|
| 1 | Demolition of cement concrete (unreinforced) in ground floor and paving not exceeding 15 cm thick ( Below or above ground) complete all as specified and as directed. |
| 2 | Demolition of cement concrete (unreinforced) any description and in any position not otherwise specifically provided for complete all as specified and as directed. |
| 3 | M&L for PCC 1:4:8, type D2 (using 40mm graded crushed stone aggregate) as in foundation, filling and mass concrete etc. complete all as specified and as directed. |
| 4 | M&L for PCC 1:3:6, type C2 (using 40mm graded crushed stone aggregate) as in foundation, filling and mass concrete etc. complete all as specified and as directed. |
| 5 | M & L for PCC 1:2:4, type B1 (using 20 mm graded stone aggregate) as in surface channel or drain including necessary form work complete all as specified and as directed. |
| 6 | M&L for Plain Cement Concrete 1:2:4 type B-1 (12.5 mm graded aggregate) as in coping, water troughs and the like including weathering, slightly roundede or chamfered angles , throating and including necessary formwork (stright or curve), complete all as specified and as directed. |
| 7 | M&L for extra for forming fair finished drain or channel 30cm inner girth in cement concrete, using extra cement, including forms, moulds, mitred/stopped ends etc. complete all as specified and as directed. |
| 8 | Demolition of brick or stone masonry work built in cement mortar including all quoins, arches, pillars etc complete all as specified and as directed. |
| 9 | M&L for walling of random rubble, uncoursed, well bonded, bedded and solidly hearted, built in CM 1:6 complete all as specified and as directed. |
| 10 | All as per item 9 here-in-before but using except stone obtain from item No 8 complete all as specified and as directed. |
| 11 | M&L For extra over stone walling for hammer dressing to face stones and dressing of face beds and joints, as specified, of random rubble walling, using 20mm thick Granite or Trap stonee complete all as specified and as directed. |
| 12 | M&L for raised pointing to random or ploygonal rubble, uncoursed or brought upto courses in cement mortar 1:4 complete all as specified and as directed. Please Enable Macros to View BoQ information |