| 1 | PJPL cable laying and associated works |
| 2 | CABLE TRENCH: Excavation in unpaved areas of earth in work sites for conventional cable trenches for a depth upto 1.5 metres inclu ding shoring, strutting etc. (if necessary), backfilling the trench, job complete in all respects, including all labour and ma terials complete as per drawings, specification and directions of Site Engineer / Engineer-in-Charge |
| 3 | WBM Road/concrete breaking for cable trenches including required shoring strutting etc., and repairing of the road/dyke to origina l condition and disposing off excess materials (within the work site) job complete in all respects including the cost of labou r, tools, materials, load, lift hire charges of equipments, if any, complete as per drawings, specification and directions of Site Engineer / Engineer-in-Charge. |
| 4 | Cable Laying - Laying of all type of cables LT (PVC / XLPE / Armoured/Unarmoured/Power/ Control/ Signalling) in trenches, in cabl e racks, in trays, in protective pipes, poles, columns, in conduits, in panels and on structures etc.; including the supply and inst allation of all required materials such as fixing clamps, screws, cable straps, tags, etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and panels) complete in all respect, including cost of all la bour, tools, consumable materials, etc. and cutting the cables in required lengths as per drawings, specification and directions o f Site Engineer / Engineer-in-Charge: |
| 5 | Power cables LT : OD above 20 mm and upto 40 mm |
| 6 | GI CABLE TRAY: Supply, installation & fixing of prefabricated perforated GI cable trays with tray cover of width 150 mm, 300 mm, 450 mm & 600 mm as per site requirement for laying of cables with standard rung spacings. Load for support span of 2.5 meter as 30, 60, 75 & 90 (in Kg/Mtr) respectively with concentric static load as 70 Kg at the centre, with materials, labour, tools and tackles, con sumables etc , as per drawings, specification and directions of Site Engineer / Engineer-in-Charge. |
| 7 | SAND FILLING: Supplying and spreading of approved quality fine dry river sand in cable trenches including the cost of all material, transport, load and lift charges, labour, tools and tackles, consumables etc , as per drawings, specification and directions of S ite Engineer / Engineer-in-Charge |
| 8 | BRICK SOLING: Supply and laying of approved quality 75 mm thick second class brick flat soling with sand filling in the interstices, in cable trenches for protectionincluding the cost of all brick and sand, labour, load and lift charges , tools and tackles etc , a s per drawings, specification and directions of Site Engineer / Engineer-in-Charge. |
| 9 | CABLE MARKER: Supply, erection & installation of MS cable markers, including excavation, installation of the markers, cement concret e grouting, backfilling, materials, labour, tools and tackles, consumables etc , as per drawings, specification and directions of Site Engineer / Engineer-in-Charge. |
| 10 | EARTH STRIP / WIRE / ROPE / CABLE - Supply, installing and testing of earthing strip/wire/rope/cable for completely making the eart hing grid system by supplying, laying the GI / Cu strip and making all the necessary welding joints, connecting to the earthing electrodes and existing earthing grid etc., complete as per drawings, specifications and directions of the Site engineer/Engineer -in-charge, including the cost of all labour, tools, materials, etc. complete in all respect: |
| 11 | 50 mm X 6 mm G.I. earthing strip |
| 12 | STEEL STRUCTURAL WORKS: Supply, fabrication, erection, installation of steel structural works of any type and shape such as cable ra ks, cable trays, push button control posts etc., as required job complete in all respects including the cost of all labour, tools, material etc., complete.and as per specifications and directions of site engineer/ Engineer-in-Charge. |
| 13 | Supply, erection & installation of cable conduits made up of GI pipes of medium class 'B' subject to owner's approval in trenches (already made), on walls, concrete structure etc., including supply and installation of all the necessary pipe fittings such as bends, sockets, elbows, tees etc., bending, threading, binding, clamping, providings, spacers, plugs, packings, bushings etc., as required Job complete in all respects including the cost of all labour, tools, material etc. and as per specifications and directions of site engineer / Engineer-in-Charge: 50mm Please Enable Macros to View BoQ information |