| 1 | Dismantlling and removing old tiled flooring including removing the base coarse and stacking the useful materials for re-use and removing the debries within 50mtr lead (Data for 9.30 M2) |
| 2 | Dismantling B.M. in cement mortar above 3mtr height including stacking the useful materials for re-use & removing the debries away from work site within 50mtr lead (Data for 3.83Cum) |
| 3 | Earth work excavation in all kinds of soil with lead & lift etc., including leveling and dressing of bed etc., complete |
| 4 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete |
| 5 | Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of the Engineer-incharge |
| 6 | P.C.C (1:3:6) using 4cm size b.h.g (HB) metal including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete |
| 7 | Supplying all materials, labour and T&P for Cement concrete (1:2:4) using 12 mm size CBHG chips in foundation and floor/ RCC work, watering and curring etc as per specification and direction of EIC. |
| 8 | RCC M-20 cement concrete with using 20 mm to down graded chips with all cost labour material complete including cost of all machinary such as conccrete mixture,vibrator etc |
| 9 | Labor for M.S. reinforcement for RCC work including cutting, bending, binding with all cost of labour, T&P, cost of binding wire, etc. complete. |
| 10 | Rigid smooth centering & shuttering for CC or R.C.C. work including false work & dismentalling then after casting with all cost etc. complete. WALL |
| 11 | Toilet Roof |
| 12 | Fly ash brick work (1:6) in Foundation & plinth including all cost etc. complete. |
| 13 | Fly ash brick work (1:6) in superstructure including all cost etc. complete. |
| 14 | 6 mm C.P. (1:4) including all cost etc. complete. |
| 15 | 16 mm C.P. (1:6) including all cost etc. complete. |
| 16 | 12 mm C.P. (1:6) including all cost etc. complete. |
| 17 | Painting two coats coats with weather seal coat over a coat of water bound wall primer including all material labour complete . |
| 18 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect |
| 19 | Supplying, fitting, fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C & stainless square pipe bracing of 32mm x 32mm x 2mm in 3 rows in stair case as per approved design & specification, buffing, polishing etc. with cost, conveyance, taxes of all materials, labour, T&P etc. required etc., complete.(A) |
| 20 | stainless square pipe |
| 21 | Modern Art or terracotta art painting to different boundary wall inside the Municipality area as per direction of the Engineer-in-charge with all cost of materials & labour etc. complete in all respect. |
| 22 | Supplying all materials, labour and T&P for Fixing tiles in floor, treads of steps, landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixing with pigment to match the shade of the tiles including rubbing and polishing including cost of pre-cast ceramic tiles etc. as per specification and direction of EIC. |
| 23 | Supplying all materials, labour and T&P fo Fixing tile in dadoos, skirting and riser of steps on 12 mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixing with pigment to match the shade of the tiles including rubbing and polishing including cost of pre-cast tiles. (Ceramic) etc. as per specification and direction of EIC. |
| 24 | Cost towards Installation of UPVC doors etc all complete |
| 25 | Cost towards Installation of R.C.C bench etc all cost complete |
| 26 | Cost towards Installation of I LOVE TALCHER selfie light board etc all complete |
| 27 | Cost towards Transperency board, photograph & other unforseen items |
| 28 | Fitting fixing all items of Borewell etc complete |
| 29 | Add towards GST18% Please Enable Macros to View BoQ information |