| 1 | Double under reamed pile foundation with R.C.C (M20) using 12mm chips including cost of bore holes but excluding cost of rod with all complete (250mm dia & 6m long pile ) As per Direction of Eic |
| 2 | Earth work in excavation of foundation in all kinds of soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within 50 m lead clear from work site including cost of all labour, T & P, cess etc. all taxes complete . |
| 3 | Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess etc all taxes of all materials & cost of all labour complete |
| 4 | C.C. ( 1 : 4: 8) using 40 mm size (H.B) metal free from weathered skin & all foreign materials including lowering, laying the concrete, watering and curing etc. and including cost , conveyance to site , royalty , cess etc. all taxes of all materials & cost of all labour complete . |
| 5 | R.C.C. work in M 20 grade of concrete using 20 mm & down graded size hg chips including hoisting & laying the concrete,watering and curing etc.complete to required levels laid in layer including cost,conveyance to site , royalty , cess etc. all taxes of all materials & cost of all labour complete As per Direction of Eic. |
| 6 | Rigid & smooth centering & shuttering for RCC works including false works and dismantling them after casting including cost of materials complete in ground floor |
| 7 | Canal |
| 8 | Retain Wall |
| 9 | RCC beams ,Coulmns |
| 10 | Suplying , fitting & placing in position uncoated HYSD bar reinforcement for RCC work including cutting ,bending ,binding & placing in position including cost & conveyance to site,cess etc. all taxes of MS/ TS Rod & binding wire 18to 20 gauge etc.all complete . |
| 11 | Brick masonry in C.M ( 1 : 6 ) using F.A. bricks from any approved quarry & watering and curing etc. including cost , conveyance to site , royalty , cess etc. all taxes of all materials & cost of all labour completeIn F/P |
| 12 | In Superstructure |
| 13 | 12 mm thick CP (1 : 6) over brick masonry after racking out the joints & watering and curing etc. including cost , conveyance, royalty, cess etc all taxes all complete . |
| 14 | White washing with shell lime two coat with cost of all materials and cost of all labour,cess etc.all complete |
| 15 | Wall painting 2 coats to walls with weather seal proof paint of any approved shade on New work after cleaning the surface including watering & curing etc. complete including cost of weather coat & cost of all labour and cess with T & P. required for the works etc. all complete |
| 16 | Borrow of excavated Earth for filling away from sites as per the direction of Engg-in-charge. |
| 17 | Supplying all labour , T & P , etc. for preparation of Display Board including painting , writing & fixed in position at proper place & Provision Photto graphs at different stage of execution of the work including cost of all materials, labour cess etc. & cost of all labour complete . Please Enable Macros to View BoQ information |