| 1 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 63 KVA DTR |
| 2 | Unloading of damaged transformer, Opening of transformer, draining of oil, opening of HV/LV connections, taking out core, opening of side channels /core laminations (complete job). |
| 3 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of HT Coils (Three Limbs) |
| 4 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of LT Coils (Three Limbs) |
| 5 | Reconditioning of LV Leg Coil…(Copper) |
| 6 | Reconditioning of LV Leg Coil…(Aluminium) |
| 7 | Winding of HV Leg coil….(Copper) |
| 8 | Winding of LV Leg coil….(Copper) |
| 9 | Winding of HV Leg coil….(Aluminium) |
| 10 | Winding of LV Leg coil….(Aluminium) |
| 11 | Impregnation and heat treatment of coils |
| 12 | Cleaning and washing of transformer tank, radiators, top covers etc |
| 13 | Repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any |
| 14 | Painting of transformer tank (inner and outer side), radiators (complete job) |
| 15 | Refitting/Replacement of Bushings only HV/LV |
| 16 | Refitting/Replacement of Bush rods only HV/LV |
| 17 | Filtration &Topping of transformer oil. |
| 18 | Re-assembling, refitting of coils including all sundry items to be replaced and tanking up of assembled job after heat treatment and meggering, refitting & testing of transformer and loading/dispatching of same. |
| 19 | Weighing, stacking and loading of Aluminium/copper Scrap etc |
| 20 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 25 KVA DTR |
| 21 | Unloading of damaged transformer, Opening of transformer, draining of oil, opening of HV/LV connections, taking out core, opening of side channels /core laminations (complete job). |
| 22 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of HT Coils (Three Limbs) |
| 23 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of LT Coils (Three Limbs) |
| 24 | Reconditioning of LV Leg Coil…(Copper) |
| 25 | Reconditioning of LV Leg Coil…(Aluminium) |
| 26 | Winding of HV Leg coil….(Copper) |
| 27 | Winding of LV Leg coil….(Copper) |
| 28 | Winding of HV Leg coil….(Aluminium) |
| 29 | Winding of LV Leg coil….(Aluminium) |
| 30 | Impregnation and heat treatment of coils |
| 31 | Cleaning and washing of transformer tank, radiators, top covers etc |
| 32 | Repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any |
| 33 | Painting of transformer tank (inner and outer side), radiators (complete job) |
| 34 | Refitting/Replacement of Bushings only HV/LV |
| 35 | Refitting/Replacement of Bush rods only HV/LV |
| 36 | Filtration &Topping of transformer oil. |
| 37 | Re-assembling, refitting of coils including all sundry items to be replaced and tanking up of assembled job after heat treatment and meggering, refitting & testing of transformer and loading/dispatching of same. |
| 38 | Weighing, stacking and loading of Aluminium/copper Scrap etc |
| 39 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 100 KVA DTR |
| 40 | Unloading of damaged transformer, Opening of transformer, draining of oil, opening of HV/LV connections, taking out core, opening of side channels /core laminations (complete job). |
| 41 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of HT Coils (Three Limbs) |
| 42 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of LT Coils (Three Limbs) |
| 43 | Reconditioning of LV Leg Coil…(Copper) |
| 44 | Reconditioning of LV Leg Coil…(Aluminium) |
| 45 | Winding of HV Leg coil….(Copper) |
| 46 | Winding of LV Leg coil….(Copper) |
| 47 | Winding of HV Leg coil….(Aluminium) |
| 48 | Winding of LV Leg coil….(Aluminium) |
| 49 | Impregnation and heat treatment of coils |
| 50 | Cleaning and washing of transformer tank, radiators, top covers etc |
| 51 | Repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any |
| 52 | Painting of transformer tank (inner and outer side), radiators (complete job) |
| 53 | Refitting/Replacement of Bushings only HV/LV |
| 54 | Refitting/Replacement of Bush rods only HV/LV |
| 55 | Filtration &Topping of transformer oil. |
| 56 | Re-assembling, refitting of coils including all sundry items to be replaced and tanking up of assembled job after heat treatment and meggering, refitting & testing of transformer and loading/dispatching of same. |
| 57 | Weighing, stacking and loading of Aluminium/copper Scrap etc |
| 58 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 250 KVA DTR |
| 59 | Unloading of damaged transformer, Opening of transformer, draining of oil, opening of HV/LV connections, taking out core, opening of side channels /core laminations (complete job). |
| 60 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of HT Coils (Three Limbs) |
| 61 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of LT Coils (Three Limbs) |
| 62 | Reconditioning of LV Leg Coil…(Copper) |
| 63 | Reconditioning of LV Leg Coil…(Aluminium) |
| 64 | Winding of HV Leg coil….(Copper) |
| 65 | Winding of LV Leg coil….(Copper) |
| 66 | Winding of HV Leg coil….(Aluminium) |
| 67 | Winding of LV Leg coil….(Aluminium) |
| 68 | Impregnation and heat treatment of coils |
| 69 | Cleaning and washing of transformer tank, radiators, top covers etc |
| 70 | Repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any |
| 71 | Painting of transformer tank (inner and outer side), radiators (complete job) |
| 72 | Refitting/Replacement of Bushings only HV/LV |
| 73 | Refitting/Replacement of Bush rods only HV/LV |
| 74 | Filtration &Topping of transformer oil. |
| 75 | Re-assembling, refitting of coils including all sundry items to be replaced and tanking up of assembled job after heat treatment and meggering, refitting & testing of transformer and loading/dispatching of same. |
| 76 | Weighing, stacking and loading of Aluminium/copper Scrap etc |
| 77 | Loading/Unloading of Damaged Distribution Transformers (11KV/0.44KV) 400/500/630 KVA DTR |
| 78 | Unloading of damaged transformer, Opening of transformer, draining of oil, opening of HV/LV connections, taking out core, opening of side channels /core laminations (complete job). |
| 79 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of HT Coils (Three Limbs) |
| 80 | Taking out of all the coils after opening the connections and inspection of coils to asertain the damage of LT Coils (Three Limbs) |
| 81 | Replacing of HT/LT damaged Copper Strip with new copper strip |
| 82 | Reconditioning of LV Leg Coil…(Copper) |
| 83 | Reconditioning of LV Leg Coil…(Aluminium) |
| 84 | Winding of HV Leg coil….(Copper) |
| 85 | Winding of LV Leg coil….(Copper) |
| 86 | Winding of HV Leg coil….(Aluminium) |
| 87 | Winding of LV Leg coil….(Aluminium) |
| 88 | Impregnation and heat treatment of coils |
| 89 | Cleaning and washing of transformer tank, radiators, top covers etc |
| 90 | Repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any |
| 91 | Painting of transformer tank (inner and outer side), radiators (complete job) |
| 92 | Refitting/Replacement of Bushings only HV/LV |
| 93 | Refitting/Replacement of Bush rods only HV/LV |
| 94 | Filtration &Topping of transformer oil. |
| 95 | Re-assembling, refitting of coils including all sundry items to be replaced and tanking up of assembled job after heat treatment and meggering, refitting & testing of transformer and loading/dispatching of same. |
| 96 | Weighing, stacking and loading of Aluminium/copper Scrap etc |
| 97 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 25 KVA DTR at site. |
| 98 | Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers |
| 99 | Dismantling and re-fixing of LV cable circuit of transformer |
| 100 | Dismounting of defective transformer from bed |
| 101 | Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs |
| 102 | Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core |
| 103 | Topping with transformer oil after Filtration/ Reconditioning |
| 104 | Reconditioning of HV coil (aluminium) |
| 105 | Reconditioning of LV coil (aluminium) |
| 106 | Winding of HV coil (Aluminium) |
| 107 | Winding of LV coil (Aluminium) |
| 108 | Replacement of HT/LT Bushing |
| 109 | Replacement of HT/LT Bush Rod |
| 110 | Mounting of repaired transformer on bed |
| 111 | Transportation of material from Divisional workshop Rajouri to the respective site for first 10 kms |
| 112 | Transportation of material for every additional 10 km |
| 113 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 63 KVA DTR at site. |
| 114 | Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers |
| 115 | Dismantling and re-fixing of LV cable circuit of transformer |
| 116 | Dismounting of defective transformer from bed |
| 117 | Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs |
| 118 | Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core |
| 119 | Topping with transformer oil after Filtration/ Reconditioning |
| 120 | Reconditioning of HV coil (aluminium) |
| 121 | Reconditioning of LV coil (aluminium) |
| 122 | Winding of HV coil (Aluminium) |
| 123 | Winding of LV coil (Aluminium) |
| 124 | Replacement of HT/LT Bushing |
| 125 | Replacement of HT/LT Bush Rod |
| 126 | Mounting of repaired transformer on bed |
| 127 | Transportation of material from Divisional workshop Rajouri to the respective site for first 10 kms |
| 128 | Transportation of material for every additional 10 km |
| 129 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 100 KVA DTR at site. |
| 130 | Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers |
| 131 | Dismantling and re-fixing of LV cable circuit of transformer |
| 132 | Dismounting of defective transformer from bed |
| 133 | Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs |
| 134 | Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core |
| 135 | Topping with transformer oil after Filtration/ Reconditioning |
| 136 | Reconditioning of HV coil (aluminium) |
| 137 | Reconditioning of LV coil (aluminium) |
| 138 | Winding of HV coil (Aluminium) |
| 139 | Winding of LV coil (Aluminium) |
| 140 | Replacement of HT/LT Bushing |
| 141 | Replacement of HT/LT Bush Rod |
| 142 | Mounting of repaired transformer on bed |
| 143 | Transportation of material from Divisional workshop Rajouri to the respective site for first 10 kms |
| 144 | Transportation of material for every additional 10 km |
| 145 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 250 KVA DTR at site. |
| 146 | Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers |
| 147 | Dismantling and re-fixing of LV cable circuit of transformer |
| 148 | Dismounting of defective transformer from bed |
| 149 | Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs |
| 150 | Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core |
| 151 | Topping with transformer oil after Filtration/ Reconditioning |
| 152 | Reconditioning of HV coil (aluminium) |
| 153 | Reconditioning of LV coil (aluminium) |
| 154 | Winding of HV coil (Aluminium) |
| 155 | Winding of LV coil (Aluminium) |
| 156 | Replacement of HT/LT Bushing |
| 157 | Replacement of HT/LT Bush Rod |
| 158 | Mounting of repaired transformer on bed |
| 159 | Transportation of material from Divisional workshop Rajouri to the respective site for first 10 kms |
| 160 | Transportation of material for every additional 10 km |
| 161 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 400/500/630 KVA DTR at site if required. |
| 162 | Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers |
| 163 | Dismantling and re-fixing of LV cable circuit of transformer |
| 164 | Dismounting of defective transformer from bed |
| 165 | Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs |
| 166 | Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core |
| 167 | Topping with transformer oil after Filtration/ Reconditioning |
| 168 | Reconditioning of HV coil (aluminium) |
| 169 | Reconditioning of LV coil (aluminium) |
| 170 | Winding of HV coil (Aluminium) |
| 171 | Winding of LV coil (Aluminium) |
| 172 | Replacing of HT/LT damaged Copper Strip with new copper strip |
| 173 | Replacement of HT/LT Bushing |
| 174 | Replacement of HT/LT Bush Rod |
| 175 | Mounting of repaired transformer on bed |
| 176 | Transportation of material from Divisional workshop Rajouri to the respective site for first 10 kms |
| 177 | Transportation of material for every additional 10 km |
| 178 | Loading/Unloading of Damaged Distribution Transformers (11KV/0.44KV) 25 KVA DTR |
| 179 | Unloading of damaged transformer and its dragging. |
| 180 | Loading of damaged DTR for its carriage to CWSP. |
| 181 | Loading/Unloading of Damaged Distribution Transformers (11KV/0.44KV) 63 KVA DTR |
| 182 | Unloading of damaged transformer and its dragging. |
| 183 | Loading of damaged DTR for its carriage to CWSP. |
| 184 | Loading/Unloading of Damaged Distribution Transformers (11KV/0.44KV) 100 KVA DTR |
| 185 | Unloading of damaged transformer and its dragging. |
| 186 | Loading of damaged DTR for its carriage to CWSP. |
| 187 | Loading/Unloading of Damaged Distribution Transformers (11KV/0.44KV) 250 KVA DTR |
| 188 | Unloading of damaged transformer and its dragging. |
| 189 | Complete Inspection of DTR for accessing its damage. |
| 190 | Loading of damaged DTR for its carriage to CWSP. |
| 191 | Loading/Unloading of Damaged Distribution Transformers (11KV/0.44KV) 400/500/630 KVA DTR |
| 192 | Unloading of damaged transformer and its dragging. |
| 193 | Complete Inspection of DTR for accessing its damage. |
| 194 | Loading of damaged DTR for its carriage to CWSP. Please Enable Macros to View BoQ information |