| 1 | NS Item |
| 2 | Maintanace of LED street light points 90W to 200Winstalled on 9Mtr Octagonal Pole and 12.5Mtr Long High Mast Pole including all the labours, TandP and petty materials i.e. PVC Tape, Screws, Wires etc. required to complete the work upto the entire satisfaction of E-I-C of the work. The rates are including ON/OFF operation of street light system. |
| 3 | Timer Switch |
| 4 | S/E of 63 Amps connection plate for incoming andoutgoing cabling in existing Panel/High Mast/pole/bracket/pipe to be fitted with connector fixed on Bakelite sheet complete with nut and bolts. |
| 5 | 200 watt LED Flood light fittings |
| 6 | S/E of FRLS PVC insulated and round sheathed 2.5Sqmm x 3 core, bright annealed copper conductor heavy duty industrial flexible cable for voltage grade 1100 volts confirming to IS: 694-2010 complete in all respect up to entire satisfaction of the Engineer-in-Charge of the work. Make: Grandlay/Polycab/Havells. |
| 7 | Dismantling and Credit of 72W LED Street Light Ftg. |
| 8 | Construction of Manhole (Hoddi) for cable havinginternal size 450mmX450mmX950mm made out of first class brick with 1:4 cement mortar ratio duly 12mm thick plaster with floating coat of cement sand ratio 1:4, 1 mm thick cement rendering coat on plaster duly covered with pre cast RCC slab of 680 mm X 680 mm X 60 mm size. All the work should be carried out as per drawing and direction of E-I-C. The cost of construction includes all the labour and material required tcomplete the work up to the entire satisfaction of engineer in charge of the work |
| 9 | 120 Watt LED street light fittings |
| 10 | HSR Item |
| 11 | 24.2.8.4-LT CABLE 8.4. Supply and erection ofaluminium lugs heavy duty including crimping etc. up to theentire satisfaction of the Engineer-in-charge of the work. 16sqmm |
| 12 | 23.22.5.1-MCCB ,DISTRIBUTION BOARDS,MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply anderection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole |
| 13 | 23.22.5.2-MCCB ,DISTRIBUTION BOARDS,MCB`s, RCCB`s, CHANGE OVER etc. 5.2. Supply anderection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 40 amp to 63 amp. Single Pole |
| 14 | 23.22.1.3-MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.3. Supply anderection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-incharge of the work. RIPLE POLE MCCB 16 to 100 Amp, 25 KA |
| 15 | 24.1.1-EARTHING AND LIGHTENING ARRESTOR 1. Earthing with GL earth pipe 4.5 m long and 40 mm dia with masonry enclosures on the top etc. (but without charcoal or coke and salt) as required. |
| 16 | 23.24.3.2-MS STAND, BUS BAR CHAMBER AND PANELS 3.2. Supply and erection of metal clad bus barchamber made from 1.6 mm thick M.S. sheet and fixing with rag bolts on wall or on existing pedestal/angle iron frame including bonding, detachable top and bottom including painting and necessary connection etc. (Aluminium bars). 100 amp 4 bars of 55 cm each (cross section 25 mm x6 mm) chamber over all size 60 cm x 45 cm x 18cm |
| 17 | 24.5.2.3-MISCELLANEOUS ITEMS 2.3. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 63/50 mm outer dia/inner dia |
| 18 | 24.1.8-EARTHING AND LIGHTENING ARRESTOR 8. Providing and fixing 25 mm x 3mm G.I. strip on surface or in recess for connections etc. as required with all labour and material. |
| 19 | 23.22.5.7-MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.7. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp MCBs FOUR POLE |
| 20 | 24.1.2-EARTHING AND LIGHTENING ARRESTOR 2. Extra for using salt and char coal/coke for pipe earth electrode as required. |
| 21 | 24.4.15.1-STREET LIGHT 15.1. B.S.E.N. 10025 High Masts \\"Supply, installation, testing and commissioning of 12.5 mtr. long High Mast manufactured from B.S.E.N. 10025 or equivalent grade material in, 2 (two) section hot dip, galvanized inside and outside in single dip, suitable for wind velocity as per IS 875 Part-3 suitable for 6 nos. luminaire loading fully motorized (power tool) with starter & cable complete along with standard accessories supplied by the manufacturer with 3 nos. steel wire rope double drum system and twin dome aviation light with LED without foundation but including cost of set of foundation nut and bolts, installation at site complete in all respect upto entire satisfaction of Engineer -in-ChargeThickness of Top and Bottom Section = 3 mm (minimum) Top Dia = 150 mm and Bottom Dia = 360mmThickness of Galvanization - Top = 65 micron (minimum) and Bottom = 85 micron (minimum)\\" |
| 22 | 24.13.24-LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 24. 16 Sq mm 4 core (Arm.) |
| 23 | 24.9.1-RCC FOUNDATIONS FOR HIGH MAST OCTAGONAL POLES 1. Providing RCC foundation of M25 grade (1 Cement:1 Stone aggregate: 2 Coarse sand) i/c excavation, steel reinforcement (Fe 500) @ 75 kg/cum of concrete contents, concrete cover 50mm, anchor bolts etc. over a bed of PCC 1:5:10 of required dimensions for high mast octagonal poles of various heights as per following specifications complete in all respects and as per directions of Engineer-in-charge12.5 m high mast pole |
| 24 | 23.27.3-Supply and erection of Godrej Almirah typeM.S. pedestal made of 50 mm x 50 mm x 6 mm angle iron frame with 3.00 mm thick M.S. sheet covering including shutters with suitable hinges and locking arrangement with Godrej type handle including round bars . The top covering should have downward overhang of 75 mm on all sides of pedestal , having two sets of water proof ventilation holes of suitable size on the sides , at top and bottom , each set containing four Nos. holes to discharge the heat produced by the current . The shutters fixed with rubber gasket of superior quality and of suitable size to make it water proof . The pedestal duly painted both inside and outside with two coats of approved paint and primary coat and its legs are embeded upto the entire depth in 1:2:4 cement concrete block , projected 75 mm all around the pedestal and and 200 mm above the ground level including the cost of all labour and material required to complete the job in all respect upto the entire satisfaction of the Engineer-in-charge of the work:- 3. M.S. pedestal of size 750 mm wide , 1200 mm high ,300 mm deep and bottom totally open , duly embeded in cement concrete block of size 900 mm x 450 mm x 200 mm above ground level , having a base of size 1050 mm x 600 mm x 250 m below ground level . 0 0 Please Enable Macros to View BoQ information |