|
| 1 | Servicing of 100KVA DG Set including M-OIl Change/Battery charging/Plug Change/Change of filters etc to make DG Set functional at Transit Base Camp FCI Godown Mirbazar and at Transit Base Camp at Walnut Factory Qazigund. This also includes installation, carriage of batteries from diviisonal stores kulgam to base camps and their back carriage to divisional stores after culmination of yatra. |
| 2 | Daily (24 hours a day) Operation and Maintenance of existing 100KVA D.G Set using skilled labours during the Proposed Yatra period but excluding the cost of fuel charges at Transit Base Camp FCI Godown Mirbazar and at Transit Base Camp at Walnut Factory Qazigund. This also includes carriage of HSD (Fuel) from nearby petrol pump. (Supply of fuel shall be paid separately as per the market rate) |
| 3 | SITC of GO, AB Switch, 3-Phase, 3-Pole, 200Amp, Vertical type at Walnut Factory Qazigund |
| 4 | SITC of 95sqmm, 1.1kv grade, XLLPE insulated Stranded Conductor FRLS type |
| 5 | Supply,Installation, Operation and Maintenance of 09 Watt LED Lamps including Holders , Shades , Bed switches with Allied Wiring during the entire Yatra period at Transit Base Camp FCI Godown Mirbazar and Transit Base Camp at Walnut Factory Qazigund. |
| 6 | Carriage, installation, operation and maintenance of 09W LED lamps from divisional stores to FCI Godown Mirbazar, providing of pendent holders, switches with allied material complete |
| 7 | Dismantling and back carriage to divisional stores of LED lamps inlcuding holders, switches after culmination of YATRA. |
| 8 | Carriage from divisional stores,Installation, Operation and Maintenance of 3/5 Pin Socket, 6 Amp complete with Allied wiring and switches including the Installation & Operation during the entire Yatra Period at Transit Base Camp FCI Godown Mirbazar including thier dismantling and back carriage to divisional stores after culmination of YATRA. |
| 9 | Supply,Installation, Operation and Maintenance of 3 Pin Socket, 6 Amp complete with Allied wiring and switches including the Installation & Operation during the entire Yatra Period at Transit Base Camp FCI Godown Mirbazar and Transit Base Camp at Walnut Factory Qazigund including thier dismantling and back carriage to divisional stores after culmination of YATRA. |
| 10 | Supply,Installation, Operation and Maintenance of 5 Pin Socket, 6 Amp complete with Allied wiring and switches including the Installation & Operation during the entire Yatra Period at Transit Base Camp FCI Godown Mirbazar and Transit Base Camp at Walnut Factory Qazigund including thier dismantling and back carriage to divisional stores after culmination of YATRA. |
| 11 | Supply , installation ,testing & commissioning charges of LT 3 Phase Change-over 200A complete with Allied wiring including the Installation & Operation during the entire Yatra period at Transit Base Camp FCI Godown Mirbazar and Walnut Factory Qazigund including dismantling and backcarriage to divisional stores after culmination of Yatra. |
| 12 | Hire and Maintenance charges of PVC 16SQMM twin core cable including laying and fixing of same as Service lines at various points within the Transit camp at FCI Godown Mirbazar & Walnut Factory Qazigund. (90mtr Coil) for entire Yatra period. |
| 13 | Hire and Maintenance charges of PVC 1sqmm single core cable including laying and fixing of same at various points within the Transit camp at FCI Godown Mirbazar & Walnut Factory Qazigund. (90mtr Coil) for entire Yatra period. |
| 14 | Hire and Maintenance charges of PVC 1.5sqmm single core cable including laying and fixing of same at various points within the Transit camp at FCI Godown Mirbazar & Walnut Factory Qazigund. (90mtr Coil) for entire Yatra period. |
| 15 | Supply, Operation and Maintenace of Standing fan 400mm Sweep with Allied wiring and switches during the entire Yatra period at Transit Base Camp Walnut Factory Qazigund including backcarriage to divisional stores after culmination of Yatra. |
| 16 | Carriage from divisional stores, Operation and Maintenace (Complete Job) of Standing fan during the entire Yatra period at Transit Base Camp Walnut Factory Qazigund including backcarriage to divisional stores after culmination of Yatra. |
| 17 | Supply, Operation and Maintenace of Ceiling Fans 1200mm Sweep complete with Allied wiring, iron rod for attaching of fan and switches for the entire Yatra period at Transit Base Camp Walnut Factory Qazigund including backcarriage to divisional stores after culmination of Yatra. |
| 18 | Carriage from Divisional stores, Operation and Maintenace of Ceiling Fans complete job including providing of Allied wiring, iron rod for attaching of fan and switches for the entire Yatra period at Transit Base Camp FCI Godown Mirbazar including backcarriage to divisional stores after culmination of Yatra. |
| 19 | SITC of 300mm Metallic Exhaust Fan and their dismantling and back carriage to divisional workshop after culmination of Yatra. |
| 20 | Carriage from divisional stores, Operation and maintenance of Exhaust Fan, including providing of allied wiring and their dismantling and back carriage to divisional workshop after culmination of Yatra. FCI Godown Mirbazar |
| 21 | Supply, Operation and Maintenace (Complete Job including wiring) of 100L Desert Cooler,17-Inch Fan Blade, 3-Side Honeycomb Pads,Auto Swing,1-Year replacement Warranty, during the entire Yatra period at Transit Base Camp FCI Godown Mirbazar & Walnut Factory Qazigund including backcarriage to divisional stores after culmination of Yatra. |
| 22 | Supply installation testing and comm. of Energy saving, environmental friendly, long life, exclusive innovative die-cast aluminium non integral IP66 flood light, suitable for high mast application, 200 W and 110lum/W with high power LED's as light source Havells ( JETA Valour integral)/Crompton/ Philips/Bajaj/Murphy/WIPRO/HPL including the service connection by way of 2.5 mmsq multistrand copper wire. |
| 23 | Supply of Al 20 ft foldable telescopic ladder EN131 Certified, lightweight collapsable out of T&P items |
| 24 | Supply of 2 tonn, double fall 6m Chain Pulley Block out of T&P items |
| 25 | Supply and testing of Tool Kit (Ring Spanner full set, Open End Spannar ful set, Plier 01 NO, Secrew Driver 01 set, Adjustable Wrench, Wire cutter, Nose plier, Clamp-on meter 01 No. Please Enable Macros to View BoQ information |