system during yatra.staff deployed for inspection of works before during and after yatra 2026 ( 2 ponies for 2 employes and 2 pack ponies to & Fro= 6 ponies + 1 holiday during Yatra for each employee to & fro= 2 Ponnies) Please Enable Macros to View BoQ information |