|
| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR SUPPLY, ERECTION & COMMISSIONING OF LT ACB 800 AMP. AND LT MCCB 250 AMP. FOR DTRS UNDER 33/11 KV SUB-STATION, CHALANG, UNDER EDSD, IT PARK UNDER EDD, RAIPUR AGAINST E-TENDER SPECIFICATION NO.01/EDCRDDUN/2026-27 Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Qty Rate Amount Part [A] (Supply Portion) |
| 2 | MS Half Clamp for LT DB for ST Pole SP-23/33 |
| 3 | LT XLPE Cable 1x240 sqmm. |
| 4 | LT XLPE Cable 1x400 sqmm. |
| 5 | LT XLPE Cable 1x95 sqmm. |
| 6 | Providing 250 Amp., 35 KA , MF 4 Pole with Adjustable Microprocessor Relay with earth fault digital Moulded case circuit breaker for 100 Kva T/F with pannel |
| 7 | Providing Air Circuit Breaker type complete LT Distribution board for 250/400 KVA DTR fitted with 01 No. 800 Amp CT including microprocessor release IPR-1 Fixed type (4 Pole as per IS: 13947-2 & IEC: 60947-2) with panel and mounting structure as per specification |
| 8 | Aluminium Crimping Type Lugs 400 sqmm. |
| 9 | Aluminium Crimping Type Lugs 240 sqmm. |
| 10 | Aluminium Lugs 95 sqmm. Total - Part [A] 0.0 Part [B] (Labour Portion) |
| 11 | Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I. Strip (to be supplied by contractor ) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm. |
| 12 | Earthing with M.S. Earth rod of 2.5 meter long by hammering of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual. |
| 13 | Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends (distance 0-20 Km) |
| 14 | Head load cartage of small material (distance 0-1 Km) |
| 15 | Dismantling of LT PVC Cable of DTR |
| 16 | Back Cartage of Petty Material, 0-20 Km. |
| 17 | Installation of LT ACB Pannel complete in all respect i.e. disconnection of existing cable from DTR terminal and metering cubucals, fixing of new additional cable in ACB LT Distribution board connecting DTR metering complete, testing and commissioning of ACB connection using all lugs pf proper size lugs will be provided by supplier as per required on site and narrated by engineer in change of work. |
| 18 | AMC of ACB for first year after completion of one year warranty period @3% of the cost of ACB |
| 19 | AMC of ACB for second year after completion of one year warranty period @4% of the cost of ACB |
| 20 | Cartage & Head load cartage of ACB & MCCB etc. |
| 21 | AMC of MCCB for first year after completion of one year warranty period @3% of the cost of MCCB |
| 22 | AMC of MCCB for second year after completion of one year warranty period @4% of the cost of MCCB |
| 23 | Installation of Digital Moulded Case breaker complete on the pole with fixing of 2 No. M.S. Angle with the help of M.S. clamp in all respects i.e. Disconnection of existing cable from DTR terminal and fixing of new additional cable in MCCB connectiing DTR complete, testing and comissioning of MCCB connection using Al. lugs of proper size clamps as per required site and narrated by Engineer encharge of the work. |
| 24 | Laying & Sagging of LT XLPE cable 1x400 sqmm. |
| 25 | Laying & Sagging of LT XLPE cable 1x240 sqmm. |
| 26 | Cartage & Head load cartage of ACB etc. |
| 27 | Laying of LT XLPE cable 1x95 sqmm. Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |