| 1 | Lobour for site clearance do…….do….E/I |
| 2 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. xtra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B |
| 3 | Providing stone dust filling in road do……do…..E/I |
| 4 | Supplying and laying (properly as per design and drawing)rip-rap with 'good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all cornplete as per specification and direction of E/|. |
| 5 | Providing P.C.C.M 200 in nominal mix of (1:1.5:3) in foundation withapproved quality of stone chips 20 mm to 6 mm size graded andclean coarse sancl of F M.2 5 to 3 including screening shutteringmixing cement concrete in mixer and placrng in positionlvibrating, strrking, curing, taxes and royalty all complete as per specification and direction of Engineer-in-charge |
| 6 | Filling in foundation trenches and plinth in layers notexceeding 150 mm thick wellwatered, rammed, fully compacted and finedressed with earth obtained after cutting withtn a lead of50 ltl and liftof 1.5 M all complete as per buildingspecification and direction of E/l |
| 7 | Centring and shuttering including strutting proping etc removal of form for all complete as per buiding specification and direction of E/I |
| 8 | Add Carrige cost of materials from source to W/S , Boulder 20 Km |
| 9 | Stone Chips |
| 10 | Stone Dust |
| 11 | Cement |
| 12 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. xtra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B |
| 13 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) |
| 14 | Supplying and laying (properly as per design and drawing)rip-rap with 'good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all cornplete as per specification and direction of E/|. |
| 15 | Providing P.C.C.M 200 in nominal mix of (1:1.5:3) in foundation withapproved quality of stone chips 20 mm to 6 mm size graded andclean coarse sancl of F M.2 5 to 3 including screening shutteringmixing cement concrete in mixer and placrng in positionlvibrating, strrking, curing, taxes and royalty all complete as per specification and direction of Engineer-in-charge |
| 16 | Providing randam rubble stone masonry in CM (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I. |
| 17 | Providingrandamrubblestonemasonryin CM(1:4) insuperstructureincludingcost of screening of materials scaffolding rakingout jointsto20mmdepth,curing taxes and royalty all complete as per building specification and direction of E/I |
| 18 | Providing 25mm thickcement plaster (1:4) with clean coarse sand of F.M 1.5 ncluding screening curing with all lead and left of water scaffolding taxes and royalty all complete job as per Specification and direction E/I |
| 19 | Providing 1.5mm cement punning including curing, carriage of water with all leads and lift as per building specification and direction of E/I |
| 20 | Add Carrige cost of materials from source to W/S , Boulder 20 Km |
| 21 | Stone Chips |
| 22 | Cement |
| 23 | add S/B & PHOTOGRAPHY |
| 24 | Add . 18 % GST |
| 25 | add 1 % labour cess Please Enable Macros to View BoQ information |