| 1 | Cleaning thick bushes and thorny jungle without uprooting. labour,material and T & P etc as per direction of Engineer in charge. |
| 2 | Silt clearance/trench digging in wetted drain including all lifts and leads , including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction required for proper completion of work or as per direction of Engineer in charge. |
| 3 | Silt clearance/trench digging in under water in drain including all lifts and leads, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction required for proper completion of work or as per direction of Engineer in charge. |
| 4 | Silt clearance/trench digging in under water in drain with for slush and lehel including all lifts and leads , including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compactionrequired for proper completion of work or as per direction of Engineer in charge. |
| 5 | Removing sewar and jalkumbhi from main canal branches & distributaries, escapes & its disposal at toe of bank & destroying by burning required for proper completion of work or as per direction of Engineer in charge. |
| 6 | Plain cement concrete in M10 (1:3:6) in with stone ballast including cost of material, labour and t&p etc complete required for proper completion of work or as per direction of Engineer in charge. |
| 7 | Laying Cement Concrete M20 (1:1.5:3) Including all cost of material, labour, T&P etc. omplete required for proper completion of work or as per direction of Engineer in charge. |
| 8 | M-150 Brick work in 1:4 cement and sand mortar including all Lifts and leads of material including cost of all labour,material and T & P etc required for proper completion of work or as per direction of Engineer in charge. |
| 9 | Random rubble masonary work in 1:4 with cement , coarse sand with hard stone in toe wall & sleeper including cost of all material, labour and T&P etc. complete required for proper completion of work or as per direction of Engineer in charge. |
| 10 | Laying Shingle/Grit as filter 4 to 20 mm below pitching slope including all cost of material , labour , T & P etc required for proper completion of work or as per direction of Engineer in charge. |
| 11 | Laying Boulder pitching 20 to 40 kg. weight including all cost of material , labour , T & P etc. required for proper completion of work or as per direction of Engineer in charge. |
| 12 | Finishing walls with Acrylic Smooth exterior paint of required shade Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface as required including cost of all material, labour and T&P etc. required for proper completion of work or as per direction of Engineer in charge. Please Enable Macros to View BoQ information |