|
| 1 | Directore Table With ERU Unit and Pedestal | As per attached specification |
| 2 | PA table with ERU | As per attached specification |
| 3 | Back Runner Storage | As per attached specification |
| 4 | Back Runner Storage | As per attached specification |
| 5 | Conference table | As per attached specification |
| 6 | Mid ht storage | As per attached specification |
| 7 | Full height Storage | As per attached specification |
| 8 | Display unit | As per attached specification |
| 9 | Display unit | As per attached specification |
| 10 | Display unit in pantry | As per attached specification |
| 11 | Wooden Partition | As per attached specification |
| 12 | Wall Paneling | As per attached specification |
| 13 | Gypsum false ceiling | As per attached specification |
| 14 | Luster Painting | As per attached specification |
| 15 | Logo Cmet logo For conference | As per attached specification |
| 16 | Logo Satyamev jayte Director cabin | As per attached specification |
| 17 | Name plate DG name | As per attached specification |
| 18 | Index list | As per attached specification |
| 19 | Potred | As per attached specification |
| 20 | Toilet Flush door | As per attached specification |
| 21 | Flush door | As per attached specification |
| 22 | Modification existing wall and Cladding work | As per attached specification |
| 23 | Demolishing Work | As per attached specification |
| 24 | Window and door cladding work | As per attached specification |
| 25 | Basin with granite top along with under storage | As per attached specification |
| 26 | Wooden flooring | As per attached specification |
| 27 | Woolen flooring | As per attached specification |
| 28 | UPVC window | As per attached specification |
| 29 | MDF moulding | As per attached specification |
| 30 | Curtain | As per attached specification |
| 31 | Waterproofing work | As per attached specification |
| 32 | Acostiq paneling for conference | As per attached specification |
| 33 | Electrical Point 5 Amp | As per attached specification |
| 34 | Electrical Point 15 Amp | As per attached specification |
| 35 | 3 Seater couch For Director Cabin | As per attached specification |
| 36 | Recliner For Director Cabin | As per attached specification |
| 37 | Corner Table - Director Cabin | As per attached specification |
| 38 | High Seating For Director Cabin | As per attached specification |
| 39 | Visitor Seating For Director Cabin | As per attached specification |
| 40 | Seating in pantry | As per attached specification |
| 41 | Corner table | As per attached specification |
| 42 | Seating For Conference Room | As per attached specification |
| 43 | High Seating For Conference Room | As per attached specification |
| 44 | 3 Seater Couch For PA Cabin | As per attached specification |
| 45 | Corner table | As per attached specification |
| 46 | Cooling System 4 way cassette AC | As per attached specification |
| 47 | Cooling System 4 way cassette AC | As per attached specification |
| 48 | Cooling System 4 way cassette AC | As per attached specification |
| 49 | Installation work for cooling system | As per attached specification |
| 50 | UPS work | As per attached specification |
| 51 | Philips Tower fan | As per attached specification |
| 52 | Electrical fittings | As per attached specification |
| 53 | Diffused light | As per attached specification |
| 54 | Decorative Light for DG cabin table | As per attached specification |
| 55 | Lan cabel | As per attached specification |
| 56 | MCB Work | As per attached specification |