| 1 | Providing and laying cement concrete 1:1.5:3 (1cement :1.5Sand: 3 graded stone aggregate 20 mm N/S) and curing complete excluding cost of form work and reinforcement for Rainforced concrete work in:- |
| 2 | Foundation and Plinth with in all leads and lifts as per the direction of the Engineer in Charge. |
| 3 | Walls (Any thickness) attached pillasters, pillasters, buttresses, beam girder and contilevers upto floor two level with in all leads and lifts as per the direction of the Engineer in Charge. |
| 4 | Suspended Floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever up to floor two level with in all leads and lifts as per the direction of the Engineer - in - Charge. |
| 5 | Providing and fixing of mild steel/ tor steel reinfircement for rainforced concrete work I/C bending, binding and placing in position complete upto floor two level with in all leads and lifts as per the direction of the Engineer in Charge. |
| 6 | Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge. |
| 7 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like with in all leads aand lifts as per the direction of the Engineer in Charge. |
| 8 | Flat surfaces such as soffits and suspended floors, roofs landing and the like: Floors etc up to 200 mm in thickness with in all leads aand lifts as per the direction of the Engineer in Charge. |
| 9 | 10 mm thick cement plaster in single coat on fair sides of brick/concrete/ stone walls for interior plastering upto floor two level including arises internal rounded angles not exceeding 80mm girth and finished even smooth in cm 1:3 (1cement: 3sand) within all leads and lifts and as directed by the Engineer-in-charge. |
| 10 | White washing with lime on undecorated wall surfaces two coats to give an even shade including throughly brooming the surface to remove all dirt dust mortar dirt and other foreign matter. |
| 11 | Removal of slips in all kinds of soil( including saturated soil but excluding boulders & rock protion req. belasting) up to a distance of 20mtrs. Disposing unserviceable material and neatly dressing the surface.with in all leads and lifts as directed by the Engineer-in-charge. |
| 12 | Excavation in foundations , trenches etc., in earth work , lift up to 1.50 metres. Stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. (fifteen centimetres) layers , when required in to plinth and sides of foundations etc., conslolidating each of the disposited layer by ramming and watering and then disposing off all excavated soil as directed with in the load of 20 mtrs. Pick and Jumper work etc. complete as per the direction of the Engineer - in - Charge. |
| 13 | Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts as per the directions of the Engineer in charge. |
| 14 | Providing andf laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40 mm nominal size ) with 15% plum concrete and curing complete excluding cost of form work in retaining walls/breast walls,the size of plums shall usually be 150 mm to 300 mm as per H.P.P.W.D Specification. |
| 15 | Boulder filling behind R/wall & B/wall within all leads and lifts and as directed by the Engineer-in-charge. |
| 16 | Providing and fixing of Finolex pipe 50mm dia. In R/Wall including all re-fitting i/e elbowa, sockets etc. with in all leads aand lifts as per the direction of the Engineer in Charge. Please Enable Macros to View BoQ information |