|
| 1 | Gruop A- DHDT Unit_Electrical Drive Package | Gruop A- DHDT UnitA.1. Electrical Drive Package _Motor+ VFD+ Transformer+Coupling + Accessories_including engineering required for inetgration of package ..... Refer detailed description enclosed under Section 8 of SOR/BOQA.1.1 - High speed Ex d induction motorA.1.2 - VFD _air_water cooled with provision of adding hot standby redundant VFD in futureA.1.3 - Converter duty transformer _K-rated, ONAN_ONAF typeA.1.4 - All other associated items required as per technical specification and detailed Engineering |
| 2 | Gruop A- DHDT Unit _ Mandatory Spares _List as per MR | A.2 - Mandatory Spares _List as per MR for Gruop A- DHDT Unit |
| 3 | Gruop A- DHDT Unit_ Site Training | A.3 -Site Training for Gruop A- DHDT Unit |
| 4 | Gruop A- DHDT Unit _ Site Supervision of Erection or Installation, Testing and commissioning | A.4 - Site Supervision of Erection / Installation, Testing and commissioning for electrical drive package as per requirements specifid in MR for Gruop A- DHDT Unit Day - upto 8 hours work |
| 5 | Group -B-CHT Unit _ Electrical Drive Package | Group -B-CHT UnitB.1 - Electrical Drive Package _Motor + VFD + Transformer +Coupling + Accessories_ including engineering required for inetgration of package..... Refer detailed description enclosed under Section 8 of SOR/BOQB.1.1 - High speed Ex d induction motorB.1.2 - VFD _air_water cooled with provision of adding hot standby redundant VFD in futureB.1.3 - Converter duty transformer _K-rated, ONAN_ONAF typeB.1.4 - 6.6kV CICO Vacuum Circuit Breaker _VCB_ panel B.1.5 - All other associated items required as per technical specification and detailed Engineering |
| 6 | Group -B-CHT Unit _ Mandatory Spares _List as per MR | B.2 - Mandatory Spares _List as per MR for Group -B-CHT Unit |
| 7 | Group -B-CHT Unit _ Site Training | B.3 -Site Training for Group -B-CHT Unit |
| 8 | Group -B-CHT Unit _ Site Supervision of Erection or Installation, Testing and commissioning | B.4 - Site Supervision of Erection _ Installation, Testing and commissioning for electrical drive package as per requirements specifid in MR for Group -B-CHT Unit Day - upto 8 hours work |
| 9 | Group-C-DCU Unit _ Electrical Drive Package | Group-C-DCU UnitC.1 - Electrical Drive Package _Motor + VFD + Transformer +Coupling + Accessories_ including engineering required for inetgration of package..... Refer detailed description enclosed under Section 8 of SOR/BOQC.1.1 - High speed Ex d induction motorC.1.2 - VFD _air_water cooled with provision of adding hot standby redundant VFD in futureC.1.3 - Converter duty transformer _K-rated, ONAN_ONAF typeC.1.4 - All other associated items required as per technical specification and detailed Engineering |
| 10 | Group-C-DCU Unit _ Mandatory Spares_List as per MR | Charges for Mandatory Spares_List as per MR_Group-C-DCU Unit |
| 11 | Group-C-DCU Unit _ Site Training | C.3 -Site Training for Group-C-DCU Unit |
| 12 | Group-C-DCU Unit _ Site Supervision of Erection_ Installation, Testing and commissioning | C.4 - Site Supervision of Erection _ Installation, Testing and commissioning for electrical drive package as per requirements specifid in MR Day - upto 8 hours work |