|
| 1 | Dismantling plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings etc complete all as specified and directed. |
| 2 | S&F for Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet (PPGL) 0.50mm thick of an colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and directed. |
| 3 | S&F for Pre-painted galvalume aluminum zinc coating GI based Plain steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in ridge , fixed with self tapping screws complete all as specified and directed. |
| 4 | Dismantling of Mild Steel Work of any description not otherwise provided for complete all as specified and directed. |
| 5 | M&L for Steel rolling shutters 1.25mm thick, as specified including top cover, anchoring rod, hasp and staple and one shop coat of primer; erected in position as indicated, complete gear operated type with bevel gear box and crank handle including ball bearing and Safety lever locks mild steel with 4 levers for rolling shutters complete all as specified and directed. |
| 6 | M&L for preparation of newly steel surfaces of any description, over 10cm in width or girth,not otherwise described two coats of synthetic enamel paint over one coat of red oxide, zinc chrome primer complete all as specified and directed. |
| 7 | M&L for Preparation of old surfaces plastered or unplastered by mechanical sander brooming down or steel wire brushing scraping down oil & greasy spots etc and applying one coat of oil distemper on old decorated surfaces of walls include cornices complete with roller complete all as specified and directed. |
| 8 | M&L for Preparation of old surfaces plastered or unplastered by mechanical sander brooming down or steel wire brushing scraping down oil & greasy spots etc and applying one coat of white wash on old decorated surfaces on ceiling cornices complete all as specified and directed. |
| 9 | M&L for Preparation of old surfaces plastered or unplastered by mechanical sander brooming down or steel wire brushing scraping down oil & greasy spots etc and applying one coat of white wash on old decorated surfaces on ceiling cornices complete all as specified and directed. |
| 10 | M&L Preparation of old surface (wall/chajja) shall include brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm including filling up all cracks and defects with CM 1:3 complete all as specified and directed.Note : Height of bldg may be upto 12.00M. |
| 11 | Demolition of Concrete of any description an in any position not otherwise specifically provided for complete all as specified and directed. |
| 12 | M&L for 75 mm thick PCC 1:3:6 B-2 using 40mm graded aggregate for plinth protection to finished even and smooth with using extra complete all as specified and directed. |
| 13 | M & L for 100 mm thick PCC, 1:2:4 type B-2 using 40 mm graded aggregate as in sub-floors, sub-bases, floors and pavings etc complete all as specified and as directed |
| 14 | M&L for Cement concrete work in pavement/hard-standing of flexural strength 40 kg/per square centimetre in field using 400 kg of cement per cubic metre, thickness of concrete 25 cm or less, etc completed all as specified and directed |
| 15 | Supply only polyester triangular synthetic fibres 6/12mm long with circum circle diameter 30-35 micron desgined for melting point 240 -260 degree celsius having specific gravity 1.34 to 1.4 Recron 3S manufactured by M/s Reliance Industries Ltd Mumbai or M/s Finolex Industires Ltd or equivalent as secondary reinfocement in all type of concrete @0.25% by wt of cement complete (@1.0 Kg per cum of PQC) complete all as specified and as directed. |
| 16 | Finishing top concrete pavement with wire brush while concrete is green .complete all as specified and as directed |
| 17 | M&L for Repair/replacement of Dummy Joint in old concrete pavement Racking out of old existing sealant compound and back up rod of the existing joints by special tools like cutting blades/machines, widening of joints by 2 mm by using joint cutting blades of appropriate size straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil vegetation and other debris Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before pacing the backup rod and pouring the sealant. Thereafte filled with closed cell, medium density, cross linked polyethylene foam backup rod of 8 mm dia for complete length of the joint, over it to be filled with polyurethane joint sealant meeting the requirements mentioned in BS-5212, BS 4254 and EN-141875- 2003 with minimum movement accommodation factor (MAF) of+!- 30% .complete all as specified and as directed. |
| 18 | Racking out of old existing sealant compound, back up rod and filler board of the existing joints by specia tools like racker/cutting blades/machines , widening of joints by 2 mm by using joint cutting blades of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the filler board and pouring the sealant Thereafter filled with pre-molded 25 mm thick compressible polyethylene closed cell type filler board as specified , over it filled with closed cell medium density, cross linked polyethylene foam backup rod of 30 mm dia for complete length of the joint. Finally filled with polyurethane joint sealant meeting the requirements mentioned in BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor MAF of+/- 30% complete all as specified and as directed. |
| 19 | S&F in repair Anodised aluminium grill (anodised transparent or dyed to required shade according to IS: 1868 with minimum anodic coating of grade AC 15) of approved design/pattern, with approved standard section and fixed to the existing bird roofing to hanger ceiling with C.P. brass/ stainless steel screws @ 200 mm centre to centre, including cutting the grill to proper opening size for fixing and operation of handles and fixing approved anodised aluminium standard section around the opening, complete all as specified and as directed. |
| 20 | S&F for Mild Steel work , as in framed work such as Grills, Gratings, Ladders etc with ends of bars shouldered and/or riveted, or forged into spikes, framed Guard Bars, Barred Iron Doors, gates, Ladders, framed Balusters, Walk Ways, Railings, framework of Water Tanks and similar work confirming to Fe - 290, Grade E-165 complete all as specified and as directed. Please Enable Macros to View BoQ information |