|
| 1 | SUB WORK NO - 1 RCC 10,000 Liter GSR |
| 2 | Item No. 1 : Excavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated materials upto a distance of 50 meter beyond the building area and stacking spreading as directed watering preparing the bed for the foundation and necessary back filling ramming watering including shoring and strutting etc. complete. (lift upto 1.5 m) (Spec No. BD.A.1, Page No.259) (21.1) |
| 3 | Item No. 2 :- Providing dry rubble stone soling 15 cm / 30 cm thick including hand packing finishing compaction etc. complete. |
| 4 | ITEM NO. 3 :- Providing & laying in situ cement concrete M-10 (1:3:6) with trap/granite/quartizite/ gneiss metal in face wall including plywood / steel formwork and steel centering, compaction by vibrator, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give smooth and even surface, filling joints with bitumen, curing etc, complete. ( exculuding cost of reinforcement) The C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only. newly laid concrete shall be covered by gunney bag, plastic, tarpaulin etc. ( Wooden centering/ formwork will not be allowed) |
| 5 | ITEM NO 4-Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water, striking joints on un exposed faces and watering complete. Spec.No.:Bd.H.1PageNo.329 |
| 6 | Designing and constructing RCC G.S.R. / RCC Sumps in M-300 mix of required capacity including excavation in all types of strata foundation concrete container walls bottom slab top RCC roof slab/ or dom 20 mm thick cement plaster with water proofing compound slab top RCC roof slab/ or dom 20 mm thick cement plaster with water proofing compound in CM 1:3 proportion to inside face of the container including epoxy paint from inside including refilling and disposing off surplus stuff within lead of 50 M all labour and materials charges for laying and jointing of pipe assembly for inlet outlet washout overflow & bypass arrangement consisting of C.I.M.S.D/F pipes specials and valve of given diaproviding and fixing accessories such as M.S.Ladder inside and outside C.I. manhole frame and cover water top slab B.B.masonary chamber fro all valves ventilating slabs including givingsatisfactory hydraulic test and water tightness test as per IS Code and perovidingthree coats of cement paints to all exposed surfaces of structure including roof surfaceetc.complete as per design data criteria/obligatory requirements and detailed specification anti termite treatment shall be givinfor under ground portion of the structure etc. complete. |
| 7 | Item No. 6:- Providing ISI mark GI pipe of following class and dia including all local and central taxces, octroi, inspection charges, transportation to stores etc. complete. |
| 8 | Item No.7-Providing & supplying C.I.D.F Sluice Valves with jointining to pipe work (all hardware & Packing) water works quality with non rising spindle, handle wheel without byepass arrangement spindles of stainless steel as per requirment |
| 9 | Item No. 8:- Providing fixing GI specials and acessories such as tee, bend ,saddle pice ,bib cocks of required diameters including all local and central taxces, octroi, inspection charges, transportation to stores etc. complete. |
| 10 | Item No 9-Providing and erecting and giving test of submersible pump set confirming to IS 8034 and motor confirming to is 9283 with water proof winding pump shall be sutable etc complete |
| 11 | Item No 10 Providing and supplying neccesary arrangment and fitting aranagment for pump set |
| 12 | Item No.11 Providing and supplying in stanadard lenghts polythelene pipe confirming t0 is 4984/14151 with neccesary jointing material like mechanical means etc complete |
| 13 | Excavation for foundation /pipe trenches in soft rock and old cement and Lime masonry foundation asphalt road including removing the excavated material up to a lead of 50 m beyond the lift as below ,Stacking as directed by Engineer-In-Charge normal dewa |
| 14 | Item No.13 Providing and fixing Mandatory /regulatory sign board in circular shape of1200 mm dia made out of 2mm aluminium sheet bounded with white retro reflective etc complete |
| 15 | SUBWORK NO 2 :- SYNTEX TANK AND WATER SUPPLY ARRANGEMENT |
| 16 | Item No. 1 Providing and fixing white glazed earthenware wash hand basin of 45 cm X 30 cm size including cold water pillar tap/cold and hot water piller tap brackets, rubber plugs and brass chain, stop tap and necessary pipe connection including PVC waste pipe and trap up to the outside face of the wall Making good the damaged surface, testing etc. complete (PWD DSR 2019-20 Item No. 41.64, Page No.348) |
| 17 | Item No. 2 Providing and fixing H.D.P container Syntex or alike one piece moulded water tank made out of low density polythyler and built corrugation including of delivery upto destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity above 1000 to 20,000 litres(PWD DSR 2019-20 Item No. 42.54, Page No.358) |
| 18 | Syntex Tank |
| 19 | Item No 3 Providing and fixing on walls / ceiling/floor 15 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipeline if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.(PWD DSR 2019-20 Item No. 42.55, Page No 359) |
| 20 | Item No 4 Providing and fixing on walls / ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipeline if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.(PWD DSR 2019-20 Item No. 42.56, Page No 359) |
| 21 | Item No 5 Providing and fixing on walls / ceiling/floor25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipeline if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.(PWD DSR 2019-20 Item No. 42.57, Page No 359) |
| 22 | Item No. 6 Bib cock cock stop tap brass heavy 25 mm (PWD DSR 2022-23 Item No. 68, Page No.520) |
| 23 | Item No. 7 Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x0.90m size made out 18 gauge (1.25mm)thick mild steel sheet painted with one coat of Zinc chromate stoving primerandtwocoatsofenamelpaintonfrontsideandgreystoveenamelonbacksideandborder/messages/symbolsetc.withapprovedcolourshadepaintcomplete,onM.S.angleofsize35x35x3mmframewithproperlycrossbracedM.S.anglesofsize35mmx35mmx3mmdulypaintedincludingTwoM.S.angleironpostsofsize65mmx65mmx6mm,3.65mlongpaintedwithalternateblackandwhitebandsof25cmwidthincludingallfixturesetc.andfixingtheboardsin1:4:8concreteblockofsize60cmx60cmx75cmincluding,excavation,refilling,transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge |
| 24 | Subwork no 3-Distribution Main |
| 25 | Item No-1 Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, includingtransportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. |
| 26 | 63mm dia, Working pressure 4kg/sq.cm |
| 27 | Item No-2 Providing & supplying C.I.D.F Sluice Valves with jointining to pipe work (all hardware & Packing) water works quality with non rising spindle, handle wheel without byepass arrangement spindles of stainless steel as per requirment |
| 28 | Item No-3 Excavation for foundation /pipe trenches in soft rock and old cement and Lime masonry foundation asphalt road including removing the excavated material up to a lead of 50 m beyond the lift as below ,Stacking as directed by Engineer-In-Charge normal dewatering , preparing the bed for foundation and excluding back filling, etc .Complete |
| 29 | Item No-4 Excavation for foundation/pipe trenches in Hard Murum including removing the excavated material up to a distance of 50 m and lifts as below ,stacking and spreading as directed by Engineer-In-Charge, normal dewatering ,preparing the bed for foundation and excluding back filling, etc.complete.[DSR 2023-24/42/2] |
| 30 | Item No-5 Excavation for foundation /pipe trenches in soft rock and old cement and Lime masonry foundation asphalt road including removing the excavated material up to a lead of 50 m beyond the lift as below ,Stacking as directed by Engineer-In-Charge normal dewatering , preparing the bed for foundation and excluding back filling, etc. Complete [DSR 2023-24/42/5] |
| 31 | Item No-6 Excavation for foundation /pipe trenches in Hard rock and Chiseling asphalt road including removing the excavated material up to a lead of 50 m beyond the lift as below ,Stacking as directed by Engineer-In-Charge normal dewatering , preparing the bed for foundation and excluding back filling, etc. Complete [DSR 2023-24/42/5] |
| 32 | Item No 7: Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layersincluding watering and compaction, etc.complete.(Bd-A-10/263) |
| 33 | Item No 8:Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost of conveyance from stores to site of works includingcost of all labour, material, except cement solvent, rubber ring, giving satisfactory hydraulic testing as per IS code, etc. complete (with cement solvent joint / ring fit joint).Also 10% is added for pipes specials |
| 34 | 63mm dia, Working pressure 4kg/sq.cm |
| 35 | Item No 9:Refilling the trenches with available excavated stuff with soft terial first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 36 | Item No.1-Designing.Providing, supplying and commissioning of Drinking Water vending machine (ATM) including installation, necessary plumbing and electrification. Two years full warranty and maintenance of machine excluding consumable iems (Labour only).Agency shall get the source water tested and design the plant as per the standards.water quality test certificate of product water shall be as per IS 10500.Third party inspection of the entire machine shall be done as directed by Engineer-in Charge. ( 500 LPH) |
| 37 | Supplying, installing, testing and commissioning of 2 kWp ON-GRID Solar PV System / Plant consisting Solar PV Poly Crystalline Panel (550 Wp X 4 Nos.) and Solar ON-GRID Inverter of similar capacity (THD<3%) with interconnecting wires / cables up to solar ON GRID inverter, proper base plate, canopy box to house Inverter and necessary accessories i.c. ACDB/ DCDB, MCB etc. wiring up to solar Inverter in casing and capping, display board, sign board, two distinct earthing, lightning arrester, liaisoning charges, remote monitoring system with maintaining card/chip for 5 years including net charges for RMS System, complete up to net meter installation and export to the grid with 5 year ON-SITE warranty and fully comprehensive maintenance contract as per Specification no. ESD-RT-ONG 58720+58720+5% = 123312 |
| 38 | Additional MSEDCL Charges for Net Metering System at proposed for PWS Scheme including Solar Net Meter, Panel Cables, Earthing etc complete |
| 39 | Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates, etc. as per detailed design and drawing or as directed by Engineer- in charge including cutting, fabricating, hoisting, erecting and fixing in position, making riveted/bolted/welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-8/278) |
| 40 | For structure Providing and applying material & labour for hot dip galv anizing of above structure including transport for galvanizing as per R.C |
| 41 | Supplying and installation of Solar PV Module cleaning unit consisting of nozzles spray, necessary pipes, valves, post, electronic panel board concealed with weather proof cabinet, spreading water periodically for removal of dust, related motor pump, controller, timer and nozzles set suitable for covering 5 KW Solar PV Module. (Approx. 35 Sq. Mtr. PV Module area). For 5Kwp 22541+ 5%= 23668.05 Please Enable Macros to View BoQ information |