| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Earthwork in excavation by manual means in trenches for foundations,drains,pipes cables etc (not exceeding 1.5m in width) and for shafts,wells cesspits and the like not exceeding 10 sqm on plan,including dressing of sides and ramming of bottoms lift upto 1.5m,includding getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil |
| 3 | Removal of excavated mulba dismantled or unservicable material from the site of work by mechanical transport or animal transport or otherwise including loading/unloading (complete job) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying in position specified grade of RCC including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes channels, plates etc. including welding ,grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete ,including fixing the railing with necessary accessories and stainless steel dash fasteners, stainless steel bolts etc. of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level with cold twisted bar |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: columns,pillar etc. for mass concrete. |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 13 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 14 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete 2 mm thick |
| 15 | Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) |
| 16 | Providing and fixing of natural stone red boulder cement based with minimum warranty 2 years .The cost is inclusive of all the necessary tools required and the design to be approved by Engineer-in-charge |
| 17 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shadeTwo or more coats on new work |
| 19 | Providing and fixing inaugration plate including writing etc. complete job. |
| 20 | Providing and fixing gang saw cut, mirror polished, premoulded and prepolished, machin cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels |
| 21 | Add provision of electrification |
| 22 | Carriage of materials by mechanical transport including loading / unloading & stacking complete sand for an avg distance of 10kms |
| 23 | Carriage of materials by mechanical transport including loading / unloading & stacking complete stone aggregate below 40mm nominal size for an average distance of 10 kms. Please Enable Macros to View BoQ information |