|
| 1 | Carriage of cement,stone blocks, G.I ,HDEP,C.I ,A.C ,Stainless steel,steel,C.G.I sheets and CC pipes below 100mm dia and other heavy material from Nerest source to road side of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- (a) 01KM |
| 2 | (b) 02KM |
| 3 | (c) 03KM |
| 4 | (d) 04KM |
| 5 | (e) 05KM |
| 6 | (f)Beyond 5km upto10 km perkm |
| 7 | (g)Beyond 10km upto20 km perkm |
| 8 | (h) Beyond 20km per additional km |
| 9 | R.C.C. pipe, A.C. pipes, steel cylinder, R.C. pipes, G.I pipes, D.I. pipes, M.S. pipes, C.I. pipes and unreinforced cement pipe (a) 01KM |
| 10 | (b) 02KM |
| 11 | (c) 03KM |
| 12 | (d) 04KM |
| 13 | (e) 05KM |
| 14 | (f)Beyond 5km upto10 km perkm |
| 15 | (g)Beyond 10km upto20 km perkm |
| 16 | (h) Beyond 20km per additional km |
| 17 | Carriage of sand & 20mm bajree from source to road side of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- (a) 01KM |
| 18 | (b) 02KM |
| 19 | (c) 03KM |
| 20 | (d) 04KM |
| 21 | (e) 05KM |
| 22 | (f)Beyond 5km upto10 km perkm |
| 23 | (g)Beyond 10km upto20 km perkm |
| 24 | (h) Beyond 20km per additional km |
| 25 | Carriage of 40mm stone aggregate from source to road side of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- (a) 01KM |
| 26 | (b) 02KM |
| 27 | (c) 03KM |
| 28 | (d) 04KM |
| 29 | (e) 05KM |
| 30 | (f)Beyond 5km upto10 km perkm |
| 31 | (g)Beyond 10km upto20 km perkm |
| 32 | (h) Beyond 20km per additional km |
| 33 | Carriage of soling stone from nearest source to site of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- (a) 01KM |
| 34 | (b) 02KM |
| 35 | (c) 03KM |
| 36 | (d) 04KM |
| 37 | (e) 05KM |
| 38 | (f)Beyond 5km upto10 km perkm |
| 39 | (g)Beyond 10km upto20 km perkm |
| 40 | (h) Beyond 20km per additional km |
| 41 | Carriage of Stone blocks,G.I ,HDEP,C.I,A.C ,stainless steel and C.C pipes below 100mm dia and other heavy materials/knitted crates by Manual means including loading unloading and stacking for an av. Distance Ist 50 metres . |
| 42 | Every additional lead of 50 metres or part there of beyond 1st 50 metre |
| 43 | Carriage of R.C.C. pipe, A.C. pipes, steel cylinder, R.C. pipes, G.I. pipes, D.I. pipes, M.S. pipes, C.I. pipes and unreinforced cement pipe by Manual means including loading unloading and stacking for an av. Distance Ist 50 metres . |
| 44 | Every additional lead of 50 metres or part there of beyond 1st 50 metre |
| 45 | Carriage of cement from road side to site of work by Manual means including loading unloading and stacking for an av. Distance Ist 50 metres |
| 46 | Every additional lead of 50 metres or part there of beyond 1st 50 metre |
| 47 | Carriage of sand & 20mm bajri from road side to site of work by Manual means including loading unloading and stacking for an av. Distance Ist 50 metres . |
| 48 | Every additional lead of 50 metres or part there of beyond 1st 50 metre |
| 49 | Carriage of 40mm stone aggregate from road side to site of work by Manual means including loading unloading and stacking for an av. Distance Ist 50 metres . |
| 50 | Every additional lead of 50 metres or part there of beyond 1st 50 metre |
| 51 | Carriage of stone from road side to site of work by Manual means including loading unloading and stacking for an av. Distance Ist 50 metres . |
| 52 | Every additional lead of 50 metres or part there of beyond 1st 50 metre |
| 53 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: . |
| 54 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 55 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, not consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 56 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 57 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 58 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) (Nallah stone) |
| 59 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone (Nallah stone) |
| 60 | Welding, including transportation of plant at site etc. complete By gas plant |
| 61 | Welding, including transportation of plant at site etc. complete By electric plant |
| 62 | Cemcet plaster with a floating coat of neat cement 12 mm cement plaster finished with a floating coat of neat cement mix (1:3) 1 cement : 3 fine sand. |
| 63 | Finishing walls with water proofing cement paint of required shade: Old work (one or more coats applied @ 3.84 kg/10sqm) complete |
| 64 | Dismentling manually/Machanically includind stacking of serviceable material and disposal of Unserviceable material with in 50m lead as per direction of Engineer in charge Bituminous road |
| 65 | Dismentling manually/Machanically includind stacking of serviceable material and disposal of Unserviceable material with in 50m lead as per direction of Engineer in charge Water bound macadam road. |
| 66 | Dismantling G.I pipes (external work) including excavation and refilling trenches after taking out the pipes manually /by mechanical means including stacking of pipes with in 50 m lead Above 40 mm dia nominal bore |
| 67 | 20 mm to 40 mm dia nominal bore |
| 68 | Laying and fitting of G.I. Pipes (all classes)complete excliding costof pipes,fitting and earth work 100 mm & 150 mm dia G.I pipes |
| 69 | 80 mm & 65 mm dia G.I pipes |
| 70 | 50 mm & 40 mm dia G.I pipes |
| 71 | 32 mm & 25 mm dia G.I pipes |
| 72 | 20 mm dia G.I pipes |
| 73 | Providing and fitting of G.I. Pipes complete with G.I fitting excliding trenching & refilling etc.(external work)100 mm dia nominal bore (Light) |
| 74 | 80 mm dia nominal bore (Light) |
| 75 | 65 mm dia nominal bore (Light) |
| 76 | 50 mm dia nominal bore (Light) |
| 77 | 40 mm dia nominal bore (Light) |
| 78 | 32 mm dia nominal bore (Light) |
| 79 | 25 mm dia nominal bore (Light) |
| 80 | 20 mm dia nominal bore (Light) |
| 81 | Providing and fixing of gun metal gate value with C.I wheel of approved quality (screwed end) 80 mm dia nominal bore |
| 82 | 65 mm dia nominal bore |
| 83 | 50 mm dia nominal bore |
| 84 | 40 mm dia nominal bore |
| 85 | 32 mm dia nominal bore |
| 86 | Providing and fixing of G.I Union in existing G.I Pipes line cutting and threadind the pipes and making long serews including excavation refilling the earth or cutting of wall and making good the same complete wherever required. 80 mm dia nominal bore |
| 87 | 65 mm dia nominal bore |
| 88 | 50 mm dia nominal bore |
| 89 | 40 mm dia nominal bore |
| 90 | 32 mm dia nominal bore |
| 91 | 25 mm dia nominal bore |
| 92 | 20 mm dia nominal bore |
| 93 | Dismantling old plastre or skirting ,raking out joints and cleaning the surface for plaster in cluding disposal to the dumping ground with in 50 m lead. |
| 94 | Providing Main hole cover L.D rectangular 455X610 mm with frame |
| 95 | Providing Main hole cover L.D rectangular 455X610mm without frame |
| 96 | Providing and fixing of G.I Union in G.I Pipes including cutting and threadind the pipes and making long serews etc.complete new work 80 mm dia nominal bore |
| 97 | 65 mm dia nominal bore |
| 98 | 50 mm dia nominal bore |
| 99 | 40 mm dia nominal bore |
| 100 | 32 mm dia nominal bore |
| 101 | 25 mm dia nominal bore |
| 102 | 20 mm dia nominal bore |
| 103 | Providing laying and fitting of HDEP Pipes including fitting PN- 10 110 mm dia |
| 104 | 90 mm dia |
| 105 | 75 mm dia |
| 106 | 63 mm dia |
| 107 | 50 mm dia |
| 108 | 40 mm dia |
| 109 | 32 mm dia |
| 110 | 25 mm dia |
| 111 | Laying and fitting of HDEP Pipes (all classes)complete with G.I fitting excliding costof pipes,fitting and earth work 110 mm dia |
| 112 | 90 mm dia |
| 113 | 75 mm dia |
| 114 | 63 mm dia |
| 115 | 50 mm dia |
| 116 | 40 mm dia |
| 117 | 32 mm dia |
| 118 | 25 mm dia |
| 119 | Clearing snow (with frost) from roads manually using picks and shovels snow depth upto 150mm |
| 120 | Engagement of Fitter |
| 121 | Engagement of Labour for silt clearance in Service Reservoir Please Enable Macros to View BoQ information |