|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. The contractor has to defect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. |
| 2 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern |
| 3 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 |
| 4 | M-150 Brick Work in 1:4 Cement & Coarse sand of 2.20 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work |
| 5 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) including supply all materials, labour and T & P etc. Complete as per direction of Engineer in Charge. |
| 6 | Neat cement punning. including supply all materials, labour and T & P etc. Complete as per direction of Engineer in Charge. |
| 7 | Plain/ Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & manual placing (9.14 G,case-II) |
| 8 | Plain/ Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications. C-RCC Grade M30 using batching plant transit mixer & Concrete pump (9.15 C) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo- Mechanically Treated bars of grade Fe-500D or more. |
| 10 | Dewatering pump 10 HP |
| 11 | P/L Ready Mix Concrete with 4.5% bitumen content in packing of 25 kg ready mix to use for filling pot holes etc. |
| 12 | P/L applying tack coat using hot straight run bitumen of grade 80/100: on bituminous surface @ 0.50 Kg/Sqm. |
| 13 | Bituminous Concrete Grading 2Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects 507 (5.5B) Please Enable Macros to View BoQ information |