|
| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Chief Executive Officer, Mohanpur Municipal Council. Name of Work: Const.of R.C.C Retaining wall from Agt-Simna road to end of Ariti Ghosh land of Ward no.02 under Mohanpur Municipal Council during the year of 2025-26. DNIeT No: 43/MMC/MNP/DNIeT/2025-26, Dt. / /2025 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Name of work Item Code / Make Quantity Units Estimated Rate in Rs. Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Estimated cost in Rs. TOTAL AMOUNT In Rs. TOTAL AMOUNT In Words |
| 2 | Excavation for Structures(A) .Without dewatering.Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. (A).With out dewatering. I.Ordinary soil. (i).Upto 3mtr depth. |
| 3 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. 1.Sand filling. |
| 4 | Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement) 1.P.C.C. grade M-10(using jhama brick aggregate) (i).Nominal mix 1:3:6 |
| 5 | Plain/reinforced cement concrete in substructure complete including formwork as per drawings & MoRD technical specification Clauses 802, 804, 805, 806, 807, 900, 1202 & 1204. (including centering, shuttering, staging etc. but excluding reinforcement) R.C.C grade M-20 (1:2:4) (Nominal mix) upto 5 m height |
| 6 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar in substructure complete as per drawings & MoRD technical specification Clauses 1002, 1005, 1010 and 1202. |
| 7 | Construction of Embankment with Material Obtained from Borrow Pits. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. |
| 8 | Providing & laying filter media with jhama brick aggregates asper specification to a thickness of not lessthan 600mm with smaller size towards the soil & bigger size to wards the wall & providing over then tire surface be hind abutment, wingwall, return wall to the fullheight, compactedtofirm condition complete as per drawing andMoRD technical specification clause 1204.3.8. |
| 9 | Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wingwall, returnwall with 100mm dia AC pipe PVCpipe (110mm OD of 6.0 kg/cm2 pressure) extending through the fullwid the of the structures with slope of 1(V):20(H) toward sdrawing face complete as per drawing and MoRD technical specification clauses 614, 709, 1204.3.7. Total in Figures 1480505.0 1480505.0 INR Fourteen Lakh Eighty Thousand Five Hundred & Five Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |