|
| 1 | Demolation of Slab above ground level and stacking the unserviceable material complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 2 | Extraction of silt removal of debris ,slip,boulders and rocky portion requiring blasting upto a distance of 20 metre disposing of unserviceable materials, and neatly dressing the surface complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 3 | Excavation In foundations, trenches etc. in earth work,lift upto 1.50 mts stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm layers when required in to plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in lead of 20 metres complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 4 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of centring and shuttering in foundation and plinth complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 5 | Providing form work with steel pates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies in all heights of propping and centring below supporting floor to ceiling upto all height and removal of the same for insitu-reinforced concrete and plain concrete work in :- |
| 6 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like.complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 7 | Columns,pillars,posts and struts :- Square,rectangular, polygonal in plan complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 8 | Sides and sofits of beams, beam haunching, cantilever breasumer and lintles not exceding 1 mtr in depth in all heights from floor complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 9 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like floors etc. upto 200mm in thickness complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 10 | Edges of slab and breaks in floors and walles complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 11 | Providing Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 12 | Providing and laying cement concrete 1:1.5:3(1cement:1.5sand:3 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :-- |
| 13 | Foundation, footing, basic of columns and the like mas concrete complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 14 | Wall any thickness but not less than 0.10 mtr. Thickness attached pilasters, buttresses, plinth and string courses etc. fro top of foundatio level upto floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 15 | Providing and laying cement concrete 1:2:4 (1cement:2sand:4 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in :- |
| 16 | Foundation , footing, bases of columns and the like & mass concrete.complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge |
| 17 | Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 18 | Columns, Piller, posts and struts :- Square, rectangular, polygonal in plan complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 19 | Suspended floors,roofs landing shelves and their supports balconies beams,girders and cantilevers upto floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 20 | Providing and laying cement concrete 1:5:10 (1cement:5sand: 10graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining wall/breast wall, the size of plums shall usually 150mm to 300mm as per HPWD / JSV specification complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 21 | Random reubble masonry / polygonal rubble masonry (uncoursed / brough to courses) with hard stone of approved guality in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement : 6 sand : 12 graded stone aggregate 40 mm nominal size) plinth in level in cement mortor 1:6 (1 cement :6 sand) complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 22 | Brick work using common burnt clay building bricks inforcement plinth, insusper structure above plinth level upto floor shevel (2nd class bricks) complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 23 | Steel work welded in build up section, of gate and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paintin grating, framed guard bars ladders, railing brackedts and similar works complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 24 | Hirmachi colour wash on undecorated wall surfaces two coats to give an even shade including throughly brooming the surface to remove all dirt dust mortar dirt and other foreign matter complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 25 | Applying a priming coat over new steel & other metalled surface & i/c preparing the surface by thoroughly clearing oil, grease & durt & other forgin matter scoured with wire wire brushes fine steel wool srapers & sand paper complete (with ready mixed priming paint bushing red lead red oxide/Zinc oxide chrome) complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . |
| 26 | Applying a priming coat over new steel & other metalled surface & i/c preparing the surface by thoroughly clearing oil, grease & durt & other forgin matter scoured with wire wire brushes fine steel wool srapers & sand paper complete (with ready mixed priming paint bushing red lead red oxide/Zinc oxide chrome) complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . Please Enable Macros to View BoQ information |