Tender For Supply Installation Testing And Commissioning Of Unified Regulation System (Urs) For Street Light With Automated Load Control And Monitoring In Uda, Udaipur. 9403, Udaipur-Rajasthan
TDR : 54917198
Tender Notice
BOQ
13 Days Left
Udaipur
Rajasthan
Tender For Supply Installation Testing and Commissioning of Unified Regulation System (Urs) For Street Light With Automated Load Control And Monitoring In Uda, Udaipur. 9403
Name of Work:- SITC of Unified Regulation System (URS) for Street Light with Automated Load Control and Monitoring in UDA, Udaipur. 9403
Sl. No.
Item Description
1
Supply, Installation, Testing & Commissioning of a Unified Regulation System (URS) for existing street lights that meets the following specifications: The system must feature a 240 MHz dual-core processor with GSM/GPRS communication capabilities and support for OTA firmware updates. It should come with an internal class 1.0 energy metering system that can provide real-time data of crucial electric load parameters along with fault and theft alerts capable of measuring voltage, current, power factor, kWh and load parameters. The URS must include remote load scheduling and control functionalities with a feedback time of less than 15 seconds. The enclosure conforms to IP65 standards, and be fire-retardant, weatherproof, and rustproof. The system should use a lightweight protocol MQTT / HTTPS based lightweight communication protocol for secure, real-time communication and include cloud-based software for comprehensive device management and remote control Web based central monitoring dashboard and mobile application. It should be able to control three phase street light load upto 8.5 KW and should come with 4 pole MCB upto 40A at Input and individual MCBs upto 40A at output for short circuit protection. Include the cost of SIM cards with a pre-paid data/voice plan for the entire 03-year warranty/subscription period & all necessary industrial-grade cables (input/output), glands, lugs, and mounting hardware required for SITC at the switching point & 03 years of Comprehensive On-site Warranty (DLP) and Operation & Maintenance (O&M). URS will be installed at site as per direction of engineering Incharge. Three phase load up to 8.5 kW
2
Three phase load up to 8.5 kW Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.