|
| 1 | Execution of Initial Visit Fee | Execution of Initial Visit Fee as per the requirement for initiating the AMC |
| 2 | Servicing of Inverter AC | Servicing of Inverter AC with foam & power jet of Indoor and Outdoor unit |
| 3 | Replacement of new compressor | Replacement of new compressor of 1 point 5 TR split AC |
| 4 | Replacement of outdoor PCB | Replacement of Outdoor Inverter PCB |
| 5 | Replacement of indoor PCB | Replacement of Indoor display PCB |
| 6 | Full Gas Charging | Full Gas Charging Includes leak testing & vacuumizing |
| 7 | IDU Fan Motor | IDU Fan Motor includes capacitor or speed sensors |
| 8 | ODU Fan Motor | ODU Fan Motor includes capacitor or speed sensors |
| 9 | Capacitor | Capacitor 25 to 60 mfd |
| 10 | Expansion Valve | Expansion Valve or Capillary Assembly |
| 11 | Copper Pipe | Copper pipe of standard quality both pipes with Insulation |
| 12 | Drainage Pipe | Drainage Pipe Heavy Duty |
| 13 | Runner | Runner of split AC |
| 14 | Repairing of Indoor PCB | Repairing of Inverter Indoor PCB |
| 15 | Repairing of Outdoor PCB | Repairing of Inverter Outdoor PCB |
| 16 | Wall mounting kit | Wall or Floor mounting kit with fastner set for Outdoor unit |
| 17 | Service valve | Service valve complete set |
| 18 | Temperature sensor | Indoor Temperature Sensor |
| 19 | MCB | SP MCB 6 to 32 A |
| 20 | Dismentaling and Shifting of Split AC | Dismentaling and Shifting of Split Air Conditioner within premises |
| 21 | Reinstallation charges of split AC | Reinstallation charges of split air conditioner |
| 22 | Supply and fixing copper conductor cable | Supply and fixing of 3core 2 point 5 Sqmm PVC insulated & sheathed Cu conductor wire |
| 23 | Timmer for cyclic operation of AC units | Timmer for cyclic operation of AC units operable on whole current of 20 to 30 A operating voltage 90V AC to 440 V AC |
| 24 | Pdg AMC of Split AC | Providing Annual Comprehensive Maintenance of 1 point 5 TR Split AC Inverter type |