|
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: SE EDC, Chandauli, PuVVNL, Varanasi. Name of Work : Work related to developing infrastructure for issuing electricity connections in Advance Deposit to consumers within the EDD-Sakaldiha area, specifically for loads up to 150 KW (and covering distances up to 300 meters, in accordance with the guidelines stipulated in the 2026 Cost Data Book), based on applications received through the 'Jhatpat' and 'Nivesh Mitra Portal'. Tender No.: 84/EDC(C)/2025-26 Name of the Bidder Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Details Item Code / Make Qty. Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder (excluding GST) Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT (excluding GST) Rs. P TOTAL AMOUNT(excluding GST) Rs. P. (col.4 X col.13) TOTAL AMOUNT (excluding GST)In Words |
| 2 | Decentralized Materials- B |
| 3 | Danger Board with Clamp |
| 4 | Stone Pad 300x300x75 mm |
| 5 | I-Hook |
| 6 | J-Hook |
| 7 | Dead End Clamp |
| 8 | PG Clamp |
| 9 | F Bracket |
| 10 | E Bracket |
| 11 | Cross Arms Holding Clamp |
| 12 | Aluminium Binding Wire |
| 13 | G.I. Barbed Wire |
| 14 | G.I. Pipe 6\\" Dia |
| 15 | HDPE Pipe 120mm |
| 16 | Bolt, Nut & Washer various size |
| 17 | Distribution Box Clamp |
| 18 | Suspension Clamp |
| 19 | LT Pearcing Connector |
| 20 | Aluminium Lug 70sqmm |
| 21 | Aluminium Lug 150sqmm |
| 22 | LT Fuse Set for upto 100KVA |
| 23 | Labour & Maintainance charges - C |
| 24 | Work of Carriage of 8.5 meter PCC pole with fitting from store centre Sahupuri/Rajatalab to site with loading & unloading. |
| 25 | Work of Erection of Single Pole with 8.5 meter PCC Pole with digging & Fitting of fixtures with accessories (Ms Channel, Holding Clamp, G.I Barbed Wire, Disc Insulator, Danger Board with Clamp, Stone Pad, V-Type Cross Arm, T-Off Channel, Nut & Bolts, Distribution Box with Clamp, G.I. Barbed Wire etc.) as per RESSPO standard. |
| 26 | Work of Carriage of 11 meter ST / PCC pole with fitting from store centre Sahupuri/Rajatalab to site with loading & unloading. |
| 27 | Work of Erection of Single Pole with 11 meter ST / PCC Pole with digging & Fitting of fixtures with accessories (Ms Channel, Holding Clamp, G.I Barbed Wire, Disc Insulator, Danger Board with Clamp, Stone Pad, V-Type Cross Arm, T-Off Channel, Nut & Bolts, Distribution Box with Clamp, G.I. Barbed Wire etc.) as per RESSPO standard. |
| 28 | Work of Carriage & Erection of ACSR Weasel Conductor with all accessories (Pin Insulator, Disc Insulator, PG Clamp) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 29 | Work of Carriage & Mounting of 10 KVA transformer on Single Pole with all accessories (8.5 meter PCC Single Pole with digging & Fitting of fixtures with accessories (Ms Channel, Holding Clamp, G.I Barbed Wire, Disc Insulator, Danger Board with Clamp, Stone Pad, V-Type Cross Arm, T-Off Channel, Nut & Bolts, Distribution Box with Clamp, G.I. Barbed Wire, Lug, Cable etc.) from store centre Sahupuri/Rajatalab to work site and Energizing as per RESSPO standard. |
| 30 | Work of Carriage & Mounting of 25 KVA transformer on DP with all accessories (8.5 meter PCC / ST Dobule Pole with digging & Fitting of fixtures & MS Top Channel, Basec Angle, Droper Angle, Ms Brecing Angle, Holding Clamp, G.I Barbed Wire, Disc Insulator, Danger Board, Stone Pad, 11KV Fuse Set, Lug, Cable etc.) from store centre Sahupuri/Rajatalab to work site and Energizing as per RESSPO standard. |
| 31 | Work of Carriage & Mounting of 63 KVA transformer on DP with all accessories (8.5 meter PCC / ST Dobule Pole with digging & Fitting of fixtures & MS Top Channel, Basec Angle, Droper Angle, Ms Brecing Angle, Holding Clamp, G.I Barbed Wire, Disc Insulator, Danger Board, Stone Pad, 11KV Fuse Set, Lug, Cable etc.) from store centre Sahupuri/Rajatalab to work site and Energizing as per RESSPO standard. |
| 32 | Work of Carriage & Mounting of 100 KVA transformer on DP with all accessories (8.5 meter PCC / ST Dobule Pole with digging & Fitting of fixtures & MS Top Channel, Basec Angle, Droper Angle, Ms Brecing Angle, Holding Clamp, G.I Barbed Wire, Disc Insulator, Danger Board, Stone Pad, 11KV Fuse Set, Lug, Cable etc.) from store centre Sahupuri/Rajatalab to work site and Energizing as per RESSPO standard. |
| 33 | Work of Carriage & Erection of LT AB Cable (1x16+1x25) sqmm Fitting with all Material (Suspension Clamp, Districution Box, Dead End Clamp with I/J-Hook, LT Pearcing Connector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 34 | Work of Carriage & Erection of LT AB Cable (3x50+1x35+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp with I/J-Hook, LT Pearcing Connector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 35 | Work of Carriage & Erection of LT AB Cable (3x95+1x70+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp with I/J-Hook, LT Pearcing Connector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 36 | Work of Carriage & Erection of LT AB Cable (3x120+1x95+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp with I/J-Hook, LT Pearcing Connector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 37 | Work of Carriage & Laying by Open air method of LT XLPE Cable 3.5x50 / 3.5x70 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 38 | Work of Carriage & Laying by Trench method of LT XLPE Cable 3.5x50 / 3.5x70 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. (All required materials like cement, sands, bricks & C.C. trench cover etc. will be provided by contractor) |
| 39 | Work of Carriage & Laying by HDD method of LT XLPE Cable 3.5x50 / 3.5x70 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard by horizontal boring & laying of 120mm dia HDPE pipe after digging of pit by hdd method. |
| 40 | Work of Carriage & Laying by Open air method of 11KV XLPE Cable 3x70 / 3x120 / 3x185 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 41 | Work of Carriage & Laying by Trench method of 11KV XLPE Cable 3x70 / 3x120 / 3x185 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. (All required materials like cement, sands, bricks & C.C. trench cover etc. will be provided by contractor) |
| 42 | Work of Carriage & Laying by HDD method of 11KV XLPE Cable3x70 / 3x120 / 3x185 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard by horizontal boring & laying of 120mm dia HDPE pipe after digging of pit by hdd method. |
| 43 | Work of Carriage & Erection of of 11 KV 3x120 / 3x70 sqmm XLPE I/D, O/D Cable Box after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work. |
| 44 | Work of Carriage & Erection of of 11 KV 3x185 / 3x120 / 3x70 sqmm XLPE I/D, O/D Cable Straight Through after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work. |
| 45 | Work of Carriage & Erection of 11KV CT/PT POLE MOUNTED UNIT 5/5, 10/5 with all accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 46 | Work of Carriage & Erection of Pilfer Proof Metering Cubicle (PPMC) 5/5, 10/5, 15/5, 20/5 with all accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 47 | Work of Carriage & Erection of 11KV Guarding with all accessories ( G.I. Wire, Gaurding Angle, Clamp) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 48 | Work of Carriage & Erection of Earthing Complete with loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 49 | Work of Carriage & Erection of Stay Complete with loading & unloading as per RESSPO standard. |
| 50 | Work of Stay Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 51 | Work of Pole Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. Total in Figures 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |