| 1 | Execution of work under following items |
| 2 | Towards the carefully dismantling/removing the damaged/broken Stone members manually means including stacking of serviceable and disposal of unserviceable material within 50 meters lead and lift up to 10 meters as per direction of Engineer-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 3 | Towards the carefully removing the old brick work from the stone structure and cleaning the surface including disposal of rubbish to the dumping ground within 50 meters lead and lift up to 10 meters as per direction of Engineer-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 4 | Towards the carefully removing the old plaster or tiles or both from the stone structure and cleaning the surface 3 including disposal of rubbish to the dumping ground within 50 meters lead as per the direction of Site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 5 | Towards the Coursed rubble masonry (first sort) with hard stone in foundation and plinth with: Cement mortar 1:6 (1 cement: 6 coarse sand) below the 5.00 mts. from the ground level including carrage of the materials with lead up to 30 meters and lift up to 20 meters approx. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 6 | Towards the Stone work ashlar sunk or molded or ornamental design or sunk, ornamental design and molded as per existing design style and texture up to floor five level in lime sand surkhi mortar 1:1:1 (1) Lime: 1 sand: 1 Surkhi )and fixing of SS clamp including pointing with white lime sand surkhi mortar 1:1:1 5 (Lime :1 sand: I Surkhi) with an admixture of pigment matching the stone shade including carrage of the materials with lead & lift up to 30 meters approx etc. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 7 | Towards the Stone work in changing architectural member like pillar, lintel etc as per existing design style and texture in lime sand surkhi mortar 1:1:1 (1 Lime:1 sand: 1 Surkhi )and fixing of SS clamp including pointing with white lime sand surkhi mortar 1:1:1 (1 Lime:1 sand: 1 Surkhi) with an admixture of pigment matching the stone shade after removing the old one including carriage of the materials with lead & lift up to 30 meters approx. etc. all complete as per the direction of the site-in-charge (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 8 | Towards the steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position. And applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (make should be approved before execution of work) including carrage of the materials with lead & lift up to 30 meters approx etc. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 9 | Towards providing and fixing double scaffolding system. (cup lock type) on the exterior side of building/structure, up to 25 meter height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 meter center to center, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc., wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note: - (1) The elevation area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 10 | Towards provision for providing support of wooden (teakwood quality column) section 250mmX250mm up to 3 m height and fixing wooden plank 50mmX250mm up to 1 m length at top & bottom of column at stone members during changing the damaged stone members including all complete as per the direction of site-in-charge. (all wooden members will be hand over to the department after completion of the work) including carriage of the materials with lead & lift up to 30 meters approx. etc. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 11 | Towards provision for Lime processing motor preparation unit made by bamboo frame & Covering poly tarpaulin (20 X16') with masonry chambers (8'X4' 2,8'X6'-4, 8'X8'-1,) by brick masonry plastering p.c.c. platforms (20'x16') with water connection from 200 mt distance from main source for conservation. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 12 | Towards provision for before after documentation of conservation work by photography, detailed 14 drawings plan, elevation, section etc all complete. As per direction of competent authority. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 13 | Towards the drilling holes of 12mm dia up to 300mm depth and fixing nozzle for PMC Grout in the inside wall of the well of Mata Bhawani Stepwell as per the direction of site-in-charge. [EACH] (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 14 | Towards PMC Grouting of roof area with acrylic polymer emulsion added with OPC one part having polymer loading 10% with appropriate dose non shrink powder 0.05 part (Cebex) and plastic sizer 0.05 16 part having pressure 0.2 to 0.5 Kg/Sq. inside the well of Mata Bhawani Step well, including thorough cleaning and washing of the entire grouted exposed surface. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 15 | Towards the painting with synthetic enamel paint of approved. Brand and manufacturer to give an even shade: 17 Two or more coats on new work including all materials and labour charges etc. Complete as directed by the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 16 | Towards CEMENT PLASTER (IN COARSE SAND) 12 mm cement plaster of mix: 1:4 (1 cement: 4 coarse 18 sand) including all materials and labour charges etc. Complete as directed by the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 17 | Towards providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated Jor L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 12.1.1 1.00 mm thick with zinc coating not less than 275 gm/m\\" including all materials and labour charges etc. Complete as directed by the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 18 | Towards the steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. Including cutting, hoisting, fixing in position and 20 applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc., complete. Hot finished seamless type tubes (Including all the materials & labour charges etc. complete as direction by site in charge) |
| 19 | Towards hiring charges for water pump(2 H.P. open well Submersible, 08 hrs per day for each pump) to drain the water from the well before and during the conservation work as per the direction of site-in-charge all complete (Including all the materials & labour charges etc. complete as direction by site in charge) Please Enable Macros to View BoQ information |