| 1 | Work of Construction of 145kV AIS Bay for 160MVA TFR-2nd at 220kV Hybrid Hapur SS under ETD-HAPUR On O&M fund with all cost of Men, Materials, Misc. Consumables, T&P etc. which is required for satisfactory completion of above work as per technical Specifications and Directions of Supervising Engineer as per site requirement whose details is as below:- Supply of Materials. (i) 25X6mm MS Flat |
| 2 | (ii) 50X6mm MS Flat |
| 3 | (iii) 75X10mm MS Flat |
| 4 | Copper Bond |
| 5 | Supply of PG Clamp (4 Bolted Type) duly made up with LM-6 Aluminum Alloy suitable for Tarantula to Zebra Conductor complete with appropriate size and number of GI Bolts, Nuts, Spring & Plain Washers as per technical specification & Sample. |
| 6 | Supply of PG Clamp (4 Bolted Type) duly made up with LM-6 Aluminum Alloy suitable for ACSR Zebra to Zebra Conductor complete with appropriate size and number of GI Bolts, Nuts, Spring & Plain Washers as per technical specification & Sample. |
| 7 | Supply of Bus Post Clamp suitable for Zebra (As per Specification & Sample). |
| 8 | Carriage of Materials :- Safe Loading, Carriage and Unloading of 145kV VCB (SIEMENS make, along with all auxiliaries) from 132kV SS DASNA to 220kV SS HYBRID HAPUR in appropriate size transportation vehicle.Work Includes safe loading and Unloading through Hydra/Crane at the site of loading and unloading and safe carriage as per satisfaction of JE/SDO 220kV HYBRID HAPUR. Approximate Distance 15km. |
| 9 | Safe Loading, Carriage and Unloading of 20 Nos. 145kV BUS Post Insulator from 220kV RC Green SS,ETD-II NOIDA to 220kV SS HYBRID HAPUR in appropriate size transportation vehicle.Work Includes safe loading and Unloading through Hydra/Crane at the site of loading and unloading and safe carriage as per satisfaction of JE/SDO 220kV HYBRID HAPUR Approximate Distance 50km |
| 10 | Fabrication of following structures :- Fabrication of 3 Nos. BCT, Structure by cutting, welding, etc. from old and aborted tower parts (which shall be provided by department) and erection of such made structure. All the skilled manpower and T&P shall be arranged by contractor at its own cost. |
| 11 | Fabrication of 2 Nos. BBL, Structure by cutting, welding, etc. from old and aborted tower parts (which shall be provided by department) and erection of such made structure. All the skilled manpower and T&P shall be arranged by contractor at its own cost. |
| 12 | Fabrication of 1 No. BTI, Structure by cutting, welding, etc. from old and aborted tower parts (which shall be provided by department) and erection of such made structure. All the skilled manpower and T&P shall be arranged by contractor at its own cost. |
| 13 | Erection of following equipment’s on their structures for construction of new 145kV LV AIS Bay for 160MVA TFR 2nd as per their installation manual or JE/SDO supervision. Work also include shifting of equipment’s from store to the site of installation and all other associated works for completion of Erection work satisfactorily :- (i) 145 kV SF6 CB with structure |
| 14 | (ii) 145 kV C.T. (400-200/1 A) |
| 15 | (iii) 145 kV C.T. Junction Box |
| 16 | (iv) 145kV Bus Isolators without earth switch |
| 17 | (v) 145kV Tandem Isolators |
| 18 | Jumpering and interconnection between bay equipment and with various bus section :- Jumpering of various bay equipment with ACSR Zebra Conductor for providing interconnection between bay equipment’s and connection with main and transfer bus at S/S. Work will require satisfactorily completion as per directions of JE/SDO |
| 19 | Cutting, Strengthening, Laying of 50mm x 6mm & 75mm x 10 mm MS flats for earthing new erected Aux. Structures, Equipment. Work includes welding with main earthmat and with the object to be earthed, excavation of trenches to accommodate flats, its back filling and completion of Earthing job satisfactorily as per departmental standards. (i) Earthing of Aux. Structure and equipment’s with 50 mm x 6 mm MS flat. |
| 20 | (ii) Earthing CTs & Main Structure with 75 mm x 10 mm MS flat. |
| 21 | (iii) Earthing Trenches with 25 mm x 6 mm MS flat |
| 22 | Painting of MS flats used for Earthing, all kinds of paints, primer brushes shall be provided by contractor :- (i) 50 mm x 6 mm MS flat (in Green Colour) |
| 23 | (ii) 75 mm x 10 mm MS flat (in Green Colour) |
| 24 | (iii) 25 mm x 6 mm MS flat (in Green Colour) |
| 25 | Termination of various size control cables already present in the cable trenches connected at control panels and corresponding connection needs to be done at various bay equipment’s and auxiliaries under supervision of JE/SDO. Work includes satisfactorily completion as per JE/SDO Guidance. (i) Termination of 2CX2.5 sq mm Control Cable |
| 26 | (ii) Termination of 4CX2.5 sq mm Control Cable |
| 27 | (iii) Termination of 6CX2.5 sq mm Control Cable |
| 28 | Dismantling of Structures and PASS Module :- Dismantling of Existing ALP structures, By cutting all earthing connections and as per instructions of JE/SDO at site. Work include safely bringing out above PASS module from yard and Placing in store as per direction of JE/SDO |
| 29 | Dismantling of HYBRID PASS MODULE along with it's base structure commissioned at LV side of 160MVA TFR-IInd by opening all interconnections, Earthing and terminations as directed by JE/SDO. Work include safely bringing out above PASS module from yard and Placing in store as per direction of JE/SDO Please Enable Macros to View BoQ information |