|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 2 | Supply of Stone boulder (nallah) nominal size 225mm |
| 3 | Dumping stone excluding cost of stones in Horizontal on level |
| 4 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 5 | Stone boulder (quarry) nominal size 225 mm |
| 6 | Supply of Wooven Crate mesh of 4mm wire Guage and 100mmx100mm mesh of standard Quality and Manufacture for resistance / Liability of crates which shall have to provide before start of work. The Supply including all means of carriage from supply source to actual site of work. (Complete Job). |
| 7 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m. |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 12 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars |
| 13 | Providing and fixing 3 inch dia PVC pipes including cutting, including all modes of carriage complete job. |
| 14 | Carriage of Material from available Sources to road site of work by Mechanical Transport including loading, unloading and stacking. Stone quarry for Avg. Lead of 19Kms |
| 15 | Stone Boulders for Avg. Lead of 10Kms |
| 16 | Stone Aggregate 40mm nominal size for Avg. lead of05 Kms |
| 17 | Stone Aggregate 20mm nominal size for Avg. lead of 05 Kms |
| 18 | Sand for Avg. lead of 10 Kms |
| 19 | Cement & Steel from open Market for an avg lead of 03kms |
| 20 | Carriage of Material from road site to actual site of work by manual labour including loading, unloading and stacking avg lead 50m.Stone quarry and stone boulders |
| 21 | Stone Aggregate 40mm |
| 22 | Stone Aggregate 20mm |
| 23 | Cement |
| 24 | Steel Please Enable Macros to View BoQ information |