|
| 1 | Electrical Items : |
| 2 | DEAD END CLAMP WITH I HOOK ABCABLE SP-10 |
| 3 | DEAD END CLAMP WITH I HOOK ABCABLE SP-21 |
| 4 | DEAD END CLAMP WITH I HOOK ABCABLE SP-23 |
| 5 | EARTH WIRE CLAMP FOR SP-10 WITHN/B |
| 6 | EARTH WIRE CLAMP FOR SP-55 WITHN/B |
| 7 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 8 | STAY CLAMP FOR SP-21 WITH NUT & BOLT |
| 9 | STAY CLAMP FOR SP-23 WITH NUT & BOLT |
| 10 | Stay Clamp for SP-55 With Nut & Bolt |
| 11 | STAY CLAMP FOR SP-10 WITH NUT & BOLT |
| 12 | EARTH WIRE CLAMP FOR SP-23 WITHN/B |
| 13 | EARTH WIRE CLAMP FOR SP-21 WITHN/B |
| 14 | PP & CLAMP WITH N&B ST POLE SP-23 |
| 15 | SUSP.CLAMP WITH EYE HOOK ABC FOR SP-23 |
| 16 | SUSP.CLAMP WITH EYE HOOK ABC FOR SP-21 |
| 17 | Suspension Clamp With I Hook forABC SP10 |
| 18 | SERVICES (LABOUR) |
| 19 | REPAIRING OF PLINTH |
| 20 | CONSTRUCTION OF RETURNING WALL & PLINTH |
| 21 | ERECTION OF EARTHING ROD |
| 22 | EXCAVATION OF PIT FOR STAY SET |
| 23 | ERECTION OF LT STAY SET |
| 24 | ERECTION OF 11 KV STAY SET |
| 25 | ERECTION OF 33 KV STAY SET |
| 26 | GROUTING OF STAY SET |
| 27 | EXCAVATION OF PIT FOR POLE |
| 28 | ERECTION OF SINGLE SP-10 POLE |
| 29 | ERECTION OF SINGLE SP-21 POLE |
| 30 | ERECTION OF SINGLE SP-23 POLE |
| 31 | ERECTION OF SINGLE SP-55 POLE |
| 32 | ERECTION OF SP-23 DOUBLE POLE |
| 33 | ERECTION OF SP-55 DOUBLE POLE |
| 34 | ERECTION OF SP-33(11KV/33 KV) FOUR POLE |
| 35 | ERECTION OF SP-55(11KV/33 KV) FOUR POLE |
| 36 | GROUTING OF POLE |
| 37 | MUFFING OF POLE |
| 38 | DISMANTLING OF SP-33 FOUR POLE |
| 39 | DISMANTLING OF SP-55 FOUR POLE |
| 40 | DISMANTLING OF 11 KV LINE(WEASEL) |
| 41 | DISMANTLING OF 11 KV LINE(RABBIT) |
| 42 | DISMANTLING OF 11 KV LINE(RACCOON)) |
| 43 | FENCING OF DTR |
| 44 | FIXING OF TPMO |
| 45 | LAYING OF WEASEL CONDUCTOR IN HT LINE |
| 46 | LAYING OF RABBIT CONDUCTOR IN HT LINE |
| 47 | LAYING OF RACCOON CONDUCTOR IN HT LINE |
| 48 | GUARDING OF LT/11 KV LINE |
| 49 | LOPPING & CHOPPINGOF TREE BRANCHES |
| 50 | MAKING OF SECTION POLE |
| 51 | CARTAGE SP-10 POLE, 71-100 KM |
| 52 | CARTAGE SP-21/23 POLE, 71-100 KM |
| 53 | CARTAGE SP-55 POLE, 71-100 KM |
| 54 | CARTAGE OF PETTY MATERIAL,71-100 KM |
| 55 | HEADLOAD CARTAGE SP-10 POLE(1-3 KM) |
| 56 | HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM) |
| 57 | HEADLOAD CARTAGE SP-55 POLE(1-3 KM) |
| 58 | HEADLOAD CARTAGE OF MATERIAL(1-3 KM) |
| 59 | DISCONNECTION & RECONNECTIONOF CONsumer |
| 60 | DISMANTLING OF 33 KV LINE(PANTHER/DOG) |
| 61 | DISMANTLING OF AB CABLE |
| 62 | LAYING OF LT XLPE ABC 3X95+1X70 SQ.MM |
| 63 | LAYING OF LTXLPE ABC 3X25+25 SQ.MM |
| 64 | DISMAN OF LT XLPE ABC 3X95+1X70 SQ.MM |
| 65 | TIGHTENING OF STAY SET |
| 66 | RESAGGING OF LT AB CABLE |
| 67 | STRAIGHT OF TILTED POLES OF STP SP 10 |
| 68 | STRAIGHT OF TILTED POLES OF STP SP 21 |
| 69 | STRAIGHT OF TILTED POLES OF STP SP 23 |
| 70 | STRAIGHT OF TILTED POLES OF STP SP 55 |
| 71 | INST. OF DANGER BOARD/NUMBER PLATE |
| 72 | LAYING OF AB CABLE 1X16+25 MM |
| 73 | RESAG OF LOOSE 11KV LINE |
| 74 | SUPPLY FIXING&OPERATION OF 50W LED LIGHT |
| 75 | DISMANTLE OF EXITING TPMO/GO/ ISOLATOR |
| 76 | SAGGING OF 33 KV LINE Please Enable Macros to View BoQ information |