| 1 | Supply and fixing of Mast Nut, Bolt & templates suitable for 30 Mtr High mast. Complete in all respects as per directiion of E/I. |
| 2 | Supply and fixing of Winch Machine assembly suitable for 30 Mtr High mast. Complete in all respects as per directiion of E/I. |
| 3 | Supply and fixing of SS Rope Wire 16Mtr/30 Mtr High mast. Complete in all respects as per directiion of E/I. (AOR) |
| 4 | Supply and fixing of Lantern Carriage made of 2.5\\" outer dia G.I. Pipe Class B heavy duty for mounting the luminaries suitable for 16Mtr/30 Mtr High mast. Complete in all respects as per directiion of E/I. |
| 5 | Supply and fixing of Head Frame with Pulley suitable for 16Mtr/30 Mtr High mast. Complete in all respects as per directiion of E/I. |
| 6 | Supply and fixing of Window Door/Cover size as per 16Mtr/30 Mtr High mast made of 3mm thick MS Sheet with 2 Nos heavy duty lock shutter type incl. hinged. Complete in all respects as per directiion of E/I. |
| 7 | Supply and fixing of Aviation Light suitable for 16Mtr/30 Mtr High mast. Complete in all respects as per directiion of E/I. |
| 8 | Supply and fixing of MS Lighting arrestor rod suitable for 16Mtr/30 Mtr High Mast. Complete in all respects as per directiion of E/I. |
| 9 | Supply and fixing of fibre Junction Box suitable for 16Mtr/30 Mtr High mast. Complete in all respects as per directiion of E/I. |
| 10 | Supply and fixing of Mast Nut, Bolt & templates suitable for 16 Mtr High mast. Complete in all respects as per directiion of E/I. |
| 11 | Supply and fixing of Winch Machine suitable for 16 Mtr High mast. Complete in all respects as per directiion of E/I. |
| 12 | Dismantling of 30 Mtr Height High Mast with the help of Crane/Hydra and required labour T&P etc. Complete in all respect . As per direction of E/I. |
| 13 | Fixing of 30 Mtr Height High Mast with the help of Crane/Hydra and required labour T&P etc. on existing foundation. Complete in all respect . As per direction of E/I. |
| 14 | Dismantling of 16 Mtr Height High Mast with the help of Crane/Hydra and required labour T&P etc. Complete in all respect . As per direction of E/I. |
| 15 | Fixing of 16 Mtr Height High Mast with the help of Crane/Hydra and required labour T&P etc. on existing foundation. Complete in all respect . As per direction of E/I. |
| 16 | Supplying and laying of aluminium conductor PVC insulated armoured, served, sheathed cable 1100 Volts grade at a depth of 750 mm. below ground level over a cushion of 75 mm. thick sand alround and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. Clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respects. the armouring of the cable shall be properly connected with the earth conductor by clamps etc. ( KEI, Havell's/Polycab make) |
| 17 | (a) 16 Sq.mm. x 4Core (PS No. 501) |
| 18 | S/F of cable Lug(socket) to the cable lead. Complete in all respects as per PS No. 504 |
| 19 | a)- 16 sq. mm |
| 20 | Supply and burring of Safe Earthing Electrode T-19 (Hot Dip Galvanized), Length up to 3000mm, outer pipe 50mm, inner pipe 25, terminal Dia 12 mm, outer GI pipe of 16 swg and inner GI pipe of 12 swg with Hot Dip Galvanization up to 100 micron filled with crystalline conductive mixture (CCM) having anti corrosive & conductive property with 50 kgs activated soil (BFC) capable of reducing the soil resistivity with good mixture of retaining capacity along with 30cm square C.I. frame with hinged cover & masonry husing (from electrode terminal to switch board, cost of 25 x 3 G.I . strip will be extra) Make: As approved in U.P. P.W.D., & C.P.R.I. Certified.(P.S. No 725B) |
| 21 | Supply and laying of 25mm x 3mm G.I. strip from earth electrode directly in the ground as required complete in all respect. .(P.S. No 716) |
| 22 | Supply and fixing of 25A Amp TPN capacity of automatic street light cubical control panel painted with anti corrosive alkali and acid proof paint crossing of time switch TSO 100 series with contractors, HRC fuse, isolating swtich metering instrument & instrument box with CTs etc. in case of TPN, Complete in all respects. as per PS No. 807e |
| 23 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (AOR) |
| 24 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level-a)- 1:3:6 (1 Cement : 4 coarse sand(zone-III) : 8 graded stone aggregate 40 mm nominal size).(AOR) |
| 25 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). (AOR) |
| 26 | Centering and shuttering including strutting, propping etc. and removal of form for : -a)-Foundations, footings, Bases of columns, etc. for mass concrete (AOR) |
| 27 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. -a)-Cold twisted bars. (AOR) |
| 28 | Hiring charges of Mobile Hydraulic Crane 35 tonne capacirty (173HP) including fule and other T & P for shifting of Pole from One site to other site as per direction of E/I. |
| 29 | Repairing of 11KV fuse wire/Jumper i/c supply and fixing of required size conductor, fuse wire of 11KV Line/DP structure of Transformer by takinng shutdown from UPPCL Department with all safety instruments like-safety belt, Gloves, shoes and other necessary items complete including all taxes. |
| 30 | Supply and laying 2.5 Sqmm 4 Core PVC insulated copper conductor control cable for Highmast Pole complete in all respect as per direction of E/I. |
| 31 | Electrician for lowering and Rising of Highmast pole and other work such as greasing, oiling in winch machine and rectify the complaints as per given by E/I. . |
| 32 | Supply and fixing of factory wired integral LED flood light uminaires with die cast aluminium housing built with dirver set suitable for 140 to 150 Watt. Confirming to IP 66 protection complete in all respect.Ps.No.1454 CAT-AAA ( 5 years warranty) Make LT/Bajaj/Havells/Crompton/Philips/Wipro |
| 33 | Supply and fixing Pole bus bar support connector 4 way with backsheet i/c connection of cable complete in all respect. Please Enable Macros to View BoQ information |