| 1 | Supply, Installation, testing & Commissioning of 250 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Copper wound , and with LV Cable Box having detachable Aluminium Gland plate |
| 2 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 9 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 33] |
| 3 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 8 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 15] |
| 4 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and Laying of 0.05 ACSR Conductor |
| 5 | Providing and installation of 25 sqmm PVC twin core Al-Cable FRLS Type of Standard make (Havells/Gloster/Polycab or Equivalent Make) |
| 6 | Providing and installation of 10 sqmm PVC twin core Al-Cable FRLS Type of Standard make (Havells/Gloster/Polycab or Equivalent Make) |
| 7 | Providing and installation of 6 sqmm PVC twin core Al-Cable FRLS Type of Standard make (Havells/Gloster/Polycab or Equivalent Make) |
| 8 | Providing and installation of 1.5mmSq Multi Stranded copperCable FRLS for operation of LEDLights (Havells/Gloster/Polycab or Equivalent Make) |
| 9 | Providing and installation of 1 mmSq Multi Stranded copperCable FRLS for operation of LEDLights (Havells/Gloster/Polycab or Equivalent Make) |
| 10 | Providing and installation of S.S combine of Quality Make ( Havels/ Anchor or Equivalent Make) |
| 11 | Providing and installation of 15 Amp Extension Chord of Standard make ( Havels/ Anchor or Equivalent Make) |
| 12 | Providing and installation of ON OFF Switches outdoor type, rain resistant of ( Havels/ Anchor or Equivalent Make) |
| 13 | Supply/ Installation, testing and Commissioning of Pendent Holders ( Havels/ Anchor or Equivalent Make) |
| 14 | Supply/ Installation, testing and Commissioning of additional LED Lights 45watt (Havells/Phillips/Syska or Equivalent Make) |
| 15 | Providing , Installation , testing and commissioning of LED 15 /10 W ( Havells/HPL/Phillips or Equivalent Make) |
| 16 | Providing , Installation , testing and commissioning of 11KV Link Set (Line Type) Heavy Duty, |
| 17 | Supply,installation, testing and commissioning of 16 KN Polymer Shackle Insulators LT |
| 18 | Supply,installation, testing and commissioning of GI Mukey for Shackle Insulator with Bolt of (50x6)mm |
| 19 | Providing & fixing of GI Channel cross-arm (100 x 50x6mm) / 75x40x40 x6mm including back clamps of 50X8 mm for fixing Cross arm and pole top bracket, Angle Pole Top Bracket (50x50x6 mm) including back clamps of 50X8 mm for fixing Cross arm and pole top bracket . . |
| 20 | Supply,installation, testing and commissioning of 11 KV Polymeric Composit pin with insulator insulator 12 KV, 5 KN,Light Impulse 75 KVPositive and 80 KV Negative ,Creepage distance 320 mm |
| 21 | Supply,installation, testing and commissioning of 11 KV Polymeric Composit disc insulator 12 KV,5KN, light impulse 75 KVPositive and 80 KV Negative ,Creepage distance 320 mm |
| 22 | Supply,installation, testing and commissioning of 400 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type |
| 23 | Supply,installation, testing and commissioning of Gapless Surge Arrestor, 9kV, 10KA LA with polymer housing, station type. |
| 24 | Supply,installation, testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 25 | Supply,installation, testing and commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole,200 Amp, Vertical Type |
| 26 | Providing & Painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint) |
| 27 | Supply,installation, testing and commissioning of Galvanized Nuts and Bolts of sizes. |
| 28 | Providing & Laying of Cement bottoming 1:2:4 mix as per Standards 0.40 cum per pole for ( 8 Mtr) |
| 29 | Providing & Laying of Cement bottoming 1:2:4 mix as per Standards 0.45 cum per pole for ( 9 Mtr) |
| 30 | Providing & fixing of Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm |
| 31 | Providing & Laying of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm No.minal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover |
| 32 | Supply,installation, testing and commissioning of LT Distribution Box for 250 kVA DTR with 400Amp MCCB 3P 16 kA for incomer & 160 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits |
| 33 | Supply,installation, testing and commissioning of GI wire |
| 34 | Providing & fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2No..), anchor plate (200x 200 x 6 mm), nut-bolts, 2 No. turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete (11 kV) |
| 35 | Supply,installation, testing and commissioning of LT Changeover 400 Amp for three phase LT Network |
| 36 | Supply,installation, testing and commissioning of Danger Plates with clamps with writing in English and Regional Language |
| 37 | Supply,installation, testing and commissioning of Anti Climbing Device with Clamps |
| 38 | Providing & fixing of Wedge Connectors/PG Clamps |
| 39 | Sundry Items like Aluminium Lugs, Jumpers, Binding Tape |
| 40 | Dismentalling of Existing Distribution Transformer and returned to Divisional Store |
| 41 | Dismantling of the temporary facility and returning of materials to div stores after completion of Yatra |
| 42 | Carriage/ Installation testing and commissioning/Operation and Maintanence of Installed Equipments and system for 55 Days |
| 43 | Watch and Ward of the infrastructure created, 2labs/day in two shifts for 55days |
| 44 | Supply, Pitching of Tent accomodation with bedding along track will be provided by Departement |
| 45 | Pre and Post Geo tagged Photographic Evidence consisiting of 5x7 inch Photographs and Autocad Single Line Diagram Please Enable Macros to View BoQ information |