| 1 | Earth work in excavation in open area, STP, WTP, Pumping station with mechanical means including dressing of sides and ramming of bottoms, including getting out the excavated material, disposal of excavated material lead upto 1000m at suitable site as per as per drawing and as per direction of Engineer. (Measurements for payment to be done as per standard drawings). In all kind of soil |
| 2 | Upto 3.0 m depth |
| 3 | Above 3.0 m and upto 6.0 m depth |
| 4 | Above 6.0 m and upto 9.0 m depth |
| 5 | Carriage of Materials by mechanical transport including loading, unloading and stacking Sand, bazri, ballast, kanka1 km |
| 6 | SINGLEFLATBRICKLININGWITH250MICRONLDPEFILM:-Preparing surface levelled&dressed toproper slope& layingover it on sandproperlyrammedandwateredin2Layersof5cmeach.Providingand laying 250micron LDPE film as per ISS:2501984includingoverlappingonthefinishedsurfaceofcompacted sand.OverLDPEfilm15mmthickcementsandmortar1:3shallbeprovidedandlaidwhichshallbecured properly.OverthebasemortarsinglelayerIst classbrickliningin cementsandmortar1:3shallbeprovidedwithjointsnotmorethan8mmwide and curing shall be done for 14 days. This also includes providing weedicides&anti-termite treatment, completework as per technicalspecifications |
| 7 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) |
| 8 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc |
| 9 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 10 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand |
| 11 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 12 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand) |
| 13 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 14 | Supplying and fixing of GI chain link fencing of required width in mesh including strengthening with 2 mm dia GI wire/ G.I. staples/ G.I.U-nails/ nuts bolts with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete 30cmx30cmx60cm, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only etc complete as required and as per direction of Engineer-in-charge. Mesh size 100mm x 100mm made of GI wire 3.15mm dia Please Enable Macros to View BoQ information |