| 1 | Removal of land slide in hilly area in ordinary rock not requiring blasting by mechnical means including cutting and trimming of slops and disposal of cut material with in lif upto 1.5m and lead upto 1000m as per technical specification 302.3.5 and 1611. |
| 2 | Earthwork in excavation for structures as per as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. with in all leads and lifts as per directed by the Engineer-in-Change |
| 3 | Plain/reinforced cement concrete (1:3:6) in open foundation complete as per drawings and technical specification Clauses 802, 803, 1202 and 1203 within all leads and lifts as per directions of Engineer in charge |
| 4 | Plain/reinforced cement concrete (1:4:8) in open foundation complete as per drawings and technical specification Clauses 802, 803, 1202 and 1203 within all leads and lifts as per directions of Engineer in charge |
| 5 | Providing weephole in brick masonary /stone masonary ,plain/ rainforced concrate abutment wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slpoe of 1 (V):20(H) towards drawing face complete as per drawings and technical specification Clauses614,709,1204.3.7.as directed by the Engineer-in-Change |
| 6 | WBM Grading 2 :- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Machanical Means |
| 7 | WBM Grading 3 :-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Machanical Means |
| 8 | Tack Coat Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributer @0.275 kg/sqm on prepared surface of granular surface treated with primer cleaned with hydraulic broom as per Technical specification clause 503 |
| 9 | Prime Coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 10 | Bitumenious Concrete:-Providing and laying 30 mm thick bitumenious concretewith 100-120 TPH capacity batchtype computrised HMP producing an avarage out put oof 75 tonne per hour using crushed aggrigate of specified grading II premixed with VG-10 bitumenious binder as per job mix formula with minimum binder concrete of 5.4%to 5.6% of total weight of mix and filler,transportingthe hot mix to work site laying with hydro static paver finisher with sensor control to the required grade level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the disered compction as per MORTH & Hspecification clause No. 509 complete in all respect including all leads and lifts as per directions of Engineer in Charge Please Enable Macros to View BoQ information |