| 1 | Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of girth upto 30 cms. Measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50m out side the periphery of area cleared. SOR I.NO. 4.06/ 259 (I) |
| 2 | Supply of J.C.B Complete at site on hire basis including cost of diesel and driver etc. complete in all respect as per direction of engineer-in-charge |
| 3 | Supply of Tractor with trolley complete at site on hire basis including cost of diesel and driver etc. Complete as per direction of E/I of work as per SOR |
| 4 | Supply of Labour/ Beldar as Per SOR |
| 5 | Supply of Hyva |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand AOR 6.1.1 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 10 | 12 mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand) |
| 11 | Neat cement punning. |
| 12 | Providing and placing in position 100 mm thick factory mademachine batched & machine mixed Precast RCC RectangularCovers on drains of footpath of various sizes, of M-25 gradecement concrete for RCC work,including cost of centering,shuttering,reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/con both ways , neat cement punning on finished surface,properly encased on all edges with 1.6 mm thick, 100 mm wideMS sheet duly painted over priming coat ,reinforcement to bewelded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etci/c cost of cartage, all leads & lift, handling at site etc. allcomplete as per direction of Engineer-in-Charge. |
| 13 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved. Please Enable Macros to View BoQ information |