| 1 | Excavation in trenches not exceeding 1.50 m wide and n exc. 1.5 m in depth; for foundation, etc, or for shaft, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sqm on plan and getting out in soft/loose soil complete all as specified and as directed. |
| 2 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm complete all as specified and directed. |
| 3 | Removing excavated material not exc 50 m and depositing where directed at a level not exc 1.50m above the starting point including spreading and levelling complete all as specified and directed. |
| 4 | Demolition of brickwork or stone/boulder masonry, precast cement concrete block walling in any position, built in cement mortar including all quoins, arches, pillars etc,complete all as specified and directed. |
| 5 | M&L for Pre cast cement concrete block masonry with solid block, (1:3:6) type C1 (using 20mm graded stone aggregate), exc.10 cm in width and setting in cement mortar 1:6 complete all specified and directed. |
| 6 | M & L Providing precast cement concrete solid building blocks or slabs (1:3:6) type C1, 10cm thick (with plain or interlocking joints as directed) setting in cement mortar 1:4 as in walls complete all as specified and directed. |
| 7 | Demolition and breaking up drain pipes 150mm bore (salt glazed ware, AC or reinforced concrete) set in cement mortar complete all as specified and directed. |
| 8 | Supply & laying Double wall corrugated (DWC) HDPE pipe of 150mm bore (SN-8), thickness greater than 1.30 mm, single socketed in any length with rubber ring joints, laid in trenches or fixed in floor complete all as specified and directed. |
| 9 | M&L for concrete bed to drain pipes including packing under and haunching against the sides of pipe after they are laid and tested in cement concrete 1:3:6 type C2 for 150 mm bore of pipe complete all as specified and directed. |
| 10 | Taking down cement plaster on brick or concrete surfaces of any discription etc including raking out joints ,hacking for key, scrubbing down with water and removal of rubbish from the premises complete all as specified and directed. |
| 11 | M&L for 15mm thick rendering in cement mortar (1:4) mixed with water proofing compound @ 200ml per 50 Kg weight of cement or as per manufacturer's instruction finishing the surfaces even and smooth without using extra cement complete all as specified and directed. Note: Liquid waterproofing compound shall be measured and paid separately. |
| 12 | Supply only Liquid water proofing compound |
| 13 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified and directed. |
| 14 | Demolition of cement concrete (un-reinforced) in ground floor and paving not exc. 15cm thickness (below or above ground level) and removing debries from site of work complete all as directed by the Engineer-in-Charge. |
| 15 | M&L for cement concrete 1:4:8, type D2 (using 40 mm graded stone aggregate) as in foundation, filling and mass concrete complete all as specified and as directed |
| 16 | M&L for cement concrete type B2 1:2:4 (using 40 mm graded stone aggregate) as in surface channels and drains complete all as specified and directed. |
| 17 | M&L for 75 mm thick cement concrete 1:3:6 type C2 using 40 mm graded aggregate as in plinth protection finished fair and even with using extra cement complete all as directed. |
| 18 | Dismantling of floor hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. |
| 19 | M&L for non-skid ceramic coloured tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.06 sqm but not exceeding 0.11 sqm as in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match laid over and including 15 mm thick cement mortar 1:6 screed bed for laying of floor finishes complete all as specified and directed. |
| 20 | Material and labour for coloured glazed ceramic tiles in vertical surfaces 350 x 250 x 7mm/450 x 350 x 7 mm thick set and jointed in neat cement slurry and pointed in white or colour cement to match over and including 10 mm thick rendering (backing coat) in cement mortar 1:4 complete all as specified and directed. |
| 21 | M&L for sunken treatment of Toilet/Bathroom as in following steps:- i) Top of RCC slab in sunken portion including peripheral beams shall be plastered with 15mm thick in cement mortar 1:3 using approved water proofing compound @ 3% by weight of cement, finished even and smooth using extra cement, curved at the junctions. ii) Apply two coats of epoxy resin/polymer modified cementatious coating like brush bond for both on floor & beams. iii) Sunken slabs to be given 1:20 slope outward 25mm GI pipe(medium grade) spout with 300 mm projection beyond outer surface of wall shall be provided. iv) Water tightness of sunken portion to be tested by ponding with water for 72 hours. In case of even a slight mark of seepage, the portion to be treated and ponding shall be carried out again to confirm the water tightness of sunken slab. Note : (i) No cutting in roof slab/beam shall be allowed for passing of CI pipes & fittings.The stage of water proofing to sunken slab shall be passed by Eng-in-charge/GE. (ii) water proofing compound shall be measured and paid separately |
| 22 | M & L for 25mm thick PCC type B-1, 1:2:4 (20mm graded stone aggregate) as in floor complete all as specified and directed. |
| 23 | M&L for cement concrete 1:5:10, type E2 (using 40 mm graded stone aggregate) as in foundation filling and mass concrete complete all as specified and as directed |
| 24 | Demolition of RCC of any description and in any position not otherwise specifically provided for including taking out and separating old reinforcement and removal of debris to a distance not exceeding 50m as directed by Engineer-in-Charge and making site clean complete all as specified and directed. |
| 25 | M&L for precast RCC type B-1, 1:2:4 (using 20 mm graded stone aggregate ) as in cover slab set in cement mortar 1:4 including necessary form work if required complete all as specified and directed. |
| 26 | M&L for TMT bars 6 mm to 8 mm dia cut to length bent to shape required including cranking, bending spirally for hooping for columns hooking ends and binding with and including mild steel wire ( annealed) not less than 0.9 mm dia complete all as specified and directed. |
| 27 | M&L for MS deformed or twisted bars 10mm dia and over, cut to length, bent to shape as required including cranking, bending hooking ends and binding with mild steel wire (annealed) not less than 0.9 mm dia complete all as specified and as directed Please Enable Macros to View BoQ information |
| 28 | M&L for MS deformed or twisted bars 10mm dia and over, cut to length, bent to shape as required including cranking, bending hooking ends and binding with mild steel wire (annealed) not less than 0.9 mm dia complete all as specified and as directed Please Enable Macros to View BoQ information |