|
| 1 | Cutting and removing of RCC/rich by using pavement breaker and air compressor, including the cost of hire charges of pavement breaker and air compressor, all labour charges for breaking and stacking of unserviceable and serviceable materials within 50 mtrs as directed by the EIC, gas, cutter, transporation charges of all materials to work site, all labour charges, minor tools and plants ,GST,LWC, etc., complete. |
| 2 | Providing and laying PCC M20 (1:1.5:3 - one cement, one and half mainland river sand & three stone chips) using 20 mm. graded stone chips from Main land, Mainland River Sand, 43 grade Ordinary Portland Cement, approved plasticizer, silica fume for cast-in-situ concrete items for wearing coat etc. as indicated in the drawing and as directed by the EIC including cost of nominal shuttering, cement, silica fume, plasticizer, cost of stone chips, mainland river sand, all labour charges for mixing, conveying, placing, consolidation, screening and washing of stones chips and sand, transportation charges of all materials to Work Site and running charges of batching plant, vibrator, consumables and all other equipments required for this work , cost of minor tools and plant etc. complete. |
| 3 | Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand ) including cost of all materials , labour charges transportation charges of all materials to work site, scaffolding charges, LWC & GST etc., complete. |
| 4 | Fixing/ Placing of Mini giant tyre fenders on the berthing face of the jetty/wharf/ Ferry containing one Mini Giant tyre ( Of Outer DIa 1.1 m to 1.40m , Inner Dia 0.5m to 0.6m and thickness 0.35 to 0.50m), excluding cost of mini giant tyres MS Plate 8mm , Heavy duty G.I PIpe 3\\" , Wire rope ( 25 MM),Wire Grip (25mm) , cuttings holes and providing fixtures to the tyres in position as directed by the EIC, cost of all labour charges, transportation charges of all materials to work site, scaffolding charges , LWC & GST etc., complete. |
| 5 | Painting two coats with synthetic enamel black paint on the surface of 10 Ton capacity bollards and numbering over the bollards well as the tyre with white paint as required, including cost of paint, brush all labour charges, minor tools , LWC &GST etc., complete |
| 6 | a) 10 Ton Bollard |
| 7 | Supply of Engine Dinghy/ Motor Launches with fuel and crews as & when required for transportation of department staff for supervision including hire charges of engine dinghy with fuel & operator Please Enable Macros to View BoQ information |