| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.. All kinds of soil. The contrector has to detect different utilites like sewer line water supply line elecctric cable telephone cable gas pipe line etc. using utility detecting machine before start of excavetion and shall start excavetion only after getting permission of Engineer -in Charge . |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 7 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum.Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level |
| 8 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand ) |
| 9 | Neat cement punning |
| 10 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-incharge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). |
| 11 | Providing and fixing plain non asbestos cement sheet strip in joint pavements/terrazo flooring 100mm wide & 6mm thick |
| 12 | Fabrication & Manufacturing of Prestressed Hollow Core slab (Hollow area 25 to 30%) of different thickness & modular width 1200 mm in Controlled Factory Environment with approved methodology confirming to IS 10297:1982 by using long line casting method having arrangement of proper steel bed. Concreting should be done by batch mixing plant capable of producing zero slump concrete, transported through automatic shuttels of standard make & layed on bed with the help of extruder/Slipformer, finishing, curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in slab element after achieving required strength, yard handling & stacking all complete as per approved shop drawings & design mix as per the direction of the Engineer-in-charge. (Cost of strands should be paid separately). Note: Excess/less cement over the specified cement content used as per design mix is payable/ recoverable separately) including steel & Transport charge. 150 mm thick hollow core slab |
| 13 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 14 | Filling available excavated earth (Excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead to 50m and lift up to 1.50mt. |
| 15 | supply of Mobile Hydraulic crane 35 Tonne Capacity (173 HP) in all respect as per direction of Engineering in-Charge |
| 16 | Providing wall putty on new surface with approved quality material of Berger /JK/Birla or similar make 2 coats . |
| 17 | Painting with synthetic enamel paint for approved brand and manufacture to given an even shade : Two or more coats on new work over and under coat of suitable shade with ordinary paint of approved brand and manufacture. Please Enable Macros to View BoQ information |